![]() Installation for storing of natural gas
专利摘要:
An installation for storing of natural gas or some other fluid comprises a lined underground storage space. Inside the rock wall of the storage space there is a concrete layer for supporting an inner impermeable lining layer. According to the invention, the concrete layer has a crack distribution control reinforcement layer closer to the impermeable lining layer than to the rock wall in order to divide large cracks into smaller cracks and distribute the cracks over a larger area of the impermeable lining layer. Further, also according to the invention, there is between the impermeable lining layer and the concrete layer a non-binding sliding layer to facilitate relative movements between the impermeable lining layer and the concrete layer. 公开号:US20010002969A1 申请号:US09/726,069 申请日:2000-11-29 公开日:2001-06-07 发明作者:Jan Johansson 申请人:Sydkraft AB; IPC主号:F17C1-007
专利说明:
[0001] The present invention relates to an installation for storing of natural gas at high pressures of between about 3 and about 25 MPa and temperatures of between about −30° C. and 60° C., of the type defined in the preamble to claim 1. [0001] [0002] A rock cavity for storing of natural gas under pressure must fulfil a number of general criteria in respect of the pressure-absorbing capacity; among other things, the rock cover above the storage space must be capable of preventing up-lift or elevation, and the deformations in the surrounding rock must be limited when subjected to the existing pressure, such that they do not result in the elongation capacity of the impermeable lining layer being exceeded. In addition, it must be possible to drain groundwater from the surrounding rock to prevent damage to the impermeable lining layer of the storage space, said impermeable lining layer in most cases being made of steel plate. [0002] [0003] The vital part of a lined gas storage space is a sandwich element which comprises the impermeable lining layer (in most cases steel plate, but in some cases also plastic), the concrete layer and the surrounding rock. Each of these elements has a function, i.e. the impermeable lining layer has the gas-sealing function, the concrete casing has the pressure-transmitting function and, finally, the rock has the pressure-absorbing function. At the same time the three elements must work together although it is a matter of a complex interaction between the structural parts when the system is pressurised. It is in fact important for the sandwich construction to retain its impermeability also after being subjected to pressure. The application of pressure leads to cracking in the concrete layer and deformation of the impermeable lining layer. The construction must, however, counteract the development of cracks in the impermeable lining layer. Furthermore the construction should be such as to allow draining of groundwater. [0003] [0004] When storing pressurised natural gas in rock cavities, an impermeable lining layer of steel plate has been suggested in most cases. In this connection, use has been made of either steel plate or steel sheet. In a lined rock cavity concept, a pressure of up to 20 MPa has frequently been used. [0004] [0005] To reduce the risk of leakage in the rock mass, a drainage layer has sometimes been arranged between the impermeable lining layer and the rock wall. WO 90/08241 describes this known technique. According to this publication, a gas storage tank has an inner shell of steel plate supported by a layer of corrugated steel sheet. The latter layer is anchored to the rock wall by means of rock bolts and has inwardly directed fixing projections that serve as attachments for the impermeable lining layer so as to prevent it from moving relative to the layer of corrugated steel sheet. [0005] [0006] WO 86/01559 discloses one more known technique for lining a gas storage rock cavity. As impermeable lining layer, use is made of an inner shell made of steel plate, surrounded and supported by annular connecting elements. These are anchored to the rock wall and also to the steel plate inner shell. Between the inner shell and the rock wall there is a filling material which in some embodiments consists of on-site cast concrete. [0006] [0007] A similar technique is disclosed in EP-B-0 153 550, which concerns a method of building large cylindrical storage tanks with concentric plate walls, of which the outer abuts against a prestressed concrete wall and between which an insulating layer is arranged. [0007] [0008] EP-A-0 005 133 also discloses a gas storage tank which is placed in a rock cavity shaft and stands freely in this shaft. In one embodiment, the shaft is provided with a lining of water-tight concrete and a cast concrete floor. [0008] [0009] EP-A-0 401 154 discloses a free-standing gas storage tank with a gas-tight inner wall made of steel plate material and a force-absorbing outer wall made of prestressed concrete, an insulating layer being arranged between the inner wall and the outer wall. [0009] [0010] WO 85/04214 also discloses a rock cavity storage space for storing, inter alia, gases. In this case, the rock wall has first been provided with a water-permeable layer of sprayed concrete, which