专利摘要:
The invention relates to metallurgy, in particular, to methods for producing liquid iron or steel semi-products in a smelter gasifier. The purpose of the invention is to eliminate the re-oxidation of molten materials and reduce energy consumption. For this, in the melter gasifier 1, by adding coal and injecting oxygen-containing gas by means of the tuyere sleeves 2, a fixed bed of coke particles is blown by oxygen-containing gas, and a fluidized (boiling) layer of coke particles is formed into it and the iron-containing material is introduced into this fluidized bed. Below the fixed bed blown with oxygen-containing gas, there is a non-blown fixed bed. From the particles of coke create a fluidized bed, which is purged with a gas not containing oxygen or containing it in a small amount. 1 hp f-ly, 1 ill.
公开号:SU1473716A3
申请号:SU864027155
申请日:1986-03-20
公开日:1989-04-15
发明作者:Хаук Рольф;Кепплингер Вернер
申请人:Фоест-Альпине Аг (Фирма);Корф-Инжинеринг Гмбх (Фирма);
IPC主号:
专利说明:

The upper section is provided along the extreme 25 of the moving bed II; at least one pipeline 5 is installed for
temperature above 2000 ° C; at the boundaries between fixed bed II and pseudo liquefied layer III, temperature ha
temperature above 2000 ° C, at the interface between fixed bed II and fluidized bed III, the gas temperature
35
40
And the resulting reducing gas “Pa” in the middle section consists of coarse coke particles immobile 11800 ° C or iron-containing temperature I and II (stationary layers) “containing particles 1200-1300 ° С, and in the re-forming melt below them p-liquid metal 6 and slag 7, while for both components it is possible to provide for the outlet. The fixed bed I does not contain a supply line, and therefore no gas is introduced into this layer. A fixed layer II is formed above the fixed layer I into which the coke particles Z are introduced by oxygen-containing gas coming from the supply pipes 2, due to which these particles are converted to carbon monoxide. Above the unsupported layer II forms a fluidized fluid layer IJI. It is supported by the reducing gas formed in the immobile layer II. Small-sized coal or coke particles remain in the zone of fluidized bed III. The particles of coal and coke, for which the gas velocity is by you, there are no conditions for the oxidation current and the pipe is insufficient, only the deposits, the reaction takes place between the hardening and collapse through the fluidized bed III and forms a fixed bed II or fixed layer I.S5 gift of which the sponge-like fixed layer II used to create heat can have a lower content necessary for conducting the process, transfer the zone of the fixed layer II - the zone of the fixed layer I - counter-current iron scrapers 1600 ° C, slag melt or molten metal lme “t temperature 1400-1500 ° C, and in the extended upper section of the melting gasifier at the upper boundary of the fluidized bed III temperature is 1500 ° Cj in the above so-called calming zone gas temperature is 1 00 ° C. The reducing gas is discharged through the discharge pipelines 5 in the amount of 1330 me (in normal conditions) per 1 ton of pig iron, while the content of the components is as follows: C 3.5, Si 0.3, S 0.1.
In the zones of fixed layers I and II, in which, with the exception of the zone directly in front of the tuyere stockings, carbon, silicon and manganese. It is also possible to increase the carbon content in the iron melt, the benefit of carbon. A lower carbon content in the sponge gland from moving bed II is set
temperature above 2000 ° C, at the interface between fixed bed II and fluidized bed III, the gas temperature
1800 ° C or the temperature of the iron-containing particles is 1200-1300 ° C, and on the piles, there are no conditions for oxidation, a reaction occurs between the solid and the sponge used.
11800 ° С or the temperature of iron-containing particles is 1200-1300 ° С, and on ponoks, there are no conditions for oxidation, there is a reaction between the fixed-sponge zone and the fixed bed zone II - the fixed-bed zone I temperature iron carriers 1600 ° C; Slag melt or molten metal lme "t temperature 1400-1500 ° C; and in the extended upper section of the melting gasifier at the upper boundary of the fluidized bed III, the temperature is 1500 ° Cj in the so-called calming zone above the gas temperature made up em 1 00 ° C. The reducing gas is discharged through the discharge pipelines 5 in the amount of 1330 Me (per normal conditions) per 1 ton of pig iron, while the content of the components is as follows: C 3.5, Si 0.3, S 0 ,one.
