专利摘要:
ABSTRACTA method of operating a vehicle With hybrid-electric powertrain having an internal com- bustion engine, a generator, and a battery is provided. A vehicle start input signal is received from an operator interface. A master controller initiates after receiving input from the operator interface. A secondary controller initiates after starting the initiation of the master controller. A high-voltagebattery pack cell voltage balancing test is performed utilizing the master controller. Voltage Withinthe high-voltage battery pack cells is balanced based upon results of the balancing test. A high-voltage isolation contactor closes after balancing the voltage Within the high-voltage battery pack.A signal from the master controller to the secondary controller to begin operation is generatedafter closing the high-voltage isolation contactor. Altemately, voltage Within the high-voltage bat-tery pack cells based upon the results of the balancing test may take place dynamically during ve- hicle operation after closure of the high-voltage isolation contactor. Page 17 of17
公开号:SE538214C2
申请号:SE1450002
申请日:2011-06-17
公开日:2016-04-05
发明作者:Jay E Bissontz
申请人:Int Truck Intellectual Prop Co;
IPC主号:
专利说明:

[1] [0001] The present disclosure relates to a control system for a hybrid-electric powertrain, and more particularly to a control system for a hybrid-electric powertrain that controls initiation, bat- tery testing, and de-initiation of the hybrid-electric powertrain.
[2] [0002] Many vehicles now utilize hybrid-electric powertrains in order to increase the efficien-cy of the vehicle. Hybrid-electric powertrains typically improve overall vehicle fiael efficiency byallowing supplementing an internal combustion engine with electric motors, such that less poweroutput is required of the internal combustion engine, as power from the electric motors may alsobe utilized in situations when maximum powertrain output is required, such as acceleration, orclimbing a grade. Additionally, hybrid-electric powertrains may be utilized to power equipmentmounted to a vehicle, such as, for example, a lift, an auger, a post hole digger, a crane, or otherknown equipment that may be utilized when a vehicle is not in motion. Such power equipmentmay be powered through a power take off (“PTO”) that may be driven by electric motors of thehybrid-electric powertrain to reduce the time an intemal combustion engine is operated.
[3] [0003] The initiation and de-initiation, or startup and shutdown, of the electrical systems in avehicle having a hybrid-electric powertrain presents issues not experienced previously. For in-stance, during initiation of electrical systems, simply transitioning high-voltage isolation contac-tors from an open state, which prevents the flow of electricity, to a closed state, which allows theflow of electricity, upon activation of a vehicle”s key, may cause a rapid uncontrolled free flow ofelectrical energy that may damage system components. For example, design limits of system com-ponents may be exceeded by rapid loading of electrical energy, thereby damaging the systemcomponents. Similarly, when electrical systems are de-initiated, premature component failure orexcessive battery discharge may occur if the flow of electrical energy is suddenly stopped.
[4] [0004] Further, in addition to initiation and de-initiation of the electrical systems, voltage ofindividual cells in batteries of the hybrid-electric powertrain needs to be balanced to allow the electrical system to fianction as intended and to allow the battery packs to offer Page 1 of17 performance and life cycle that is acceptable. If voltage of the individual battery cells is not keptWithin a certain range, battery pack life may be adversely affected, and electrical systems may nothave suff1cient voltage if one of the individual cells in a battery pack is not as charged as the rest ofthe cells. Previous efforts to provide battery management systems focused on either balancing voltageWithin the battery cells after the vehicle had been shut offl Which can drain the battery packs to a levelto prevent the vehicle from starting, or the battery management system is active during operation ofthe hybrid-electric poWertrain, Which makes it increasingly difficult to balance the battery packs aselectric loads are constantly varying the voltage Within the battery packs.
[5] [0005] Therefore, a need exists for a control system that controls the initiation, de-initiation, and battery management system for an electrical system of a vehicle having a hybrid-electric poWertrain.
[6] [0006] According to one process, a method of operating a vehicle With hybrid-electric poWertrainhaving an intemal combustion engine, a generator, and a battery is provided. A vehicle start inputsignal is received from an operator interface. A master controller initiates after receiving the inputfrom the operator interface. At least one secondary controller initiates after starting the initiation ofthe master controller. A high-voltage battery pack cell voltage balancing test is performed utilizingthe master controller. Voltage Within the high-voltage battery pack cells is balanced based upon re-sults of the high-voltage battery pack cell voltage balancing test. A high-voltage isolation contactorcloses after balancing the voltage Within the high-voltage battery pack. A signal from the master con-troller to the at least one secondary controller to begin operation is generated after closing the high-voltage isolation contactor. The balancing of the high voltage batteries also occurs dynamically dur-ing normal vehicle operation. The high voltage battery cell voltage “test” occurs before the pre-charge contactors and main isolation contactors close. The “test” is a momentary look/glimpse by theBMS at the high voltage battery cells to determine their state of charge (SOC), Which becomes a fixedpoint of reference in order to later direct more or less electrical potential to a given cell during dy-namic vehicle operation.