serves as a drainage layer for groundwater and which constitutes a supporting surface for an inner lining of, for instance, concrete and steel plate. [0010] [0011] WO 89/02864 discloses a rock cistern for pressurised storing of natural gases. The walls of the cistern comprise a sprayed concrete layer next to the rock wall which is reinforced through anchoring bolts. The concrete layer is covered by a sealing comprising one reinforced sealing layer and one unreinforced plastics layer. The layers are bonded to the rock surface by means of a binding layer which serves to transfer stresses, in the form of limited shear stresses, between the sprayed concrete and the overlaying sealing layer. [0011] [0012] GB-A-2 215 023 discloses an underground fluid storage cavern for storing low pressures of 0.1 to 5 MPa at temperatures of −80 to −170° C. The cavern wall comprises a tight inner layer and a porous concrete layer between the rock surface and the tight inner layer. Compressed air is fed into this porous concrete layer to maintain the air pressure at a pressure greater than the ground water pressure. [0012] [0013] U.S. Pat. No. 3,683,628 discloses a reservoir for storing fluids in underground cavities. In this case sheets of impermeable plastic material are secured placed between a concrete layer and a fluid tight flexible liner. This reservoir is not suited for the storing of natural gas at high pressures of between about 3 and about 25 MPa and temperatures of between about −20° C. and 60° C. [0013] [0014] GB-A-493 893 discloses a cistern or reservoir for the storage of hydrocarbon fluids at about atmospheric pressure. The cistern wall comprises several layers which are separated by and bonded to each other by means of a plastics layer. This construction is not suited for the storage of natural gas at the pressures and temperatures contemplated herein. [0014] [0015] WO 87/00151 discloses rock cavern having a wall comprising a drainage layer and a concrete layer next to the rock and a sealing layer next to the inside of the cavern. The concrete layer is bolted to the rock. The sealing layer consists of thin steel sheet strips welded together and spot-welded to a strip steel attached to the concrete layer. [0015] [0016] The known embodiments of rock cavity storage spaces for storing pressurised gas have various drawbacks, inter alia, that there is still a great risk of cracking in the impermeable lining layer and harmful cracking in the concrete layer supporting the impermeable lining layer. [0016] [0017] One object of the present invention therefore is to provide a gas storage installation, in which these and other drawbacks are eliminated or considerably reduced. [0017] [0018] This and other objects of the invention are achieved by a storage installation of the embodiment defined in the independent claim. The dependent claims define particularly preferred embodiments of the invention. [0018] [0019] In summary, the invention is related to an installation for storing of natural gas or some other fluid, e.g. compressed air. This installation comprises a lined underground storage space. Inside the rock wall of the storage space there is a concrete layer for supporting an inner impermeable lining layer. According to the invention, there is between the impermeable lining layer and the concrete layer a non-binding sliding layer to facilitate relative movements between the impermeable lining layer and the concrete layer. The concrete layer has a crack distribution control reinforcement layer closer to the impermeable lining layer than to the rock wall. The basic idea of the invention is not to completely avoid the propagation of cracks from the rock through the concrete layers to the impermeable lining layer but to intentionally distribute the cracks over a larger area by dividing large cracks into several smaller cracks, thus distributing shear forces acting on the impermeable lining layer over a larger area thereof. [0019] [0020] Such a distribution of shear forces decreases the risk of deforming the lining layer to such a degree that cracks develop in the impermeable lining layer also when the impermeable lining layer is subjected to cyclic deformation during use of the cavern. [0020] [0021] An embodiment of an installation according to the present invention will now be described in more detail with reference to the accompanying drawings, in which [0021] [0022] FIG. 1 is a schematic view of an installation for storing of natural gas in a lined rock cavity; [0022] [0023] FIG. 2 shows an example of a known technique for designing the lining in such a rock cavity or storage space; and [0023] [0024] FIG. 3 shows an embodiment of the lining in an installation according to the present invention. [0024] [0025] FIG. 1 shows schematically an embodiment of an installation for storing of natural gas in an underground rock cavity. The installation comprises a storage space or rock cavity [0025] 10 with a rock wall 11 with a lining 12. The lining 12 comprises a concrete layer 13 adjacent to the rock wall 11 and an impermeable lining layer 14 adjacent to the actual storage space. [0026] From the upper end of the storage space [0026] 10 extends a feed and