![]() RAIL WORKS VEHICLE, WORK TRAIN COMPRISING SUCH A WORK VEHICLE AND METHOD OF MANUFACTURING A RAILWAY
专利摘要:
This vehicle (3) of railway works, comprises a gantry (21), which includes amounts, and a first means of movement of the railway railway vehicle relative to the ground in at least one direction of advance (D1) of the vehicle of railway works. According to the invention, the railway work vehicle (3) comprises at least one robotic arm (19) mounted on the gantry (21), between the uprights, this robotic arm being configured to have at least one insert (33) in a slab (11) of fresh concrete located in a working area (31) below the gantry. 公开号:FR3053367A1 申请号:FR1656075 申请日:2016-06-29 公开日:2018-01-05 发明作者:Fabrice Collignon;Nicolas Rada 申请人:Alstom Transport Technologies SAS; IPC主号:
专利说明:
© Publication no .: 3,053,367 (to be used only for reproduction orders) ©) National registration number: 16 56075 ® FRENCH REPUBLIC NATIONAL INSTITUTE OF INDUSTRIAL PROPERTY COURBEVOIE ©) Int Cl 8 : E 01 B 29/06 (2017.01), B 61 D 15/08 A1 PATENT APPLICATION ©) Date of filing: 06.29.16. © Applicant (s): ALSTOM TRANSPORT TECHNOLO- (30) Priority: GIES — FR. ©) Inventor (s): COLLIGNON FABRICE and RADA NICOLAS. (43) Date of public availability of the request: 05.01.18 Bulletin 18/01. (56) List of documents cited in the report preliminary research: Refer to end of present booklet (© References to other national documents ©) Holder (s): ALSTOM TRANSPORT TECHNOLO- related: GIES. ©) Extension request (s): ©) Agent (s): LAVOIX. LÔ4J RAILWAY VEHICLE, WORK TRAIN COMPRISING SUCH A WORK VEHICLE AND METHOD FOR MANUFACTURING A RAILWAY. FR 3 053 367 - A1 This railway works vehicle (3) comprises a gantry (21), which includes uprights, and a first means of displacement of the railway works vehicle relative to the ground in at least one direction of advance (D1) of the railway vehicle. railway works. According to the invention, the railway work vehicle (3) comprises at least one robotic arm (19) mounted on the gantry (21), between the uprights, this robotic arm being configured to have at least one insert (33) in a slab (11) of fresh concrete located in a work area (31) located below the gantry. Railway works vehicle, works train comprising such a works vehicle and method of manufacturing a railway track The present invention relates to a railway work vehicle, a work train comprising such a work vehicle as well as a method of manufacturing a railway track without a crosspiece using such a work vehicle. EP-A2-0 803 609 describes a method of manufacturing a railway track in which a concrete slab having a firm consistency and a smooth surface is poured. While the concrete is fresh, saddles are placed in rows. Each saddle is introduced into the concrete by being vibrated by means of a vibrating device, until it reaches a given position. Thanks to the vibration, the concrete envelops the anchors of the saddles to secure them with the concrete. The rails of the railway track are then directly mounted on the saddles, so that one obtains a railway track without ties. The vibration of the saddles is generally carried out using a specialized work vehicle comprising a system of hydraulic cylinders capable of performing this function. However, the insertion of the saddles requires relatively heavy means which are in particular not suitable for inclining the saddles in the case of a railway track having a significant slope, or, in general, a significant transverse gradient. In addition, in the event that the railway track to be constructed extends within a tunnel, it may prove difficult to supply this specific work vehicle with saddles. It is to these drawbacks that the present invention aims to remedy by proposing a new railway work vehicle which, while having a higher productivity than the vehicles of the prior art, facilitates the production of railway tracks, in particular when they have a strong transverse gradient or that they are located in a railway tunnel. The subject of the present invention is a railway works vehicle, comprising: - a portal frame, which includes uprights, and - A first means of moving the railway works vehicle relative to the ground in at least one direction of advance of the railway works vehicle. According to the invention, this railway work vehicle comprises at least one robotic arm mounted on the gantry, between the uprights. This robotic arm is configured to have at least one insert in a fresh concrete slab located