专利摘要:
This publication is for a shallow water terminal, preferably for storing, loading or unloading hydrocarbons such as LNG, oil or gas. The basic structure comprises a floating and removable ocean floor infrastructure (10), intended to be supported by an ocean floor (30), the ocean floor infrastructure (10) comprising a base structure (11) preferably provided an upwardly extending wall structure (22) disposed along at least a portion of the periphery of the base structure (11), the base structure (10) preferably also being provided with an opening (23) in the wall structure (22) to allow the floatable module to dock and be supported by the ocean floor infrastructure (10). The base structure (10) is provided with mooring points (24) configured to receive the pre-installed vertical pile ends (14) to at least temporarily support the base structure (11) during a threshing operation for permanent anchoring by stacks from the base structure (10) to the ocean bottom (30). The publication also relates to a method for battery anchoring a base structure on or above an ocean floor (30). 公开号:FR3049567A1 申请号:FR1752638 申请日:2017-03-29 公开日:2017-10-06 发明作者:Andersen Stig Rau;Harald Vartdal 申请人:Sembcorp Marine Integrated Yard Pte Ltd; IPC主号:
专利说明:
Basic structure on an ocean floor and method for installing it Field of the invention The present invention relates to a method for installing a base structure, configured to be supported by the ocean floor, preferably at least partly above a sloping ocean floor. The present invention also relates to a marine base structure, preferably for storing, loading or unloading hydrocarbons such as LNG, oil or gas, including a floatable and removable ocean floor infrastructure, intended to be supported by a bottom the ocean bottom infrastructure comprising a base structure which is preferably provided with an upwardly extending wall structure disposed along at least a portion of the periphery of the base structure, the base structure being also provided with an opening in the wall structure to allow the floatable module to dock and be supported by the seabed infrastructure. Context of the invention Port sites for LNG or large tankers are considered very dangerous. Therefore, it is not advantageous to place these sites in the immediate vicinity of populated areas. At the same time, the largest number of LNG consumers is in densely populated countries. A number of solutions have therefore been suggested, aimed at placing LNG storage facilities at sea. It has previously been proposed to use offshore LNG loading port sites that either float or are resting on the ocean floor. Floating sites share the same problem, namely that the transfer of LNG between ship and storage facility takes place between two floating bodies, moving more or less independently of each other. Dynamics places high demands on equipment and safety if the load is placed side by side. A major problem with liquid storage structures that rely directly on the seabed by gravity (SBG: Gravity Based Structure), particularly in shallow waters, is that a SBG requires large fixed ballast volumes for to guarantee a positive pressure on the ground at all times, - also under extreme conditions, eg. big storm tides. Everyone knows that large storm tides appear mainly in shallow waters near the land, eg. in connection with tropical cyclones, where water levels near the shore may temporarily increase by 8 or 9 meters. This will expose huge SBG with liquid storage, which has a large waterline at sea level and is located near the shore. Additional fixed ballast volumes to offset such temporary pullout efforts will require a significant increase in the SBG's volume and weight to ensure positive bottom pressure at all times, as well as to ensure greater buoyancy during implementation. place by flotation, submersion and installation of SBG on the ocean floor. Such an increase in volume will again result in a further increase in pull-out forces, requiring additional volumes of both sea-ballast and ballast weights, which represents a negative spiral of design effects that will make it very difficult to expensive an SBG solution. It is also known that SBG solutions may not be feasible or at best will be very expensive if used on soft, unconsolidated seafloor soils, as found in river deltas. It is for these reasons that the SBG can be equipped with suction skirts, but the simple vertical height and height of these skirt solutions can represent prohibitively expensive foundation solutions, which to date has made floaters the only viable solution in areas with such soil conditions. To reduce the problems associated with the dynamics of floating bodies during loading operations, it has been proposed to install large steel or concrete structures, rectangular or square, functioning as artificial ports, in which a continuous wall of steel or concrete is intended to provide protection against incoming waves. The proposed water depths are usually 8 to 30 meters. Large constructions of this type are intended to be built away from populated areas and at the same time function as breakwaters for LNG vessels during loading and unloading operations. The problem can be reduced by moving the vessel to the leeward side of port construction, but calculations and basin experiments