discharge pipe 21 for gas injection and gas withdrawal. The pipe 21 is connected to a station for metering, pressure regulation and compression of the gas in a surface installation 22. [0027] In a common type of known installations of this type use is made of a lining of the type shown in FIG. 2. In this case, the drainage pipes [0027] 23 have been arranged closest to the rock wall 11. The impermeable lining layer 14 is made of steel plate which abuts directly against the concrete layer 13. When the installation is pressurised or if settlements should occur in the surrounding rock, cracks 24 may form in the concrete layer. In many cases, cracks 25 also form in the rock wall 11. In cracking, a deformation of the impermeable lining layer or steel plate 14 will occur, and with no crack control the deformation can be so considerable that microcracks or larger cracks may appear in the impermeable lining layer. [0028] FIG. 3 shows how the risk of leakage can be reduced or completely eliminated. In the installation according to the present invention, the lining has been built up in a special manner. Like in prior-art technique, drainage pipes [0028] 23 can be arranged closest to the rock wall 11. In the embodiment shown, these drainage pipes 23 have been covered with a porous layer 26 of sprayed concrete (or “shotcreate”). The porous layer 26 of sprayed concrete has two functions. One is to serve as a layer making it difficult for cracks in the rock wall 25 from propagating inwards to the centre of the tank through intervening layers, and the other is to increase the transport of liquid or fluid to the drainage pipes 23. [0029] On the outside of the layer [0029] 26 of sprayed concrete there is a further concrete layer 27, which preferably is of a type that will be described in more detail below. According to the invention a reinforcement 28 which preferably consists of a welded mesh reinforcement is arranged closer to the surface of this concrete layer 27 and the impermeable lining 14 than to the rock wall 11. As shown, this welded mesh reinforcement is arranged close to the impermeable lining 14. At present, mesh sizes in the range of from about 5 or 10 cm to about 40 or 30 cm are considered appropriate for the intended purpose. [0030] Also according to the invention, a non-binding sliding layer [0030] 29 is arranged between the concrete layer 27 and the impermeable lining layer 14 made of steel plate. The non-binding sliding layer can be made of a material with good viscous properties such as asphalt or bitumen, which can contain its own reinforcement. The purpose of the non-binding sliding layer is to facilitate a relative movement between the concrete layer 27 and the impermeable lining layer 14 in order to distribute the deformation imposed by the opening and closing of cracks in the concrete, over a longer distance and thus to smoothening out peak strain in the lining. [0031] By arranging the reinforcement in the outer part of the concrete layer any larger cracks propagating from the rock wall through the concrete layer will be intentionally divided into smaller cracks and distributed over a larger area of the wall. Thus, shear stresses acting on the lining layer [0031] 14 due to the formation of cracks will be distributed over a larger area of the lining layer 14. This distribution of shear forces decreases the risk of deforming the lining layer to such an extent that microcracks or other cracks develop in the impermeable lining layer due to cyclic deformation during the use of the storage cavern. [0032] In fact, it has been found that the distribution of the cracks and the relative movement between the concrete and lining layers considerably reduces the tendency to cracking in the impermeable lining layer, which will probably be due to the fact that the shear forces are distributed over a larger surface area of the lining so that the tractive forces are not directly transferred from the concrete layer [0032] 27 to the impermeable lining layer 14 when cracks arise in the concrete layer. [0033] In prior-art constructions of the type shown in FIG. 2, there is thus in many cases strong adhesion between the impermeable lining layer and the concrete layer. Further, in prior-art constructions an intentional division of larger cracks into smaller cracks has not been suggested. [0033] [0034] To further reduce the tendencies to cracking in the impermeable lining layer, the concrete layer [0034] 27 in an installation according to the present invention could be made of so-called self-compacting concrete containing additives which result in the need for vibration being obviated. Thus it is a matter of a self-compacting type of concrete which resembles flow concrete but, in contrast, need not be vibrated to achieve a high degree of non-porousness. By using this type of concrete, the risk of cracking in the concrete layer 27 will be even smaller since cracking in concrete in many cases depends on precisely insufficient vibration during the casting process. Further such a type of concrete will also make it possible to decrease the wall thickness of the concrete wall and to reduce the risk of unwanted cavity formation and voids to develop in the concrete wall.