in a work area located below the gantry. The work vehicle of the invention makes it possible to obtain a particularly high productivity, insofar as the robotic arm is capable of reaching, for a given position of the work vehicle, an extended work area, while working at a speed relatively high. Furthermore, the arrangement of the robotic arm relative to the gantry makes it particularly suitable for inserting inserts in the context of the construction of a railway track with a steep transverse slope. According to other advantageous characteristics of the invention, taken individually or in combination: - The gantry includes a roof support which interconnects the uprights by an upper end of the latter, while the robotic arm is suspended from the roof support. - The vehicle includes a working compartment within which the robotic arm is arranged, the working compartment comprising two side walls, mounted on the uprights, as well as a lower opening, through which the robotic arm can reach the Work zone. - Two robotic arms are provided, being arranged in pairs on either side of a sagittal plane of the railway works vehicle, the sagittal plane being substantially perpendicular to the ground and parallel to the direction of advance. - The robotic arm comprises at least one basic rotary actuator, integral with the gantry, and a first member mounted on the basic rotary actuator, the basic rotary actuator being able to rotate the first member around an axis base, preferably substantially perpendicular to the direction of advance. - The robotic arm has six degrees of freedom and is configured to vibrate the insert in the work area during its insertion into the fresh concrete slab. - The vehicle includes a module for feeding the robotic arm with inserts, the power module including: • a ramp located at a rear end of the railway work vehicle, capable of being supplied with inserts from outside the railway work vehicle, and • an insert storage compartment, the storage compartment being supplied with inserts by the ramp and being located between the ramp and the robotic arm, and the robotic arm is configured to grip the inserts in the storage compartment. The invention also relates to a work train comprising a railway work vehicle in accordance with the above as well as a follower vehicle including: - an insert storage tray extending from a front end of the follower vehicle, a second means of displacement of the following vehicle relative to the ground in at least the direction of advance, and - An automatic control module of the second displacement means, the control module being configured to automatically control the displacement of the following vehicle in the direction of advance via the second displacement means, so that the end before the following vehicle is kept at a predetermined tracking distance from the railway work vehicle. Advantageously, the follower vehicle comprises means for conveying the inserts stored on the storage tray in the direction of the front end. The invention also relates to a method of manufacturing a railway track without a crosspiece, according to the invention the method is implemented with a railway work vehicle as described above, or with a work train such as described above. The invention will be better understood on reading the description which follows, given solely by way of non-limiting and non-exhaustive example, and made with reference to the drawings in which: Figure 1 is a perspective view of a work train according to the invention; Figure 2 is a longitudinal section on a plane II-II visible in Figure 1, of the work vehicle of Figure 1; Figure 3 shows a detail of the construction vehicle of Figures 1 and 2, according to the frame III visible in Figure 2; Figure 4 is a cross section, taken along the plane IV visible in Figure 1, of the work train of the previous figures; and Figure 5 shows a bottom view of the work train of the previous figures. The work train 1 shown in FIG. 1 comprises a work vehicle 3, sometimes called an inserter vehicle, as well as a follower vehicle 5. The work train 1 is designed for the realization of a railway track for the circulation of trains. Such a railway track is preferably a so-called "cross-member" track, visible in FIGS. 2 and 4, and comprising a longitudinal concrete slab 11, on which is installed a pair of rails, secured to this slab 11 by means of 'inserts 33, sometimes called saddles, located in said slab 11. This type of railway and