[7] [0007] According to another process, a method of operating a vehicle With hybrid-electric power-train having an internal combustion engine, a generator, and a battery, is provided. A shutdoWn signalinput is provided from an operator interface. A master controller deterrnines a current amount of elec- trical activity of the hybrid-electric poWertrain. Electrical Page 2 of17 activity of the hybrid-electric powertrain is reduced by transmitting a control signal from the mastercontroller to at least one secondary controller. A high-voltage isolation contactor opens once the elec-trical activity of the hybrid-electric powertrain reaches a predetermined threshold. A high-voltagebattery pack cell voltage balancing test is performed utilizing the master controller. Voltage withinthe high-voltage battery pack is balanced based upon results of the high-voltage battery pack cellvoltage balancing test. The at least one secondary controller is placed into a sleep mode. The mastercontroller is placed into a sleep mode after the at least one secondary controller enters into the sleepmode. The hybrid-electric powertrain shuts down once the master controller enters into the sleepmode.
[8] [0008] According to a further process, a method of balancing voltage within cells of a high-voltage battery pack of a vehicle having hybrid-electric powertrain is provided. It is determined if ahigh-voltage electrical system discharge rate is between a first limit and a second limit. It is deter-mined if a low-voltage electrical system discharge rate is between a third limit and a fourth limit. Ahigh-voltage isolation contactor transitions from a first state to a second state. An amount of voltageis determined in a plurality of cells of a high-voltage battery back. An amount of voltage in the plural-ity of cells of the high-voltage battery pack is balanced.
[9] [0009] As described above, the Supervisory Control System for Hybrid-Electric Powertrains anda vehicle made with this system provide a number of advantages, some of which have been describedabove and others of which are inherent in the invention. Also, modifications may be proposed to theSupervisory Control System for Hybrid-Electric Powertrains or a vehicle made with this system without departing from the teachings herein.
[10] [0010] FIG. l is a schematic diagram showing a vehicle having a hybrid-electric powertrain.[0011] FIG. 2 is a flow chart showing the initialization process of an electrical system of a vehi-cle having a hybrid-electric powertrain.
[12] [0012] FIG. 3 is a flow chart showing the de-initiation process of an electrical system of a vehiclehaving a hybrid-electric powertrain.
[13] [0013] FIG. 4 is a graph showing current flow before a battery management system is utilized during initiation of an electrical system of a vehicle having a hybrid-electric powertrain.
[14] [0014] FIG. 5 is a flow chart showing current flow before a battery management system is utilized during de-initiation of an electrical system of a vehicle having a hybrid-electric powertrain.
[15] [0015] Referring now to the figures and in particular to FIG. 1, a schematic diagram of a vehiclehaving a hybrid-electric powertrain 10 is depicted. The hybrid-electric powertrain 10 comprises aninternal combustion engine 12 and a hybrid-electric system 14 that is coupled to the internal combus-tion engine 12. The hybrid-electric system 14 may comprise an electric motor and generator adaptedto function as a generator and generate electrical power when being driven by the internal combustionengine, and also is capable of functioning as an electric motor when being powered by first and sec-ond high-voltage battery packs 20, 22. A hybrid motor controller 16 is coupled to the hybrid-electricsystem 14 to control the function of the hybrid-electric system 14 as either a motor or a generator.[0016] The hybrid motor controller 16 is electrically coupled to a high-voltage distribution box18. The high-voltage distribution box 18 is adapted to control the distribution of electrical energy toand from the hybrid system 16, the f1rst high-voltage battery pack 20, the second high-voltage batterypack 22, and electrically powered components of the vehicle. The high-voltage distribution box 18comprises a first isolation contactor 24 and a second isolation contactor 26. The first isolation contac-tor 24 and the second isolation contactor 26 may be transitioned between an open position, preventingflow of electricity, and a closed position, allowing flow of electricity.
[17] [0017] The first high-voltage battery pack 20 includes at least one high-voltage battery cell 28and battery management system (“BMS”) circuit 30. The at least one high-voltage battery cell 28stores electrical energy utilized by the hybrid-electrical system 14. The BMS circuit 30 is utilized totest the state of the first battery pack 20 and to balance voltage within high-voltage battery cell 28 ofthe first high-voltage battery pack 20 and other high-voltage battery cells, both within the f1rst high-voltage battery pack 20, and in other high-voltage battery packs, such as the second high-voltage bat-tery pack 22.