权利要求:
Claims (5) [1" id="US-20010002969-A1-CLM-00001] 1. An installation for storage of natural gas or some other fluid, said installation comprising a lined underground storage space (10) having on the one hand a gas-sealing impermeable lining layer (14) and, on the other hand, a concrete layer (27) between the impermeable lining layer and the exterior rock wall (11), characterised in that the concrete layer (27) has a crack distribution control reinforcement layer (28) closer to the impermeable lining layer (24) than to the rock wall (11) in order to divide larger cracks into smaller cracks, and that between the concrete layer (27) and the impermeable lining layer (14) there is a non-binding sliding layer (29) to facilitate relative movements between the impermeable lining layer and the concrete layer. [2" id="US-20010002969-A1-CLM-00002] 2. An installation as claimed in claim 1 , characterised in that between the rock wall (11) and the concrete layer (27) with crack distribution control reinforcement there is a porous layer (26) of sprayed concrete. [3" id="US-20010002969-A1-CLM-00003] 3. An installation as claimed in claim 2 , characterised in that drainage pipes (23) are enclosed in the layer (26) of sprayed concrete. [4" id="US-20010002969-A1-CLM-00004] 4. An installation as claimed in claim 1 , 2 or 3, characterised in that the crack distribution control reinforcement (28) is in the form of a welded mesh reinforcement. [5" id="US-20010002969-A1-CLM-00005] 5. An installation as claimed in any of the preceding claims, characterised in that at least the parts of the concrete layer (27) which are arranged closest to the impermeable lining layer (14) and contain the crack distribution control reinforcement (28) are made of self-compacting concrete.
类似技术:
公开号 | 公开日 | 专利标题 US6368018B2|2002-04-09|Installation for storing of natural gas CN103162085B|2015-03-04|Self-supporting type LNG | storage tank KR20070048174A|2007-05-08|Tank for storing of fluid, preferably for fluids at low temperatures GB2186657A|1987-08-19|Underwater cryogenic pipeline system US2959318A|1960-11-08|Containers for liquefied gases WO2006046872A1|2006-05-04|Tank for storage of lng or other cryogenic fluids US6514009B2|2003-02-04|Subterranean storage vessel system US5803304A|1998-09-08|Underground storage tank IE822730L|1983-05-17|Hollow structures and method for their production WO2002048602A1|2002-06-20|Liquefied hydrocarbon gas storage tank with unlined concrete walls US5449020A|1995-09-12|Elongated enclosure of large cross-section, and process for its manufacture US4717285A|1988-01-05|Cistern for liquid or gas, constructed of reinforced concrete US10513082B2|2019-12-24|Monolithically poured concrete CNG tank with internal support columns DK161826B|1991-08-19|System for the storage of gas or liquid in a cavern in a mountain JP3051895B2|2000-06-12|Rock tank for high pressure gas storage FI108288B|2001-12-31|Method for initiating operation of an underground storage cavity for low-boiling hydrocarbons and an installation for the storage of low-boiling hydrocarbons US5468089A|1995-11-21|Buried storage tank with a single fluid-tight vessel for the confinement of a liquefied gas for example and arrangement of such storage tanks Vaughan1956|Steel linings for pressure shafts in solid