its inserts are known as such. The vehicles 3 and 5 are capable of moving in a direction of advance D1 and in a direction of reverse D2 opposite, represented by arrows in the figures. For this, each of the vehicles 3 and 5 is provided with several motorized wheels by means of which they are supported on the ground. In the example illustrated, the vehicle 3 comprises two bogies 7 of motorized wheels constituting these means of displacement relative to the ground, the vehicle 5 also comprising two bogies 9 of similar function. Vehicles 3 and 5 are designed to move above the concrete slab 11 which extends parallel to direction D1, the bogies 7 and 9 being configured so that the motorized wheels roll on parallel treads between which extends the concrete slab 11, as visible in FIG. 4. The treads are, in practice, formed on the surface of a civil engineering structure supporting the slab. The wheels rest directly on the structure, preferably without rail or other support than the structure itself. Conventionally, the bogies 7 and 9 are rotatable around vertical axes to adapt to possible curvatures of the future rail track which is intended to form the concrete slab 11. The direction of advance D1 is presently defined when the bogies 7 and 9 are oriented in a so-called "straight" orientation, for a movement of the train 1 in a straight line, when the track is itself in a straight line. Furthermore, the vehicles 3 and 5 respectively comprise a body 13 and 15 resting on the bogies 7 and 9. The body 13 defines a front end 13A of the vehicle 3, directed in the direction D1, and an opposite rear end 13B, as illustrated in Figure 1. Similarly, the body 15 defines a front end 15A of the vehicle 5, directed in the direction D1, and an opposite rear end 15B. The ends 13B and 15A are adjacent. The body 13 comprises, in a central part located between the two bogies 7, a working compartment 17 within which two robotic arms 19 are arranged. The body 13 also comprises, between the two bogies 7, a gantry 21, which includes four uprights 23, oriented vertically with respect to the ground, each of the uprights 23 rising vertically from one of the bogies 7 in order to constitute a framework for the working compartment 17 and delimiting the latter. The working compartment 17 comprises two side walls 25, mounted on the uprights 23, the side walls 25 extending at a distance from each other and being directed in planes parallel to the direction of advance D1. The side walls 25 each form a panel which forms part of the outer envelope of the box 13, covering at least a portion of the height of the box 13. The side walls 25 each extend in a plane substantially orthogonal to the axis of the wheels when the bogies 7 are in their straight orientation. The robotic arms 19 extend between the vertical uprights 23 of the gantry 21 and between the side walls 25. The gantry 21 further comprises a roof support 27, consisting of a set of beams connecting the uprights 23 to each other by one end superior of these. The robotic arms 19 are suspended from this roof support 27 so as to be enclosed and protected in the working compartment 17. The latter comprises a lower opening 29 opposite the roof support 27 and visible in particular in FIG. 5. The robotic arms 19 are configured to reach a work area 31 located under the body 13 between the two bogies 7 via the opening 29 which opens at this location. The robotic arms 19 can thus arrange the inserts 33 at this working area 31 in the concrete slab 11, when the concrete of the slab 11 is still fresh, to build the aforementioned rail track. Within the working compartment 17, the two robotic arms 19 are arranged on either side of a sagittal plane P1 of the vehicle 3, the sagittal plane being substantially perpendicular to the ground and parallel to the direction of advance D1. When the bogies are oriented in a straight line, the sagittal plane P1 is thus perpendicular to the axis of the wheels of the bogies 7 and constitutes a median plane of the vehicle 3. Thus, preferably, each of the robotic arms 19 is positioned close to and at plumb with one of the future rails of the railway track under construction, that is to say plumb with the position of installation of the inserts 33. Each robotic arm 19 comprises a basic rotary actuator 35 by means of which it is implanted in the roof support 27 of the gantry 21. This basic rotary actuator 35 comprises in particular a support structure for the robotic arm 