[18] [0018] The second high-voltage battery pack 22 includes at least one high-voltage battery cell 32and a BMS circuit 34. The second high-voltage battery pack 22 is generally identical to the first high-voltage battery pack 20.
[19] [0019] The BMS circuits 30, 34 allow-voltage within the high-voltage battery cells 28, 32 to be measured when there is no load on the electrical system, such as when the first and Page 4 of17 second isolation contactors 24, 26 are in an open position. Once the voltage in the high-voltage bat-tery cells 28, 32 has been measured, the voltage within each cell 28, 32 may be equalized, as a batterypack 20, 22 may typically only output as much electrical power as that found in the least charged cellof the battery pack 20, 22.
[20] [0020] The high-voltage distribution box 18 additionally includes a pre-charge resistor circuit 36.The pre-charge resistor circuit 36 may be utilized to determine an amount of electrical current flow-ing through the high-voltage distribution box 18. The role of the pre-charge resistor circuit 36 is toreduce or prevent a free flow of electrical energy to all components of the vehicle”s electrical archi-tecture. Such rapid uncontrolled free flow of electrical energy places heavy, rapid loads on electricalcomponents at rates possibly exceeding their design limits, contributing to undue or premature failureof these components. A DC to DC converter 38 is also provided within the high-voltage distributionbox 18. The DC to DC converter 38 is adapted to convert the high-voltage output from the first bat-tery pack 20 and the second battery pack 22 to a lower voltage for use with low-voltage electricalsystem, such as those typically found to power electrical accessories in a vehicle. In addition to theDC to DC converter 38 found in the high-voltage distribution box 18, a second DC to DC converter40 may also be provided.
[21] [0021] An electronic system controller (“ESC”) 42 is also provided. The ESC 42 acts as a mastercontroller for the electrical system of the hybrid-electric powertrain 10. The ESC 42 is electricallycoupled to an operator interface 44, such as an ignition key. The operator interface 44 allows a user toindicate that the hybrid-electric powertrain 10 should initiate, or start-up, by placing the operator in-terface 44 into a start position. Similarly, the operator interface 44 also allows a user to indicate thatthe hybrid-electric powertrain should de-initiate, or shutdown, by placing the operator interface 44into an off position.
[22] [0022] The ESC 42 is electrically coupled via control networks 46, 48, 50 to a number of sec-ondary controllers, and electrical devices. For instance, a powertrain control network 48 may electri-cally couple the ESC 42 with an electronic control module (“ECM”), or electronic control unit(“ECU”), 52, a hybrid control unit (“HCU”) 54, and transmission control unit (“TCU”) 56, an anti-lock brake system control unit ( “ABS”) 58, and a regenerative braking system 60. The powertraincontrol network 48 may operate according to SAE standard J 1939.
[23] [0023] The ESC 42 is also coupled to a dash control panel 62 via a dash control network 46. Thedash control network 46 may operate according to SAE standard J 1708.
[24] [0024] Finally, the ESC 42 is coupled via hybrid control network 50. The hybrid control network50 may operate according to SAE standard J 1939. The hybrid control network 50 comprises a pneu-matic Compressor controller 64, a power steering controller 66, and an HVAC controller 68. Thepneumatic compressor controller 64, the power steering controller 66, and the HVAC controller 68are all also electrically coupled to the high-voltage distribution box 18, to receive power. The hybridcontrol network 50 also comprises a first remote power module (“RPM”) 70 and a second RPM 72.The f1rst RPM 70 and the second RPM 72 are adapted to control various equipment of a vehicle hav-ing a hybrid-electric powertrain, such as a lift, or a hydraulically driven component like an auger. Thehybrid control network 50 additional comprises the f1rst high-voltage battery pack 20 and the secondhigh-voltage battery pack 22. Thus, the hybrid control network 50 allows the ESC 42 to be electrical-ly connected to a number of controllable components of the hybrid-electric powertrain 10.
[25] [0025] Turning now to FIG. 2, a flow chart of the initialization process 100 of an electrical sys-tem of a vehicle having the hybrid-electric powertrain 10 is shown. The initialization process 100begins when a user places an operator interface into an operating position as shown at block 102. Theoperator interface generates a signal that is transmitted to an ESC, also referred to as a master control-ler at block 104 indicating that operator interface has been placed into an operating position. Themaster controller then initiates its operation at block 106. Once the master controller begins its initia-tion, at least one secondary controller, such as a pneumatic compressor controller, also begins to initi-ate, as shown at block 108.