rock AU2007355846A1|2009-01-08|Reinforced construction element RU2273697C2|2006-04-10|Three-dimensional foundation platform connected to tank to form closed system to be built on weak, permafrost, heaving soil and in seismic zones | FI106873B|2001-04-30|Process for sealing an extraction apparatus JP2740842B2|1998-04-15|Method of storing high pressure gas in rock and rock tank for storing high pressure gas CA1296907C|1992-03-10|System for storing liquid or gas in a rock chamber CN212268413U|2021-01-01|Hot angle protection structure of low-temperature full-capacity storage tank KR20210130574A|2021-11-01|Manufacturing method of large concrete manhole with an internal flow rate of 50tons or more
同族专利:
公开号 | 公开日 EP1144284B1|2003-01-22| SE9801994D0|1998-06-05| AU4668999A|1999-12-20| JP3670213B2|2005-07-13| CA2334025A1|1999-12-09| WO1999062794A1|1999-12-09| DE69905081D1|2003-02-27| NO20006037D0|2000-11-29| AT231467T|2003-02-15| EP1144284A1|2001-10-17| NO20006037L|2001-01-31| DE69905081T2|2003-06-05| JP2002516798A|2002-06-11| CA2334025C|2008-03-11| NO324238B1|2007-09-10| US6368018B2|2002-04-09|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题 EP1304523A2|2001-10-18|2003-04-23|MI.PI S.r.l.|Device for treating installations of underground tanks and piping| US20030129029A1|2000-06-12|2003-07-10|Sachio Shimizu|Tunnel waterproofing method| US20080112760A1|2006-09-01|2008-05-15|Curlett Harry B|Method of storage of sequestered greenhouse gasses in deep underground reservoirs| CN102121369A|2010-12-15|2011-07-13|中国神华能源股份有限公司|Method for separating gas| CN102829320A|2012-09-10|2012-12-19|盛泽能源技术有限公司|Intelligent sensing large compressed natural gas bomb type antiexplosion pressure-relief underground gas storage well| CN103952201A|2014-04-21|2014-07-30|河南理工大学|Low-concentration gas flow powerless purification emission reduction| DE102014104978A1|2014-04-08|2015-10-08|Herrenknecht Aktiengesellschaft|Device for storing gas under pressure| RU2649510C2|2016-07-25|2018-04-03|Николай Геннадьевич Кириллов|Complex of long-term storage and use of cryogenic fuel components| AU2017408795B2|2017-10-25|2019-07-25|China University Of Mining And Technology|Method of utilizing downhole roadway in coal mine for compressed air energy storage| CN111520186A|2020-04-23|2020-08-11|中国水利水电第五工程局有限公司|Tunnel bottom plate thin-wall lining water burst treatment method|GB493893A|1937-02-12|1938-10-17|Travaux D Impermeabilisation P|Improved construction of reservoirs for the storage of hydrocarbons| US3151416A|1961-05-15|1964-10-06|Inst Gas Technology|Method of constructing a liquefied gas container| FR2044634A1|1969-05-05|1971-02-26|Lebon Et Cie|| SE410960B|1978-04-26|1979-11-19|Svenska Vaeg Ab|SYSTEM FOR STORAGE OF VETSKOR AT LAYER TEMPERATURE| DE3463805D1|1984-02-23|1987-06-25|Rodoverken Handel|Method of erecting large cylindrical storage tanks with a plurality of vertical plate bodies arranged inside one another| FI69503C|1984-03-13|1986-02-10|Neste Oy|YTBELAGD BERGSBEHAOLLARE ELLER TUNNEL| WO1986001559A1|1984-09-05|1986-03-13|Neste Oy|Cistern for liquid or gas, constructed of reinforced concrete| SE458443B|1985-07-03|1989-04-03|Torbjoern Hahn|SYSTEM FOR STORAGE OF LIQUID OR GAS IN A SPACE IN MOUNTAIN| SE8703765L|1987-09-30|1989-03-31|Sven Aake Calminder|PLANT FOR PRESSURE STORAGE OF NATURAL