19 as well as a motor , and is schematically represented in FIG. 3 by a square. Each robotic arm 19 is thus suspended from the roof support 27, by means of its respective basic rotary actuator 35, and projects downwards in the direction of the concrete slab 11. Each robotic arm 19 comprises a first member 37 which is mounted on the basic rotary actuator 35, so that the basic rotary actuator 35 rotates this first member 37 about a basic axis X35, substantially perpendicular to the direction of advance D1 and parallel to the sagittal plane P1. This particular configuration gives the robotic arms 19 the ability to reach a particularly large work area 31. The first member 37 comprises a first rotary actuator 39 about an axis X39, a second member 41 of the robotic arm 19. The axis X39 is perpendicular to the axis X35. The second member 41 forms an arm which extends from the first rotary actuator 39, perpendicular to the axis X39, up to a second rotary actuator 43 of the robotic arm 19. The second rotary actuator 43 is configured to support and drive in rotation a third member 45 of the robotic arm 19 about an axis X43 parallel to the axis X39. The third member 45 includes a third rotary actuator 49 supporting and driving in rotation a fourth member 51 of the robotic arm 19, around an axis X49 orthoradial with respect to the axis X43. The fourth member 51 forms an arm which extends along the axis X49 and which is provided with a fourth rotary actuator 53 disposed at an end opposite to the third rotary actuator 49. Via the fourth rotary actuator 53, the fourth member 51 supports and rotates a fifth member 55 around an axis X53 perpendicular to the axis X49. The fifth member 55 forms an arm and comprises a fifth rotary actuator 57 by means of which it supports and rotates a gripping member 59 of the robotic arm 19 about an axis X57. The axis X57 is perpendicular to the axis X53 and coaxial with the fifth member 55. The gripping member 59 forms a terminal member of the robot 19. The gripping member 59 is able to grip the inserts 33 and the robotic arm 19 to move its gripping member 59 through the various members and rotary actuators described above to insert them into the part of the slab 11 which is located in the working area 31. Thanks to its six rotary actuators and to its various members, the robotic arm 19 has six degrees of freedom and is capable of vibrating the insert 33 in the working area 31 during the insertion of this insert 33 into the fresh concrete of the concrete slab 11. Here, the rotary actuators 35, 39, 43, 49, 53 and 57 are formed by electric servomotors. The robotic arm 19 is preferably controlled by an automaton. This automaton is configured to operate the robotic arm 19 automatically. Optionally, the robot and the robotic arm 19 can be controlled remotely from a remote control station. Alternatively, this control station is located on board the work train 1, or even the work vehicle 3. This control station is not illustrated in the figures. The work vehicle 3 further comprises a supply module 61 for the robotic arms 19 with inserts 33. This supply module 61 includes a compartment 63 for storing inserts 33, which extends within the body 13 from the rear end 13B to the working compartment 17, as can be seen in FIG. 2. The compartment 63 contains a stock of inserts 33 and communicates with the working compartment 17 so that the robotic arms 19 can recover by themselves the inserts 33 contained in the compartment 63. The power supply module 61 also includes a ramp 65 located at the rear end 13B and projecting outside the compartment 63 in the direction D2, so that the ramp 65 can be supplied with inserts 33 from outside the vehicle 3. The compartment 63 is thus supplied with inserts 33 by the ramp 65. The vehicle 3 also comprises a generator group 67 capable of generating energy, to supply the robotic arms 19 as well as auxiliary equipment of the work train 1. The generator group 67 extends from the work compartment 17 to the front end 13A. The body 15 of the follower vehicle 5 includes a tray 69 for storing inserts 33 which rests on the bogies 9. The tray 69 advantageously extends from the front end 15A to the rear end 15B. The body 15 also includes side walls 71 and a roof 72 which form a tunnel with the plate 69, this tunnel being directed in the direction of advance D1. Inserts 33 of reserve are stored within this tunnel in buckets 73, sometimes called “big-bags”, resting on the plate 