[26] [0026] A high-voltage battery pack cell voltage balancing test is performed at block 110. Thehigh-voltage battery pack cell voltage balancing test includes the master controller broadcasting asignal to the secondary controllers to remain in a state of minimal power consumption, or no powerconsumption, until the high-voltage battery pack cell voltage balancing test is complete. The high-voltage battery pack cell voltage balancing test is conducted with the high-voltage isolation contactorin an open position, preventing the flow of electrical current from a high-voltage battery pack. Per-forrning the high-voltage battery pack cell voltage balancing test with the high-voltage isolation con-tactor in the open position provides a more stable voltage environment. The voltage within the cellsof the battery pack or packs is then balanced by either discharging cells with an excess voltage, or tocharge any cells with a voltage lower than the desired voltage, or a combination of the two may be utilized.
[27] [0027] Next, current from the high-voltage battery pack may be provided to a DC to DC convert-er for use with the vehicle”s low-voltage electrical system. The master controller further initiates ahigh-voltage pre-charge cycle, where the master controller monitors current flow in the both the high-voltage electrical system and the low-voltage electrical system. The current flow in the high-voltageelectrical system must be between an upper current limit and a lower current limit. Further, the cur-rent flow in the high-voltage electrical system must remain between the upper current limit and thelower current limit for a predeterrnined time. Similarly, the low-voltage electrical system must alsohave a current flow that is between an upper current limit and a lower current limit for a predeter-mined time. The upper and lower current limits and the predeterrnined time may vary based upon theapplication of the vehicle.
[28] [0028] Once the high-voltage battery pack cell voltage balancing test, and pre-charge cycle indi-cates that the high-voltage and low-voltage current flows are within the predef1ned current limits, ahigh-voltage isolation contactor may be transitioned from an open position to a closed position asseen in block 114. Finally, the master controller broadcasts a signal to the secondary controllers thatthey may begin operating as shown at block 116.
[29] [0029] Alternatively, once the high-voltage battery pack cell voltage balancing test performed atblock 110 is complete, the balancing step may be skipped, and the master controller may proceed toinitiate the pre-charge cycle of the high and low voltage systems. Once the high-voltage battery packcell voltage balancing test and pre-charge cycle indicates that the high-voltage and low-voltage cur-rent flows are within the predef1ned current limits, the high-voltage isolation contactor may be transi-tioned from an open position to a closed position as seen in block 114. Balancing of the voltage with-in the cells of the battery pack or packs is then balanced dynamically during operation of the vehicleby either discharging cells with an excess voltage or charging cells with def1cient voltage, or by acombination of both.
[30] [0030] FIG. 3 depicts a flowchart of the shutdown process 200 of an electrical system of a vehi-cle having the hybrid-electric powertrain 10. The shutdown process 200 begins when a user places anoperator interface, or user interface, into a shutdown position as shown at block 202. The operatorinterface generates a signal that is transmitted to an ESC, also referred to as a master controller atblock 204 indicating that the operator interface has been placed into a shutdown position. The mastercontroller then determines an amount of electrical activity in the hybrid-electric powertrain at block206. The master controller reduces the electrical activity within the hybrid-electric powertrain untilthe total level of electrical activity falls below a predetermined shutdown threshold, as shown at block208.
[31] [0031] A high-voltage battery pack cell voltage balancing test is performed at block 212. Thehigh-voltage battery pack cell voltage balancing test includes the master controller broadcasting asignal to the secondary controllers to remain in a state of minimal or no power consumption until thehigh-voltage battery pack cell voltage balancing test is complete. The high-voltage battery pack cellvoltage balancing test is conducted with the high-voltage isolation contactor in an open position, pre-venting the flow of electrical current from a high-voltage battery pack. Performing the high-voltagebattery pack cell voltage balancing test with the high-voltage isolation contactor in the open positionprovides a more stable voltage environment. The voltage within the cells of the battery pack or packsis then balanced at block 214 by either discharging cells with an excess voltage, or by charging anycells with a voltage lower than the desired voltage, or a combination of the two may be utilized. Al-tematively, the balancing of the high voltage batteries may occur dynamically during the next or sub-sequent vehicle operation cycle. In this scenario, the high-voltage battery pack cell voltage balancingtest functions as a momentary look by the BMS at the high voltage battery cells to determine theirstate of charge (SOC). This SOC becomes a fixed point of reference in order to direct more or lesselectrical potential to a given cell during dynamic vehicle operation the next time the vehicle is oper-ated. In other words, the BMS remembers the ending cell SOC for use during a subsequent re-initialization of the system.
[32] [0032] Finally, the master controller signals the secondary controllers to enter into a sleep modeat block 218. The sleep mode stops activity on the control network between the secondary controllersand the master controller. The master controller enters into a sleep mode at block 21, and the entirehybrid-electric powertrain is shutdown at block 220.