In the zones of the fixed layers I and II, in which, with the exception of the zone directly in front of the tuyere arms, at 800 ° C or iron-containing particles at 1200–1300 ° C, and during interiors, there are no conditions for oxidation, what is used is sponge carbon, silicon and manganese. It is also possible to increase the carbon content in the iron melt, which can have a lower content.
carbon carbon. The lower carbon content in the sponge gland is reduced with a lower gas consumption in the shaft furnace.
The costs associated with installation and equipment are reduced. It eliminates the need for a tuyere stock photography.
权利要求:
Claims (1)
[1]
1. A method of producing liquid iron or steel semi-products, which includes pointing the molten gasifier and the metal of a fixed bed of a large fraction in a melter gasifier
coal and coke, the supply of oxygen-containing gas into the fixed bed through the gasifier's gasifier, the formation of a fluidized bed over the fixed bed from the top loaded, restoring
materials and coal fines, the reduction and melting of materials, characterized in that, in order to eliminate the re-oxidation of molten materials in the smelting furnace and to reduce energy costs, oxygen-containing gas is fed into the middle part of the fixed layer so that they form the lower section that is not blown and the upper blown, and the reducing gas flowing from the upper portion creates a fluidized bed.
, 2 "The method according to claim 1, characterized in that the regulation of the size of the fixed trees in the gasifier is carried out by distributing the size of the supplied coal.
类似技术:
公开号 | 公开日 | 专利标题
US4566904A|1986-01-28|Process for the production of iron
KR0131266B1|1998-04-17|Process for the production of iron using converter
US4356035A|1982-10-26|Steelmaking process
AU658717B2|1995-04-27|A smelting reduction method with high productivity
SU1473716A3|1989-04-15|Method of producing cast iron melt or steel semiproducts
NL9500264A|1996-09-02|Method for producing liquid pig iron.
US4396421A|1983-08-02|Method of, and arrangement for, producing molten pig iron or steel pre-material
US3985544A|1976-10-12|Method for simultaneous combined production of electrical energy and crude iron
SU1743360A3|1992-06-23|Plant and method for continuous steel production
US6837916B2|2005-01-04|Smelting reduction method
SU603349A3|1978-04-15|Method of obtaining liquid pig iron
US6419724B1|2002-07-16|Method for reducing iron oxides and for melting iron and installations therefor
US4753677A|1988-06-28|Process and apparatus for producing steel from scrap
US5074530A|1991-12-24|Apparatus for smelting reduction of iron ore
JP5039945B2|2012-10-03|Method and apparatus for producing pig iron or fluid primary iron from charges containing iron ore
US3734716A|1973-05-22|Steelmaking process
US5989307A|1999-11-23|Method and apparatus for producing pig iron by smelting reduction and method of obtaining such a plant
US3514280A|1970-05-26|Continuous steelmaking method
RU99100319A|2001-03-20|MELTING AND GASIFICATION APPARATUS FOR PREPARING METAL MELT AND INSTALLATION FOR PREPARING METAL MELTS
JP2612162B2|1997-05-21|Blast furnace operation method
US1991008A|1935-02-12|Method and apparatus for producing low carbon metal
US693062A|1902-02-11|Manufacture of pig-iron.
JP2622517B2|1997-06-18|Blast furnace operation method
US1259467A|1918-03-12|Smelting copper and like ores.