69. Each bucket 73 preferably forms a flexible container of large capacity, provided with straps. The follower vehicle 5 is provided with means for conveying the buckets 73, of the overhead crane type, symbolized by the square 75 in FIG. 2. The overhead crane 75 is able to move the buckets 73 within the body 15, in order to in particular to bring them near the front end 15A. The inserts 33 are then transferred by an operator, manually, to the ramp 65 in order to power the vehicle 3. Alternatively, an overhead crane or a crane can be provided to effect this transfer automatically or assist the operator in this transfer operation. The follower vehicle 5 is provided with an automatic control module 77 for the bogies 9. The control module 77 forms for example an automaton, which is configured to automatically control the movement of the vehicle 5 in the directions D1 and D2 via bogies 9, so that the vehicle 5 follows the movement of the vehicle 3. In practice, the control module 77 moves the vehicle 5 so that the front end 15A of the vehicle 5 is kept at a distance of predetermined tracking d of the rear end 13B of the vehicle 3. This tracking distance d is measured parallel to the direction of advance D1, from the end 15A to the end 13B, and is preferably between 30 and 400 cm . Thus, the work vehicle 3 and the follower vehicle 5 are designed to move in a coordinated manner without however being coupled. The absence of coupling between vehicles 3 and 5 allows, when necessary, to desynchronize in a particularly easy way the movement of vehicles 3 and 5. Thus, by way of example, vehicle 3 can carry out work on the railway track while the vehicle 5 can be detached and sent to an insert replenishment area 33. Alternatively, a conventional hitch is provided between vehicles 3 and 5 to provide a similar function. The work train 1 thus described is therefore particularly suitable for the manufacture of a railway track without a crosspiece. As a variant, the work vehicle 3 comprises a second pair of robotic arms, arranged in the working compartment 17 or in a second working compartment of the vehicle 3. This second pair of robotic arms is arranged so that the robotic arms either aligned with the future rails of the rail track, that is to say on either side of the sagittal plane P1 of the vehicle 3. Alternatively, the vehicle 3 includes more pairs of robotic arms. In another variant, the vehicle 3 only comprises a single robotic arm, which is then preferably placed in the sagittal plane P1. Also in a variant, the vehicle 3 comprises a pair of robotic arms conforming to the preceding description, as well as an additional robotic arm arranged in the sagittal plane P1, so that the vehicle 3 is particularly suitable for the construction of a track. rail with three rails. As a variant, the means of movement of the vehicles 3 and 5 are formed by crawler trains or a system of wheels adapted to roll on metal rails. The embodiments and variants described in the foregoing can be combined to create new embodiments.
权利要求:
Claims (10) [1" id="c-fr-0001] 1 Railway works vehicle (3), comprising: - a gantry (21), which includes uprights (23), and a first means (7) for moving the railway works vehicle relative to the ground in at least one direction of advance (D1) of the railway works vehicle, this railway work vehicle (3) being characterized in that it comprises at least one robotic arm (19) mounted on the gantry (21), between the uprights, and in that this robotic arm is configured to have at least one insert (33) in a slab (11) of fresh concrete located in a work area (31) located below the gantry. [2" id="c-fr-0002] 2, - Railway works vehicle (3) according to claim 1, characterized in that the gantry (21) comprises a roof support (27) which interconnects the uprights by an upper end of the latter and in that the robotic arm (19) is suspended from the roof support. [3" id="c-fr-0003] 3, - Railway works vehicle (3) according to any one of the preceding claims, characterized in that it comprises a working compartment (17) within which the robotic arm (19) is arranged, the working compartment comprising two side walls (25), mounted on the uprights (23), as well as a lower opening (29), through which the robotic arm can reach the working area (31). [4" id="c-fr-0004] 4, - Railway works vehicle (3) according to any one of the preceding claims, characterized in that two robotic arms (19) are provided, being arranged in pairs on