[33] [0033] FIG. 4 shows a current chart 300 indicating an amount of current flowing from a high-voltage electrical system 302 as well as an amount of current flowing from a low-voltage electricalsystem 304 prior to initiation of the ESC and any additional controllers. An upper current limit b1 isshown as is a lower current limit b2. As shown in FIG. 4, the upper current limit b1 and the lowercurrent limit b2 are shown as being identical for both the current flow from the high-voltage electricalsystem 302 and the current flow from the low-voltage electrical system 304, however, it is contem-plated that different limits may be utilized. A preset time frame 306 is also shown in FIG. 4. The pre-set time frame 306 provides assurance that the current flow from the high-voltage electrical system302 and the current flow from the low-voltage electrical system 304 remain within the upper currentlimit Page 8 of17 bl and the lower current limit b2 for a suff1cient period of time to indicate that the operation of thehybrid-electric powertrain has stabilized and it is unlikely that damage will be caused by a transitionof an isolation contactor to a closed position to allow current to flow from a high-voltage distributionbox.
[34] [0034] Similarly, FIG. 5 shows a current chart 400 indicating an amount of current flowing froma high-voltage electrical system 402 as well as an amount of current flowing from a low-voltage elec-trical system 404 prior to shutdown of the ESC and any additional controllers. An upper current limitb3 is shown as is a lower current limit b4. As shown in FIG. 5, the upper current limit b3 and thelower current limit b4 are shown as being identical for both the current flow from the high-voltageelectrical system 402 and the current flow from the low-voltage electrical system 404, however, it iscontemplated that different limits may be utilized. In one embodiment, the high voltage current andlow voltage current levels do not need to be identical, but both the high voltage current and low volt-age current levels need to be within the “deadband” range created between b3 and b4. A preset timeframe 406 is also shown in FIG. 5. The preset time frame 406 provides assurance that the current flowfrom the high-voltage electrical system 402 and the current flow from the low-voltage electrical sys-tem 404 remain within the upper current limit b3 and the lower current limit b4 for a suff1cient periodof time to indicate that the operation of the hybrid-electric powertrain has stabilized and it is unlikelythat damage will be caused by transitioning an isolation contactor to an open position to stop currentflow from a high-voltage distribution box.
[35] [0035] It will be understood that a control system may be implemented in hardware to effectuatethe method. The control system can be implemented with any or a combination of the following tech-nologies, which are each well known in the art: a discrete logic circuit(s) having logic gates for im-plementing logic fianctions upon data signals, an application specific integrated circuit (ASIC) havingappropriate combinational logic gates, a programmable gate array(s) (PGA), a field programmablegate array (FPGA), etc.
[36] [0036] When the control system is implemented in software, it should be noted that the controlsystem can be stored on any computer readable medium for use by or in connection with any comput-er related system or method. In the context of this document, a computer-readable medium can be anymedium that can store, communicate, propagate, or transport the program for use by or in connectionwith the instruction execution system, apparatus, or device. The computer readable medium can be,for example, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semi-conductor system, apparatus, device, or propagation medium. More specific examples (a non- exhaustive list) of Page 9 of17 the computer-readable medium Would include the following: an electrical connection (electronic)having one or more Wires, a portable computer diskette (magnetic), a random access memory (RAM)(electronic), a read-only memory (ROM) (electronic), an erasable programmable read-only memory(EPROM, EEPROM, or Flash memory) (electronic), an optical fiber (optical), and a portable compactdisc read-only memory (CDROM) (optical). The control system can be embodied in any computer-readable medium for use by or in connection With an instruction execution system, apparatus, or de-vice, such as a computer-based system, processor-containing system, or other system that can fetchthe instructions from the instruction execution system, apparatus, or device and execute the instruc-tions.
[37] [0037] While specific embodiments have been described in detail in the foregoing detailed de-scription and illustrated in the accompanying drawings, those With ordinary skill in the art Will appre-ciate that various permutations of the invention are possible Without departing from the teachingsdisclosed herein. Accordingly, the particular arrangements disclosed are meant to be illustrative onlyand not lirniting as to the scope of the invention, Which is to be given the full breadth of the appendedclairns and any and all equivalents thereof Other advantages to a Supervisory Control System forHybrid-Electric Powertrains and a vehicle made With this system may also be inherent in the inven- tion, Without having been described above.
Page 10 of 17
权利要求:
Claims (25)
[1] 1. A method of operating a vehicle With hybrid-electric powertrain having an internal combus-tion engine, a generator, and a battery, the method comprising: receiving a vehicle start input signal from an operator interface; initiating a master controller after receiving the input from the operator interface; initiatingat least one secondary controller after starting the initiation of the master controller; performing a high-voltage battery pack cell voltage balancing test utilizing the master con-troller; balancing voltage Within the high-voltage battery pack cells based upon results of the high-voltage battery pack cell voltage balancing test; closing a high-voltage isolation contactor after balancing the voltage Within the high-voltagebattery pack; and generating a signal from the master controller to the at least one secondary controller to begin operation after closing the high-voltage isolation contactor.