have shown that port construction, which is a continuous barrier, must be built to a large extent if an effect is to be achieved. significant protection when waves and waves arrive for a certain period at a particularly unfavorable angle. This is due to the well-known effect that the waves of the ocean will bend around both sides of such a construction and a point of convergence will emerge at some distance behind the leeward side, where the inflected waves. At this point of convergence, the wave height may actually be larger than that of incoming waves. A large harbor construction placed on the ocean floor, intended to act as a shield against the waves, will therefore be very expensive. Different forms for such types of LNG port sites, constructed of concrete to protect ships from waves during loading operations, have been suggested. A suggestion of form, for example, is to build the horseshoe construction and allow the LNG carriers to load / unload inside it. This will significantly reduce dynamic constraints, but the port site will be even more expensive than a rectangular port site. GB 1,369,915 describes a port site comprising a number of units which are afloat or cast and apart from that constructed to be placed on the ocean floor. Each unit includes a base, a supporting base structure and moving wave breakers that can be moved if necessary. US 3,958,426 discloses a port site comprising a number of spaced-apart units on the ocean floor, so that at least one mooring location is formed. The units are equipped with tusks and wave damping devices. The Applicant's own publication WO 2006/041 312 relates to a port facility for storing, loading and unloading at sea hydrocarbons such as LNG, all of whose contents are included herein by reference. The port includes three units built of steel or concrete, placed on the ocean floor. The units are arranged sideways in line. The harbor is configured to cushion the waves, and the boat is expected to be parked on the downwind side of the mooring. The Applicant's own publication WO 2013/002 648 relates to a port facility for storing, loading and unloading offshore hydrocarbons, comprising a number of units which are placed relative to one another on the ocean floor in a manner that to establish a port facility. The units are placed independently, at a given distance from each other, in an oblique direction and have a forward surface along which the ship is intended to mate, forming a passage (s) ) for parts of the waves and are configured to dampen part of the incoming waves while allowing other parts of the waves and the current to cross the port facility. Document US 2005/139 595 discloses an LNG storage and loading facility, consisting of an ocean floor structure resting on an ocean floor, the ocean floor structure having a base plate resting on the ocean floor and three walls. extending to the top. The ocean floor structure has an opening, which allows a float module to be maneuvered into position within the seafloor structure and ballasted so that it rests on the base slab. Document FR 2 894 646 describes a structure based on gravity resting on the ocean floor because of its own weight and equipped with skirts protruding downwards and open, driven into the ocean floor. The gravity-based structure is U-shaped, with vertical walls extending upwards from a submerged bottom slab, equipped with a floatation tank operating as a weight to provide the required weight. A gravity-based structure embodiment may also be provided with stacks that extend downward through the vertical walls and penetrate the bearing terrain, with the stacks ending at the top of the walls above the level of the sea. However, these port facilities for storage can be large, complex and expensive. Their construction is time consuming and they have limited variation in mobility and other applications. Since they are dependent on deep skirts to implement a foundation, problems can also be encountered during installation, especially in shallow waters with a muddy or loose seabed. In addition, the density, composition, consolidation and topography of seabed soils can vary considerably from one location in the ocean floor to another. For example, the soil in river mouths will often be dominated by soft, muddy, yoghurt-like soils, while other seafloor areas may be influenced or partially covered by hard sandstone, limestone or sandstone. an old volcanic rock. This will have a direct impact on the carrying capacity of the seafloor soil, and therefore on the possibility of finding a predictable and reliable foundation solution for an ocean floor structure that will rest on the ocean floor. Thus, there is a need for cost-effective, versatile, and flexible port installation systems that can be installed in shallow waters and are suitable for installation in areas having a low lift seabed. In addition, there is a demand for an offshore facility that can be standardized as much as possible for manufacturing and cost reasons and that can be easily deployed offshore or near shore locations with any type of soil. seabed. There is also a need for a method to ensure proper and proper battery anchoring of such a port facility, avoiding any relative movement between the rig and the seabed during threshing operations. Summary of