GASES| IT8812413D0|1988-01-29|1988-01-29|Ferrari Nino Impresa Costruzio|LARGE UNDERGROUND TANK HAVING STRUCTURAL STABILITY CREATED BY THE INTERACTION OF THE METAL BAND OF THE STATIC CONCRETE AND OF THE FILLING MATERIAL BETWEEN THEM INTERPOSED| GB2215023B|1988-02-18|1992-02-05|Neste Oy|Storage system| SE462927B|1989-01-20|1990-09-17|Avesta Lining Ab|KITCHEN IN THE MANUFACTURE OF A SYSTEM FOR STORAGE OF LIQUID OR GAS AND ALSO KITCHEN MANUFACTURED STORAGE SYSTEM| DE3913253A1|1989-04-22|1990-10-25|Holzmann Philipp Ag|CONTAINER FOR THE STORAGE OF FROZEN LIQUIDS| DK0712793T3|1994-11-17|1998-12-28|Ferrari Nino Costr|Underground tank for storage of liquids at ambient temperature and of gases densified to liquids at low temperature| ES2203667T3|1996-10-27|2004-04-16|Sika Schweiz Ag|DISPERSANT AGENT FOR HIGH FLUIDITY OR SELF-COMPACTING CONCRETE.|JP4687934B2|2000-10-31|2011-05-25|清水建設株式会社|High pressure gas storage facility| JP2008230849A|2006-12-06|2008-10-02|Shimizu Corp|Low-temperature rock reservoir and its construction method| JP5158622B2|2007-04-11|2013-03-06|清水建設株式会社|Low temperature rock storage tank| CN102102536B|2010-12-15|2013-02-13|中国神华能源股份有限公司|Method for storing gas by using abandoned tunnel| KR101321929B1|2011-11-02|2013-10-28|한국지질자원연구원|High-pressure reservoir having a lining improved in airtightness and stability for compressed air energy storage system| EP2832666A1|2013-08-02|2015-02-04|Park-ID B.V.|Installation for storing compressed air|
法律状态:
2001-02-26| AS| Assignment|Owner name: SYDKRAFT AB, SWEDEN Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:JOHANSSON, JAN HUGO;REEL/FRAME:011550/0034 Effective date: 20010118 | 2002-03-21| STCF| Information on status: patent grant|Free format text: PATENTED CASE | 2002-06-18| AS| Assignment|Owner name: GAZ DE FRANCE, FRANCE Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SYDKRAFT AB;REEL/FRAME:013000/0969 Effective date: 20020302 | 2005-09-29| FPAY| Fee payment|Year of fee payment: 4 | 2007-06-20| AS| Assignment|Owner name: E.ON SVERIGE AKTIEBOLAG, SWEDEN Free format text: CHANGE OF NAME;ASSIGNOR:SYDKRAFT AB;REEL/FRAME:019448/0398 Effective date: 20050914 | 2009-09-29| FPAY| Fee payment|Year of fee payment: 8 | 2012-11-12| AS| Assignment|Owner name: GDF SUEZ, FRANCE Free format text: CHANGE OF NAME;ASSIGNOR:GAZ DE FRANCE;REEL/FRAME:029277/0438 Effective date: 20080716 Owner name: GDF SUEZ, FRANCE Free format text: CHANGE OF ADDRESS;ASSIGNOR:GDF SUEZ;REEL/FRAME:029277/0445 Effective date: 20090115 Owner name: GAZ DE FRANCE SOCIETE ANONYME, FRANCE Free format text: CHANGE OF CORPORATE FORM;ASSIGNOR:GAZ DE FRANCE SERVICE NATIONAL;REEL/FRAME:029277/0406 Effective date: 20041117 | 2013-09-24| FPAY| Fee payment|Year of fee payment: 12 |
优先权:
[返回顶部]
申请号 | 申请日 | 专利标题 SE9801994A|SE9801994D0|1998-06-05|1998-06-05|Natural gas storage facility| SE9801994-6||1998-06-05|| SE9801994||1998-06-05|| PCT/SE1999/000981|WO1999062794A1|1998-06-05|1999-06-07|Installation for storing of natural gas| 相关专利
Sulfonates, polymers, resist compositions and patterning process
Washing machine
Washing machine
Device for fixture finishing and tension adjusting of membrane
Structure for Equipping Band in a Plane Cathode Ray Tube
Process for preparation of 7 alpha-carboxyl 9, 11-epoxy steroids and intermediates useful therein an
国家/地区
|