[2] 2. The method of clairn 1 further comprising: monitoring a current floW Within a high-voltage portion of the hybrid-electric poWertrain;and deterrnining if the current floW Within the high-voltage portion is Within a predef1ned range of current floWs before performing the high-voltage battery pack cell voltage balancing test.3. The method of claim 2, Wherein the deterrnining if the current floW Within the high-voltage portion is Within a predef1ned range of current floWs includes a preset time frame that the current floW remains Within the predef1ned range of current floWs.
[3] 3. Page 11 of17
[4] 4. The method of claim 1 further comprising:monitoring a current floW Within a low-Voltage portion of the hybrid-electric poWertrain;anddeterrnining if the current floW Within the low-Voltage portion is Within a predef1ned range before performing the high-Voltage battery pack cell Voltage balancing test.
[5] 5. The method of claim 4, Wherein the determining if the current floW Within the low-Voltageportion is Within a predef1ned range of current floWs includes a preset time frame that the current floW remains Within the predef1ned range of current floWs.
[6] 6. The method of claim 1, Wherein the high-Voltage battery pack cell Voltage balancing test is performed after initiating additional controllers.
[7] 7. The method of clairn 1, fiarther comprising:transmitting a signal indicative of current floW from the high-Voltage battery pack after completing the high-Voltage battery pack cell Voltage balancing test.
[8] 8. The method of claim 1, Wherein the signal from the master controller to the additional con-trollers to begin operation after closing the high-Voltage isolation contactor occurs generally fromabout 1100 ms to about 1600 ms after receiving an input from the operator interface indicative of a desire to start the vehicle. Page 12 of17
[9] 9. A method of operating a vehicle With hybrid-electric powertrain having an internal combus-tion engine, a generator, and a battery, the method comprising: receiving a vehicle start input signal from an operator interface; initiating a master controller after receiving the input from the operator interface; initiating at least one secondary controller after starting the initiation of the master control-ler; performing a high-voltage battery pack cell voltage balancing test utilizing the master con-troller; closing a high-voltage isolation contactor after performing the high-voltage battery pack cellvoltage balancing test; generating a signal from the master controller to the at least one secondary controller tobegin operation after closing the high-voltage isolation contactor; and dynamically balancing voltage Within the high-voltage battery pack cells during operation ofthe vehicle based upon results of the high-voltage battery pack cell voltage balancing test.
[10] 10. The method of claim 9 further comprising: monitoring a current floW Within a high-voltage portion of the hybrid-electric poWertrain;and deterrnining if the current floW Within the high-voltage portion is Within a predef1ned range of current floWs before performing the high-voltage battery pack cell voltage balancing test.ll. The method of claim 10, Wherein the deterrnining if the current floW Within the high-voltage portion is Within a predef1ned range of current floWs includes a preset time frame that the current floW remains Within the predef1ned range of current floWs.
[11] 11. Page 13 of17
[12] 12. The method of claim 9 further comprising: monitoring a current floW Within a low-voltage portion of the hybrid-electric poWertrain;and deterrnining if the current floW Within the low-voltage portion is Within a predef1ned range before performing the high-voltage battery pack cell voltage balancing test.
[13] 13. The method of claim 12, Wherein the deterrnining if the current floW Within the low-voltageportion is Within a predef1ned range of current floWs includes a preset time frame that the current floW remains Within the predef1ned range of current floWs.
[14] 14. A method of operating a vehicle With hybrid-electric poWertrain having an internal combus-tion engine, a generator, and a battery, the method comprising: receiving a shutdoWn signal input from an operator interface; deterrnining With a master controller a current amount of electrical activity of the hybrid-electric powertrain; reducing electrical activity of the hybrid-electric poWertrain by transmitting a control signalfrom the master controller to at least one secondary controller; opening a high-voltage isolation contactor once the electrical activity of the hybrid-electricpoWertrain reaches a predetermined threshold; performing a high-voltage battery pack cell voltage balancing test utilizing the master con-troller; balancing voltage Within the high-voltage battery pack based upon results of the high-voltage battery pack cell voltage balancing test; placing the at least one secondary controller into a sleep mode; placing the master controller into a sleep mode after the at least one secondary controller en-ters into the sleep mode; and shutting down the hybrid-electric poWertrain once the master controller enters into the sleep mode. Page 14 of17
[15] 15. The method of claim 14 further comprising: monitoring a current floW Within a high-Voltage portion of the hybrid-electric poWertrain;and deterrnining if the current floW Within the high-Voltage portion is Within a predef1ned range of current floWs before performing the high-Voltage battery pack cell Voltage balancing test.
