![]() TO Mooring
专利摘要:
A mooring and anchoring device for boats and other floating objects where the combination of Buoy and Fixed mooring lines are combined. Two ropes interact where one is attached to the anchorage at the bottom and the other is pulled as a beer through the first and then further in a pipe held straight by a float in the water.gg PP PP When you grab the top loop, the rope is extended automatically at the same time as the pipe and floating body naker. When the line is released, the floating body "pulls" the line into the pipe at the same time as the buoy regains its position of origin where the pipe prevents the line from ending up in, for example, propellers or bow propellers. The device facilitates mooring as this can be done more smoothly with a fixed mooring line or buoy. 公开号:SE1630016A1 申请号:SE1630016 申请日:2016-01-28 公开日:2017-07-29 发明作者:Osbjer Tomas 申请人:Osbjer Tomas; IPC主号:
专利说明:
PATENT APPLICATION "TO MOORING" A NEW APPLICATION DEVICE DESCRIPTION DESCRIPTION OF THE "TO MOORING" SYSTEM'S FUNCTIONS AND PROBLEM SOLVING. BACKGROUND Today, there are three dominant systems for mooring to jetties. Buoy, Fixed mooring line, or booms Booms are a technically good mooring technique but are expensive and they are not efficient gas ports because they are fixed in terms of width on site. Buoys are a good solution that has historically been the only alternative to fixed barriers. The costs for buoys are lower than barriers but relatively high. Fixed mooring lines are a phenomenon that is popular in the Mediterranean and has now also become fixed in Sweden. CONSTRUCTION DESCRIPTION The entire construction is developed with as few details as possible and to utilize the laws of nature as driving forces. å, -zl! -. åäæëh 1. The base is a plastic pipe with a suitable dimension and length (ex L 3 m D 35 mm) 2. The upper part is a floating body attached with a volume required to create lifting force. at the top so that the rope can easily slide into the tube. At the bottom attachment for the rope 4. The lower exposed rope is to create the extension of the mooring rope 5. The rope runs through the entire tube and ends at the top with a larger diameter ring than the diameter of the pipe. 6. The lower rope goes through a rope with a ring which is then attached to the fixed anchorage (stone, concrete block or chain) with a suitable length. All parts fulfill important functions without being complex. All dimensions are adapted for how the TO Mooring is to be used and the conditions that are in each place (eg depth, distance to bridge, roughness of tamp, etc.) To Mooring is primarily there to replace the fixed mooring lines but its advantages are so sweet that buoys can also be replaced: FUNCTIONAL DESCRIPTION The functions in TO Mooring are as simple as they are ingenious. The principle is to take advantage of fast mooring lines and buoy ars without having their disadvantages. The entire device is basically maintenance-free with simple proven materials. HOW IT WORKS n TO Mooring floats in its normal position with about half the floating body above the water surface with the tampon in a ring (caus) on top. n When you are about to dock, simply take the rope with your hand or boat hook and pull out the rope n The pipe with the floating body is then pulled down below the water surface the more you pull the rope. When the maximum lid of the rope is extended, the extension of the rope is locked with the bottom bracket. n When you want to detach yourself from the dock, you simply release the barrel, the floating body will then immediately pull the barrel down into the pipe and float up the surface in a normal position. The function dr den rdnønm een / rett ont det dr en fdrtjörtojníng fnot leg / ggn e // er ont det dr enfrírtående fl etojníng (fnotwnrnnde bojjnå my). TROUBLESHOOTING TO Mooring has these advantages over fixed mooring line: The upper part of the tampon is completely dry and a few more meters are in the pipe without access to sunlight, ie no growths on the tampon. mooring must go to the bridge to catch the rope and then the lead back so that you can tie it, this type of mooring is almost impossible to moor somensailers if there is the least crosswind. When sailing in, the