专利摘要:

公开号:SU1659602A1
申请号:SU867774302
申请日:1986-10-04
公开日:1991-06-30
发明作者:Юрген ЛАНГ;Гунтер Шерц;Клаус ФИБАК;Юрген Мекель
申请人:Академия Строительства (Инопредприятие);
IPC主号:
专利说明:

one
(89) DD 252739
(21) 7774302/33 (22) 10/04/86
(31) WP F 28 D / 282229
(32) 10/30/85
(33) DD
(46) 06.30.91. Bul №24
(71) Construction Academies (DD)
(72) Lang Jürgen, Scherz Gunter, Fibak Klaus and Mekel Jürgen (DD) (53) 696.144.2 (088.8)
(54) SHOWER INSTALLATION (57) The invention relates to a shower installation for efficient utilization of heat contained in used shower water, mainly in sports centers and cultural centers, in the medical sector, and also in sanitary facilities of military enterprises. The invention is applicable as
one
in the construction of new facilities, and in the reconstruction of existing ones. The purpose of the invention is to increase the reliability of operation and to ensure the possibility of monitoring its tightness. An additional valve 6 is installed in the pipe 11 for supplying cold water to the heat exchanger 2 in such a way that small loads caused by static pressure and gravity. On the supply line 19 of the mixed water between the additional valve 6 and the shower screen 4, where no other control valves are provided, a signaling device 17 with an optical indicator of water leakage is placed to determine the softening in the heat exchanger 2, 2 Cpf.
WITH
and
L /
nineteen
about
SP
yoo oh k
burned
///// // ft /
The invention relates to a shower installation for disposing of a jelly, designed mainly for shower rooms in cultural and sports centers, in the medical sector and in military enterprises. The installation is applicable both in the construction of new buildings, hooks and in the reconstruction of existing showers with minimal costs.
A well-known shower installation includes a combined bath, a heat exchanger installed therein with inlet and outlet nozzles, the first of which is connected to the cold water supply pipeline, and the second to the heated water removal pipeline connected to the last hot water supply pipeline with a valve installed on it and a mixed feed pipeline with a shower screen placed on it. (See US Patent No. 4291423, A 47 1C 3/22 (4-598), 1981).
However, the known solution has a disadvantage: the heat exchanger is subjected to the pressure of the water supply network lying in the range of 0.8-1.0 MPa. This means that the heat exchanger must be manufactured in accordance with the conditions of work, which leads to complex structural forms while saving material or to relatively simple forms at high material costs. Further, there is no satisfactory possible leakage in a heat exchanger, which can be caused, for example, by ionization processes. This is particularly true for damage from the side of the pool or the less accessible elements of the heat exchanger.
The purpose of the invention is to increase the reliability of work and ensure the possibility of controlling its tightness.
FIG. 1 schematically shows the shower installation; in fig. 2 - housing with valves and an alarm device located in it; FIG. 3 is a section A-A in FIG. 2; in fig. 4 shows a section of B — b in FIG. 3; FIG. - section A-A in FIG. 2 (embodiment of the signal device).
The shower installation (contains the combined bath 1, the heat exchanger 2 located in this bath, the additional valve b, the valve 5, the signaling device 17 with the optical indicator of water leakage, the shower net 4. The additional valve 6 is mounted in front of the heat exchanger 2 on the pipe 11 of the cold water The pipeline 12 for withdrawing the under-heated water is connected to the pipeline 13 for supplying hot water and to pipe 19 for withdrawing mixed water, n &
where the shower mesh 4 is located. The water flowing out of the shower mesh, after use, enters the heat transfer surfaces of the heat exchanger 2 and is discharged from the collecting tank 1 to the sewer network.
The additional valve 6 in the closed state protects the heat exchanger 2 from the effect of the mains pressure from the cold water side and makes it possible to exclude other control valves in the pipes from the heat exchanger 2 to the shower mesh 4. Thus, in any state of the shower installation, the heat exchanger 2 is subjected to
5 with relatively low pressures, which allows optimal design of the heat exchanger 2 from the point of view of material utilization. So for example when using corrugated hoses from
Copper as a heat transfer element saves material over 50%.
In order to determine the softening, heat exchanger 2 is provided with a signal
5, the device 17, which, together with the valves 5 and 6, is housed in the housing 3. The first embodiment of the signaling device with an optical indicator of water leakage comprises a transparent locking lid 7 fixed on the ledge 10 of the housing 3. Between these elements are stretched thin-walled membranes 8 and 9, for example, from a rubber fabric with a thickness of 0.1-0.2 mm of various colors, the membrane 9 being made 5 with slots 18. The water in the pipe 19 after closing the shower installation deforms the membranes 8 and 9 under the force of gravity to spherical shape The inner surface of the closure cap 7, in which the slots 18 are opened in the membrane 9 and the membrane 8 lying behind it becomes visible. This state continues until the decomposition in the heat exchanger 2 is determined.
5 or pipelines connected to it.
Another embodiment of the signal device comprises a gasket 14 of a porous material, preferably plastic or non-ferrous metal, which
In conjunction with sealing washers 16 tension between the protrusion 10 and the transparent locking lid 7, between the inside surfaces of the locking lid 7 and the gasket 14 of porous material, granular silica 15 is placed, which has the ability to change its color when in contact with water or air. Lowering the water level below the signal level of the signal device 17, for example, in in-decompressions with long interruptions in use
shower device, leads to a change in the color of silica 15.
权利要求:
Claims (3)
[1]
The timely detection of invisible loosenings and their timely elimination is very important, since the penetration of microscopic particles of dirt that are in the used water and on the walls of the heat exchanger into clean water leads to unhygienic conditions for using a shower installation. Claims 1. A shower installation comprising an assembly bath, a heat exchanger installed therein with inlet and outlet manifolds, the first of which is connected to the cold water supply pipeline, and the second to the heated water outlet pipe
U
R-fl
A hot water supply pipeline with a valve installed on it and a mixed water supply pipeline with a shower mesh expanded on it, characterized in that, in order to increase reliability of operation, it is equipped with an additional valve installed on the cold water supply pipeline to the heat exchanger.
[2]
2.Installation according to claim 1, in accordance with the fact that, in order to ensure the possibility of monitoring its tightness, it is equipped with a signaling device with an optical leak indicator located on the mixed water supply pipeline
water.
[3]
3. Installation on PP. 1 and 2, characterized in that the valves and signal
The device is placed in the same housing.
77
P
to
Tf
//
FIG. 2
Fig.CJ -ft
P j
Pg.5
类似技术:
公开号 | 公开日 | 专利标题
SU1659602A1|1991-06-30|Shower unit
PL200890B1|2009-02-27|Water filter
US20090014379A1|2009-01-15|Filtration faucet system
CN201368225Y|2009-12-23|Filtering and impurity removing valve for underfloor heating system
CN212804366U|2021-03-26|Wall-mounted water treatment faucet
CN205710173U|2016-11-23|A kind of double water passage water-purifying tap Combination filter element
KR200365870Y1|2004-10-22|Apparatus for preventing the water leakage in water purifier
CN108002626A|2018-05-08|A kind of high-efficiency water purifying treatment device
CN209885356U|2020-01-03|Water heating bathroom with water quality purification function
KR0158427B1|1998-12-01|Non-freezing valve
CN213146964U|2021-05-07|Natural gas water heater convenient to collect incrustation scale
CN212802121U|2021-03-26|Whole bathroom wall with novel drainage structures
CN210892182U|2020-06-30|Intelligent water heater with good safety
CN210786391U|2020-06-19|Geothermal heating filter device
CN208234652U|2018-12-14|A kind of water saving water purifier of convenient household
CN209310563U|2019-08-27|A kind of shower waste water residual heat recycling heat exchanger and its mounting structure
CN213569637U|2021-06-29|Receive and strain straight drinking water equipment of thing networking
CN2127135Y|1993-02-17|Moving jointing tap
RU21746U1|2002-02-20|PORTABLE WATER FILTER
CN206130117U|2017-04-26|Front end filtration of constant temperature shower
CN216092566U|2022-03-22|Hanging stove with filter cleaning function
CN206347180U|2017-07-21|A kind of plastic sense answers urinal valve
CN205635221U|2016-10-12|Water purification treatment device
CN207846588U|2018-09-11|A kind of public restroom scale removal deodorization system
CN207827964U|2018-09-07|A kind of UASB water-distributing devices
同族专利:
公开号 | 公开日
DD252739A3|1987-12-30|
CS269787B1|1990-05-14|
DE3633321A1|1987-05-07|
CS750786A1|1989-06-13|
BG50683A1|1992-10-15|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题