[16] 16. The method of claim 15, Wherein the deterrnining if the current floW Within the high-Voltageportion is Within a predef1ned range of current floWs includes a preset time frame that the current floW remains Within the predef1ned range of current floWs.
[17] 17. The method of claim 14 further comprising monitoring a current floW Within a low-Voltage portion of the hybrid-electric poWertrain;and deterrnining if the current floW Within the low-Voltage portion is Within a predef1ned range before performing the high-Voltage battery pack cell Voltage balancing test.
[18] 18. The method of claim 17, Wherein the deterrnining if the current floW Within the low-Voltageportion is Within a predef1ned range of current floWs includes a preset time frame that the current floW remains Within the predef1ned range of current floWs.
[19] 19. The method of claim 14, Wherein the high-Voltage battery pack cell Voltage balancing test is performed after opening a high-Voltage isolation contactor.
[20] 20. The method of claim 14, further comprising:transmitting a signal indicative of a status of the high-Voltage battery pack after completing the high-Voltage battery pack cell Voltage balancing test.21. The method of claim 14, Wherein a start of placing additional controllers into a sleep mode occurs generally from about 2 ms to about 10 ms after opening the high-Voltage isolation contac- tor.
[21] 21. Page 15 of17
[22] 22. A method of balancing voltage within cells of a high-voltage battery pack of a vehicle hav-ing hybrid-electric powertrain, the method comprising: determining if a high-voltage electrical system discharge rate is between a first limit and asecond limit; determining if a low-voltage electrical system discharge rate is between a third limit and afourth limit; transitioning a high-voltage isolation contactor from a first state to a second state; determin-ing an amount of voltage in a plurality of cells of a high-voltage battery back; and balancing an amount of voltage in the plurality of cells of the high-voltage battery pack.
[23] 23. The method of claim 22, wherein the determining if the high-voltage electrical system dis-charge rate is between the f1rst limit and the second limit includes a preset time frame that the dis- charge rate remains between the f1rst limit and the second limit.
[24] 24. The method of claim 22, wherein the balancing voltage within cells of a high-voltage batterypack occurs at vehicle startup, wherein the f1rst state of the high-voltage isolation contactor is anopen state preventing current flow and the second state of the isolation contactor is a closed state allowing current flow.
[25] 25. The method of claim 22, wherein the balancing voltage within cells of a high-voltage batterypack occurs at vehicle shutdown, wherein the f1rst state of the high-voltage isolation contactor is aclosed state allowing current flow and the second state of the isolation contactor is an open state preventing current flow. Page 16 of17
类似技术:
公开号 | 公开日 | 专利标题
SE1450002A1|2014-02-14|Monitoring control system for hybrid electric powertrains
US8639413B2|2014-01-28|Vehicle power supply system and method for controlling the same
US7422293B2|2008-09-09|System and a method for dissipating voltage in an electrical circuit of a vehicle
KR20150130922A|2015-11-24|Power supply control device
CN104604085A|2015-05-06|Power system for a vehicle
CN105313710A|2016-02-10|An energy management method for hybrid power tramcars
US20150336468A1|2015-11-26|Power supply system for vehicle, vehicle comprising the same, and method for controlling power supply system for vehicle
US9145132B2|2015-09-29|Vehicle and deterioration diagnosis method for power storage device
EP2960127B1|2018-11-28|Control device for hybrid vehicle
CN103879301B|2016-04-13|A kind of method of charging control of extended-range electric vehicle
CN102555812A|2012-07-11|Energy control system and energy control method for electric vehicle
CN105313709A|2016-02-10|An energy management system for a hybrid power tramcar
US9845783B2|2017-12-19|Jumpstarting an internal combustion engine
US9758091B2|2017-09-12|Vehicle system and method for activating hazard lights during battery disconnect events
JP6186248B2|2017-08-23|Inverter abnormality determination device
CN103057541A|2013-04-24|Creep control device and method for hybrid vehicle
US9566916B2|2017-02-14|Hybrid electric vehicle power-up sequencing with VVC test