pipe protects the tampon from ending up in a propeller or bow thruster because the floating body will move if you drive on it. When mooring on a "sway", TO Mooring has the advantage that the pipe and the floating body are pulled down the underwater surface when mooring, which then counteracts the "buoy" hitting the boat and creating noise. FIGURES The figure is not to scale as all dimensions depend on the conditions in which the TOU ring is to be used 1. Pipe 2. Floating body 3. Locking of tarnp 4. Mooring line 5. Loop or knot to prevent the spirit of the rnooring line from entering the pipe 6. Loop rned sliding function and cam to bottom weight Pig 1 PRINCIPLE SKETCH r / r / r / r / â fi \\\\\ 'v // x // ßf / -. \\ .ßx \\ \\\\\\\\\ w * \\\ w \\ \\\\\\\\\ \\\\\ wva * \ ß * \\\\\\\\\\ ** “/ f / f / f / óz / 'ííff / í «v \\ '°' Il / rm \" \\ v * \ \\\\\\\\\\\\\ \\\\\\ æ \\ \\\\\\\\\\\ * e \\\\ \\\\\\\\\\\\\\\\\\\ ß * \\\\\ æx \ Q \ '\\\\\ _ Q \\\ F1g 2 ~ °° \\\\\\\ \\\\\\ * * °
权利要求:
Claims (1) [1] The patent relates to a buoy consisting of plastic tubes with a floating body and where a rope is attached to one end with a slack which passes through a loop with a rope which in turn is attached in some form of anchorage. The rope is pulled through the tube to the top in such a way that the rope is extended when you pull on the upper end and the buoy is then pulled down. The upper part of the rope ends with a Kaus or similar to prevent the rope from entering the tube. The buoyancy force reverses the process when the rope is released, ie the rope is pulled into the pipe at the same time as the buoy floats up to the surface. The bracket is designed so that the force is distributed and locks the barrel in the maximum position.
类似技术:
公开号 | 公开日 | 专利标题 US10207773B2|2019-02-19|Corrosion-and-chafing-resistant, buoy system and method CN107255060A|2017-10-17|Rope draining cylinder pressure wave-activated generator US20190271127A1|2019-09-05|Multipurpose combined flexible floating breakwater US20100276934A1|2010-11-04|System for generating electric power from fluid current JP2016523340A|2016-08-08|Multi-function mounting device for tidal current generator and method of using the same CN109356778A|2019-02-19|Rope draining cylinder pressure wave-activated generator SE509354C2|1999-01-18|Water system loading system CN1442342A|2003-09-17|Under water flexible raft laying engineering ship and under water flexible raft laying technology KR100927474B1|2009-11-19|Surface floating waste collection device CN205668627U|2016-11-02|A kind of folding ship anchor CN107697230A|2018-02-16|A kind of anchorage regardless prestretching anchoring method SE1630016A1|2017-07-29|TO Mooring CN104314051B|2016-06-08|A kind of mooring cushions anti-ship and hits system US20120000411A1|2012-01-05|Anchor device for coral rock KR101066118B1|2011-09-20|Anchor and silt protector having the same CN209396007U|2019-09-17|Spitkit side collision early warning protection device under a kind of harsher wind conditions CN107054572A|2017-08-18|A kind of flood disaster prevention and reduction ship CN106516008B|2018-06-08|A kind of ship packaged type anchoring device CN203625863U|2014-06-04|Stopping system for overwater floating objects CN107826214B|2019-02-19|It sea area probing sand anchor and casts anchor and the method that weighs anchor CN102666268A|2012-09-12|Mooring retrieval device CN204821997U|2015-12-02|Pier anchoring system suitable for typhoon is prevented to semi -submerged platform US20150376852A1|2015-12-31|Beach Maintenance System CN209144737U|2019-07-23|A kind of novel harbour anchor device CN207553067U|2018-06-29|A kind of floatable port security door
同族专利:
公开号 | 公开日 SE539855C2|2017-12-19|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
法律状态:
优先权:
[返回顶部]
申请号 | 申请日 | 专利标题 SE1630016A|SE539855C2|2016-01-28|2016-01-28|mooring device|SE1630016A| SE539855C2|2016-01-28|2016-01-28|mooring device| 相关专利
Sulfonates, polymers, resist compositions and patterning process
Washing machine
Washing machine
Device for fixture finishing and tension adjusting of membrane
Structure for Equipping Band in a Plane Cathode Ray Tube
Process for preparation of 7 alpha-carboxyl 9, 11-epoxy steroids and intermediates useful therein an
国家/地区
|