either side of a sagittal plane (P1) of the railway work vehicle, the sagittal plane being substantially perpendicular to the ground and parallel to the direction of advance (D1). [5" id="c-fr-0005] 5, - Railway works vehicle (3) according to any one of the preceding claims, characterized in that the robotic arm (19) comprises at least one basic rotary actuator (35), integral with the gantry (21), and a first member (37) mounted on the basic rotary actuator, the basic rotary actuator being capable of rotating the first member around a basic axis (X35), preferably substantially perpendicular to the direction of advance (D1). [6" id="c-fr-0006] 6. - Railway works vehicle (3) according to any one of the preceding claims, characterized in that the robotic arm (19) has six degrees of freedom and is configured to vibrate the insert (33) in the area working (31) during the insertion of the latter into the slab (11) of fresh concrete. [7" id="c-fr-0007] 7. - Railway works vehicle (3) according to any one of the preceding claims, characterized in that it comprises a supply module (61) of the robotic arm (19) in inserts (33), the module food including: - a ramp (65) located at a rear end (13B) of the railway works vehicle, capable of being supplied with inserts from outside the railway works vehicle, and - a compartment (63) for storing inserts, the storage compartment being supplied with inserts by the ramp and being located between the ramp and the robotic arm (19), and in that the robotic arm is configured to grip the inserts in the storage compartment. [8" id="c-fr-0008] 8. - Work train comprising a railway work vehicle (3) according to any one of the preceding claims as well as a follower vehicle (5) including: - a tray (69) for storing inserts (33) extending from a front end (15A) of the follower vehicle, - a second means (9) for moving the following vehicle relative to the ground in at least the direction of advance (D1), and an automatic control module (77) of the second movement means, the control module being configured for automatically controlling the movement of the follower vehicle in the direction of advance (D1) via the second displacement means, so that the front end (15A) of the follower vehicle is kept at a tracking distance (d ) predetermined railway works vehicle (3). [9" id="c-fr-0009] 9. - Work train according to claim 8, characterized in that the follower vehicle (5) comprises means (75) for conveying the inserts (33) stored on the tray (69) for storage in the direction of the front end (15A). [10" id="c-fr-0010] 10.- A method of manufacturing a railway track without cross, characterized in that it is implemented with a railway work vehicle (3) according to any one of claims 1 to 7 or with a work train according to either of claims 8 or 9, the method comprising a step in which the 5 robotic arm (19) of the railway work vehicle has at least one insert (33) in a slab (11) of fresh concrete located in a work area (31) located below the gantry of the railway work vehicle. 3/5 K. 4/5 5/5
类似技术:
公开号 | 公开日 | 专利标题 EP3263768B1|2018-11-21|Railway construction vehicle and railway construction process CA2497310A1|2004-03-18|System of transporting and storing containers of semiconductor wafers and transfer mechanism EP0004985A1|1979-10-31|Train for the renewal of a railway track EP2882568B1|2016-08-03|Method and unit for welding motor vehicle body elements, including rapid tool change by means of a hoisting turret EP0584026A1|1994-02-23|Coupling assembly between two successive wagons and a common bogie FR2713679A1|1995-06-16|Work train to replace old railway sleepers with new sleepers and process for the implementation thereof. FR3086268A1|2020-03-27|METHOD FOR ASSEMBLING AN AIRCRAFT FUSELAGE SECTION FROM TWO SUPERIOR AND BOTTOM UPPER PARTS, VERSATILE MOUNTING SUPPORT, TOOLS AND FUSELAGE SECTION PRODUCTION UNIT FOR IMPLEMENTING SAID PROCESS FR2988737A1|2013-10-04|DOUBLE FLOW BALLASTAGE TRAIN. EP2993266B1|2019-03-27|System and method for transporting equipment WO2006072684A1|2006-07-13|Workshop trolley EP3421717A1|2019-01-02|Follower gear of a tunnelling machine comprising means for conveying a keystone WO2006111620A1|2006-10-26|Special wheeled containers, their transporting trucks, and uses thereof FR2863237A1|2005-06-10|Railway wheels positioning process for rail transit car, involves moving rail transit car with retractable railway wheels on ground by transporting car under terrestrial vehicle provided