the invention The principle used according to the present invention is to use a battery-based basic structure where the majority of the weight of the basic structure and perhaps also a floating module, at dock in the basic structure and supported by it , are supported by piles extending to a sufficient depth in the seabed soil to withstand all loads, weights and forces directed downward, upward or sideways and acting on the base structure. In this respect, either the basic structure may rest on the ocean floor with at least part of its footprint or the base structure may be placed at a distance above the seabed soil, i.e. . without actually being in contact with the sea floor, all loads, weights and forces being collected by the batteries. In addition, the system and method according to the present invention are based on the principle that a temporary battery arrangement is used to support the basic structure during the installation phase, said temporary battery arrangement accommodating all the loads, weights and forces during the threshing operation until a permanent battery arrangement is created and the basic structure is permanently supported by the battered permanent piles in the ocean floor, so that the battery-anchored structure is able to withstand all load criteria, such as a centennial storm or swell. It should be realized that the temporary stacks installed may or may not be removed or cut once the installation of the infrastructure has been completed. If the batteries used as temporary support are to be removed, they should preferably be cut to a depth at which the cut-out batteries do not constitute a danger to the operation of the basic structure and the floating module and / or the ships to be flown. berthing and supporting the ocean-bottom infrastructure. An object of the present invention is to provide a solution increasing the weather window to install such a basic structure and also to make the installation more independent of weather and sea conditions. Another object of the present invention is to allow a more expeditious installation process by allowing a simultaneous threshing operation of more than one stack at a time. An object of the present invention is to provide a method of installing a basic structure intended to be supported by the ocean floor by means of a number of stacks, wherein during the installation of the stacks of support and until 'to obtain a correct fixation of the permanent piles at the port facility, the permanent piles are not affected by forces, loads or weights caused by the base or acting on it, even if the threshing operation is carried out on the basic structure and from there. Another object of the present invention is to provide an ocean bottom terminal designed in such a way that the terminal does not require the use of open skirts protruding downward to ensure a stable foundation on an ocean floor site, without talk about the need for a bottom surface of the ocean floor infrastructure to be partially or completely in contact with the ocean floor. In fact, the structure on an ocean floor can be supported completely by the batteries used and rest on them. Another object of the present invention is to provide a multi-purpose shallow water-bottom terminal having storage units and a method for creating such a terminal on an ocean floor. Yet another object of the invention is to propose a terminal on an ocean floor which is designed to transfer very heavy vertical loads on the seabed floor, caused by very large weights of liquids stored inside the storage module. without allowing any relative movement between the terminal and the support structure nor any relative movement between the ocean floor and the terminal. A further object of the present invention is to provide a shallow water bottom terminal that is flexible, cost effective and easy to build in most types of seabed soil conditions. Another object of the invention is to provide a storage system near the shore which can, when necessary, be also implanted on extremely soft and muddy ground as found in river deltas or on bottom areas. ocean floor with unconsolidated soil, where gravity-based structures can not be installed or would be prohibitively expensive. A further object of the invention is that it can be given the structural ability to withstand large buoyancy stresses due to buoyancy during extreme storm swells, without any major volumetric modification of its loading support structure. . Yet another object of the invention is to allow the construction of each of the seabed terminal units at a reasonable and efficient and as complete as possible cost on a traditional construction site, preferably in a shipbuilding workshop using a dry dock. As a result, the expensive finishing work at sea will be reduced to a minimum. After the final equipment at the construction site, each unit is brought or towed to the location of the installation, to be finally descended using known techniques. It is also an object of the invention to ensure the safe transfer into the ocean floor of heavy vertical loads, produced by the storage of large volumes of liquids above sea level. object of the present invention to provide an ocean floor terminal including an ocean floor infrastructure and a storage module specifically adapted to