JP2009227078A|2009-10-08|Power system, its control method, and vehicle
US10065632B2|2018-09-04|Method and arrangement for operating a hybrid electrical vehicle
US20190061555A1|2019-02-28|Systems and methods for monitoring of a hybrid energy storage device
US9713965B2|2017-07-25|Variable precharge timing
JP2020192865A|2020-12-03|Vehicular power supply control device
CN105197013B|2017-11-21|Startup control method, device and the vehicle of vehicle
CN108128166B|2021-05-07|Power supply control method and device for hybrid electric vehicle and hybrid electric vehicle
US11052743B2|2021-07-06|Oil maintenance strategy for electrified vehicles
同族专利:
公开号 | 公开日
DE112011105344T5|2014-03-13|
US20140136038A1|2014-05-15|
DE112011105344B4|2022-01-20|
WO2012173630A1|2012-12-20|
CN103608743A|2014-02-26|
CN103608743B|2017-06-27|
SE1450002A1|2014-02-14|
US9102313B2|2015-08-11|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题

EP0919078A1|1996-08-09|1999-06-02|Volkswagen Aktiengesellschaft|Process and device for monitoring and/or controlling charging of a modular battery, particularly in a battery powered vehicle|
JP3736268B2|2000-03-21|2006-01-18|日産自動車株式会社|Control device for hybrid vehicle|
US20020141946A1|2000-12-29|2002-10-03|Advanced Inhalation Research, Inc.|Particles for inhalation having rapid release properties|
US7378818B2|2002-11-25|2008-05-27|Tiax Llc|Bidirectional power converter for balancing state of charge among series connected electrical energy storage units|
JP4370297B2|2005-11-25|2009-11-25|矢崎総業株式会社|Battery management device|
KR100906907B1|2006-10-10|2009-07-08|현대자동차주식회사|Car battery management system|
JP5459946B2|2007-09-28|2014-04-02|株式会社日立製作所|DC power supply for vehicle|
JP5469813B2|2008-01-29|2014-04-16|株式会社日立製作所|Battery system for vehicles|
US7904217B2|2008-03-25|2011-03-08|International Truck Intellectual Property Company, Llc|Battery pack management strategy in a hybrid electric motor vehicle|
US7909124B2|2008-04-02|2011-03-22|GM Global Technology Operations LLC|Power systems for hybrid electric vehicle |
DE112010004285T5|2009-11-06|2013-01-17|International Truck Intellectual Property Company, Llc|Control system for equipment on a vehicle with a hybrid electric powertrain|
DE102009020178A1|2009-05-06|2010-11-11|Continental Automotive Gmbh|System for storing energy|
US8207740B2|2009-06-23|2012-06-26|GM Global Technology Operations LLC|Method for use with a vehicle battery pack having a number of individual battery cells|
US20110017533A1|2009-07-24|2011-01-27|International Truck Intellectual Property Company, Llc|Hybrid traction motor initiated remote start-stop system|
US20130197780A1|2010-10-08|2013-08-01|Dale A. Oehlerking|Supervisory control system for series type hybrid-electric powertrains|
US8598847B2|2010-12-07|2013-12-03|Volkswagen Ag|Balancing voltage for a multi-cell battery system|
US8742615B2|2011-01-14|2014-06-03|GM Global Technology Operations LLC|Method and apparatus for electric power management in a vehicle|
SE538214C2|2011-06-17|2016-04-05|Int Truck Intellectual Prop Co|Monitoring control system for hybrid electric powertrains|
US9350187B2|2012-01-09|2016-05-24|Johnson Controls Technology Llc|Pre-charging vehicle bus using parallel battery packs|SE538214C2|2011-06-17|2016-04-05|Int Truck Intellectual Prop Co|Monitoring control system for hybrid electric powertrains|
US9673653B2|2013-03-13|2017-06-06|Ford Global Technologies, Llc|Control of power flow in battery cells of a vehicle|
CN104071153B|2013-03-25|2017-02-08|北汽福田汽车股份有限公司|Starting control method for hybrid electric vehicle|
US10196066B2|2016-01-11|2019-02-05|Cnh Industrial America Llc|Automotive productivity manager for power shift transmissions|
EP3424123A1|2016-03-01|2019-01-09|Volvo Truck Corporation|A method and system for controlling a current being fed to a battery pack|
DE102016005959A1|2016-05-13|2017-11-16|Man Truck & Bus Ag|Traction energy storage system and configuration method therefor|
DE102016008978A1|2016-07-23|2018-01-25|Man Truck & Bus Ag|Traction energy storage system for a vehicle|
US10336314B2|2017-07-26|2019-07-02|Gm Global Technology Operations Llc.|Hybrid powertrain system|
US10745013B1|2019-06-13|2020-08-18|Ford Global Technologies, Llc|Methods and systems for engine idle stop|
法律状态:
2017-01-31| NUG| Patent has lapsed|
优先权:
申请号 | 申请日 | 专利标题
PCT/US2011/040889|WO2012173630A1|2011-06-17|2011-06-17|Supervisory control system for hybrid-electric powertrains|
[返回顶部]