with two sets of tires EP2097210B1|2011-04-13|Method of and system for positioning a part on an assembly and manufacture line CH653072A5|1985-12-13|RAILWAY MACHINE FOR LAYING AND DEPOSITING SECTIONS OR ASSEMBLED TRACKS. EP1827904A1|2007-09-05|Mobile support and transfer cross-member for loading and unloading a load, on a trailer from a truck equipped with a load-handling arm EP0032471B1|1984-08-08|Dismountable wagon for the technical coordination of road-rail transport FR2868743A1|2005-10-14|Special container for transporting e.g. building waste, has castor wheel to laterally load using portals of cargo truck and trailers, which are provided with extendable platforms to carry out lateral loading/unloading of container EP3892775A1|2021-10-13|Carriage for transferring sleepers and associated railway vehicle EP3892776A1|2021-10-13|Mechanism for movement to-and-fro of piles of sleepers and railway vehicle comprising such a mechanism EP3599526A1|2020-01-29|Automated system and method for transferring parts FR3009724A1|2015-02-20|METHOD FOR REPLACING RAILS AND ASSOCIATED RAILWAYS. BE1005442A3|1993-07-27|Method and system for machining long elements, notably aeronautical metalelements FR2511275A1|1983-02-18|DEVICE FOR AUTOMATIC DRILLING OF PLANAR PANELS, IN PARTICULAR OF VEHICLE LENGTHS FR3071209A1|2019-03-22|LONGITUDINAL CONSTRUCTION ELEMENT HANDLING SYSTEM, HANDLING VEHICLE EQUIPPED WITH SUCH A SYSTEM
同族专利:
公开号 | 公开日 DK3263768T3|2019-03-18| EP3263768B1|2018-11-21| ES2712126T3|2019-05-09| CA2972087A1|2017-12-29| AU2017204414A1|2018-01-18| PL3263768T3|2019-05-31| SG10201705314XA|2018-01-30| EP3263768A1|2018-01-03| FR3053367B1|2019-07-05|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题 EP1396578A1|2002-09-04|2004-03-10|Volker Stevin Rail & Traffic BV|Method for processing a railway track| FR2941973A1|2009-02-12|2010-08-13|Alstom Transport Sa|Method for laser guiding of rail bearing plate insertion device for forming railway track, involves calculating position of arm from known position of arm relative to portion and position of portion relative to measurement station| US20110239893A1|2010-04-06|2011-10-06|Doug Delmonico|Railroad tie plate handling machine| DE102019205764A1|2019-04-23|2020-10-29|Robel Bahnbaumaschinen Gmbh|Machining system and method for performing track work| DE102019212186A1|2019-08-14|2021-02-18|Robel Bahnbaumaschinen Gmbh|Machining system and method for performing track work| FR3107880A1|2020-03-04|2021-09-10|Geismar|Method of installing or removing equipment for operating a railway track|
法律状态:
2017-06-21| PLFP| Fee payment|Year of fee payment: 2 | 2018-01-05| PLSC| Search report ready|Effective date: 20180105 | 2018-06-26| PLFP| Fee payment|Year of fee payment: 3 | 2019-06-19| PLFP| Fee payment|Year of fee payment: 4 | 2021-03-12| ST| Notification of lapse|Effective date: 20210206 |
优先权:
[返回顶部]
申请号 | 申请日 | 专利标题 FR1656075A|FR3053367B1|2016-06-29|2016-06-29|RAIL WORKS VEHICLE, WORK TRAIN COMPRISING SUCH A WORK VEHICLE AND METHOD OF MANUFACTURING A RAILWAY| FR1656075|2016-06-29|FR1656075A| FR3053367B1|2016-06-29|2016-06-29|RAIL WORKS VEHICLE, WORK TRAIN COMPRISING SUCH A WORK VEHICLE AND METHOD OF MANUFACTURING A RAILWAY| ES17178487T| ES2712126T3|2016-06-29|2017-06-28|Railway work vehicles and procedure for the manufacture of a railway track| SG10201705314XA| SG10201705314XA|2016-06-29|2017-06-28|Railway construction vehicle, construction train comprising such a construction vehicle and process for building a railway| EP17178487.9A| EP3263768B1|2016-06-29|2017-06-28|Railway construction vehicle and railway construction process| CA2972087A| CA2972087A1|2016-06-29|2017-06-28|Rail work vehicles, work trains including such a work vehicle and fabrication process of a railway| AU2017204414A| AU2017204414A1|2016-06-29|2017-06-28|Railway construction vehicle, construction train comprising such a construction vehicle and process for building a railway| DK17178487.9T| DK3263768T3|2016-06-29|2017-06-28|Railway working vehicle and method of making a railway| PL17178487T| PL3263768T3|2016-06-29|2017-06-28|Railway construction vehicle and railway construction process| 相关专利
Sulfonates, polymers, resist compositions and patterning process
Washing machine
Washing machine
Device for fixture finishing and tension adjusting of membrane
Structure for Equipping Band in a Plane Cathode Ray Tube
Process for preparation of 7 alpha-carboxyl 9, 11-epoxy steroids and intermediates useful therein an
国家/地区
|