RU2086657C1|1997-08-10|Apparatus for reducing metal oxides by carbon and melting metals in blast furnace
同族专利:
公开号 | 公开日
DD247025A5|1987-06-24|
ATA84685A|1986-07-15|
KR860007386A|1986-10-10|
AU574906B2|1988-07-14|
US4708736A|1987-11-24|
EP0195770B1|1988-12-14|
BR8601242A|1986-12-02|
AU5466486A|1986-09-25|
KR930007308B1|1993-08-05|
JPS648044B2|1989-02-13|
JPS61221315A|1986-10-01|
ZA861922B|1986-11-26|
DE3661424D1|1989-01-19|
CS196586A2|1988-09-16|
EP0195770A1|1986-09-24|
CN86101817A|1986-11-05|
CA1268633A|1990-05-08|
IN166414B|1990-05-05|
CN86101817B|1988-07-06|
AT382390B|1987-02-25|
CS264273B2|1989-06-13|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
US8313552B2|2007-11-13|2012-11-20|Siemens Vai Metals Technologies Gmbh|Method for the production and the melting of liquid pig iron or of liquid steel intermediate products in a melt-down gasifier|US3948645A|1973-04-30|1976-04-06|Boliden Aktiebolag|Method of carrying out heat-requiring chemical and/or physical processes in a fluidized bed|
SE457265B|1981-06-10|1988-12-12|Sumitomo Metal Ind|PROCEDURE AND ESTABLISHMENT FOR PREPARATION OF THANKS|
AT378970B|1982-12-21|1985-10-25|Voest Alpine Ag|METHOD AND DEVICE FOR THE PRODUCTION OF LIQUID PIPE IRON OR STEEL PRE-PRODUCTS|
AT376241B|1983-01-03|1984-10-25|Voest Alpine Ag|METHOD FOR MELTING AT LEAST PARTLY REDUCED IRON ORE|
DD226157A3|1983-06-01|1985-08-14|Bandstahlkombinat Matern Veb|METHOD FOR PRODUCING LIQUID RAW STEEL AND REDUCTION GAS IN A SEPARATOR REFRIGERATOR|
DE3438487C2|1984-10-17|1987-10-15|Korf Engineering Gmbh, 4000 Duesseldorf, De|
SU1479006A3|1984-11-26|1989-05-07|Фоест-Альпине |Method of producing molten iron or steel products and reducing gas in melting gasifier|
DE3504346C2|1985-02-06|1986-11-27|Korf Engineering GmbH, 4000 Düsseldorf|Method and device for the production of sponge iron particles and liquid pig iron|AT386007B|1986-10-30|1988-06-27|Voest Alpine Ag|METHOD AND SYSTEM FOR THE EXTRACTION OF METALS OR. METAL ALLOYS|
AT386006B|1986-10-30|1988-06-27|Voest Alpine Ag|METHOD AND SYSTEM FOR THE EXTRACTION OF METALS OR. METAL ALLOYS|
DE3787017T2|1987-06-30|1993-11-25|Kawasaki Steel Co|Method and device for producing liquid metal from ore particles.|
BE1006828A3|1991-07-12|1995-01-03|Elsen Tooling Ireland Ltd|Method for the preparation of metals, particularly iron, from oxidised ores,at any reduction temperature in a drop reduction furnace|
US5320676A|1992-10-06|1994-06-14|Bechtel Group, Inc.|Low slag iron making process with injecting coolant|
US6197088B1|1992-10-06|2001-03-06|Bechtel Group, Inc.|Producing liquid iron having a low sulfur content|
US5397376A|1992-10-06|1995-03-14|Bechtel Group, Inc.|Method of providing fuel for an iron making process|
US5354356A|1992-10-06|1994-10-11|Bechtel Group Inc.|Method of providing fuel for an iron making process|
US5958107A|1993-12-15|1999-09-28|Bechtel Croup, Inc.|Shift conversion for the preparation of reducing gas|
MY117002A|1996-11-08|2004-04-30|Voest Alpine Ind Anlagen|Method of producing molten pig iron or steel pre-products from ore.|
AT503593B1|2006-04-28|2008-03-15|Siemens Vai Metals Tech Gmbh|METHOD FOR THE PRODUCTION OF LIQUID RAW STEEL OR LIQUID STEEL PREPARED PRODUCTS MADE OF FINE-PARTICULAR OXYGEN-CONTAINING MATERIAL|
法律状态:
优先权:
申请号 | 申请日 | 专利标题
AT0084685A|AT382390B|1985-03-21|1985-03-21|METHOD FOR THE PRODUCTION OF LIQUID PIPE IRON OR STEEL PRE-PRODUCTS|
[返回顶部]