NZ535969A|2004-10-15|2006-07-28|Garth Kennedy Mcgregor|Wastewater heat recovery|
CN100390464C|2005-04-30|2008-05-28|陈非|Energy saving bath room capable of self heating water|
ES2284359B1|2005-11-11|2008-07-01|Francisco De Vicente Jimenez|DEVICE FOR THE RECOVERY OF THE RESIDUAL ENERGY OF SANITARY WATER DISPOSALS.|
CH709194A2|2014-01-17|2015-07-31|Joulia Ag|Heat exchanger for a shower or bath.|
CN104315883A|2014-09-25|2015-01-28|无锡昊瑜节能环保设备有限公司|Temperature-controlled heat exchange device|
CN107387808A|2016-05-17|2017-11-24|赵海慧|It is a kind of can external water treatment facilities water mixing valve|
NL2023849B1|2019-09-18|2021-05-25|Sanura Vof|System for heat recovery from shower drain water|
CN110864163A|2019-12-04|2020-03-06|徐州赛特机械制造有限公司|Cold and hot water pipe installation accessory|
法律状态:
优先权:
申请号 | 申请日 | 专利标题
DD85282229A|DD252739A3|1985-10-30|1985-10-30|SHOWER UNIT FOR WASTEWATERWORK USE|
[返回顶部]