adapt to each other and to simplify the docking of the storage module in an efficient manner. time and cost. It is also an object of the present invention to provide a quick and safe installation of the storage module using dead-work equipment. The objects of the present invention are obtained by a terminal on a shallow ocean floor and a method for building such a terminal on an ocean floor as defined hereinafter by the independent claims. Embodiments, alternatives and variants of the invention are defined by the subordinate claims. The wall structure may be an integral part of the base structure, constituting an ocean floor infrastructure unit and may be provided with ballast means. At least some parts of the wall structure extend above the surface of the water. The present invention relates to a shallow water base structure, for example for storing, loading or unloading hydrocarbons, such as LNG, oil or gas, including a floatable and removable ocean floor infrastructure, intended to be supported. an ocean floor, the seabed infrastructure comprising a base structure provided with an upwardly extending wall structure disposed along at least a portion of the periphery of the base structure, the structure The base is preferably also provided with an opening in the wall structure to allow the floatable module to dock and be supported by the seabed infrastructure. The basic structure is provided with docking points configured to receive the pre-installed vertical pile ends to at least temporarily support the base structure during a threshing operation for permanent pile anchoring of the base structure to the ocean floor. According to one embodiment the mooring points extend laterally outwardly from the base structure and are preferably placed above sea level. The mooring points may be located on the underside of beams, overhangs, sleeves or conduits extending laterally from the wall (s), preferably above sea level. In addition, the docking points can be equipped with unlockable locking devices to temporarily lock the top of a preinstalled battery in a fixed position. According to one embodiment the wall structure may be an integral part of the base structure and the mooring point constitutes an integral part of the base structure or the wall structure. The mooring points may alternatively be placed below sea level, either on the side walls or on the bottom surface of the base structure. In the latter case, the batteries may constitute a permanent part of the battery anchoring system. The present invention also relates to a method for installing the base structure, the basic structure being configured to be supported by the ocean floor by threshing by means of a number of stacks sunk into the ocean floor. In order to install the basic structure, at least two rows of stacks, each row comprising at least two stacks, are sunk into the sea floor, the distance between the two rows and the distance between two adjacent stacks in each row. being configured to correspond with specifically constructed mooring points on the base structure, after which the basic structure is towed between the two rows of stacks and brought to a position where the mooring points are vertically aligned with an upper end corresponding stack, after which the base structure is weighted so that it rests stably on the various piles, after which the basic structure is anchored by piles to the ocean floor. The basic structure is anchored by piles to the ocean floor by means of a number of piles embedded in the ocean floor, the top of the piles being secured to the base structure. In addition, the piles supporting the base structure in a stable and rigid manner during the threshing operation can be removed once the permanent battery anchoring process of the basic structure is completed. According to one embodiment, the temporary or temporary stacks can be cut at the seafloor. An essential feature of the present invention is that the base structure is provided with at least one beam or slab extending laterally outwardly from the top of the vertical wall structure above the level of the wall. the sea, at least along two opposite sides, possibly also along a third side of the base structure, configured to support the base structure in a sufficiently stable position until the base structure is anchored by ocean bottom piles by means of a permanent arrangement of permanent piles. According to the invention, at least one removable ocean floor infrastructure stably supported by piles penetrating the ocean floor is used, so that a stable harbor foundation is formed. The ocean floor infrastructure includes a basic structure equipped with flotation devices and an upwardly extending wall structure, also equipped with flotation devices. The wall structure is disposed along at least a portion of the periphery of the base structure and includes at least one opening in the wall structure for introducing a floatable storage module. The floatable module is removably disposed on the base structure within the wall structure and together they constitute an offshore unit supported by the ocean floor at least by means of battery anchoring. According to a preferred embodiment of the invention, the wall structure of the base is an integral part of the basic structure constituting an infrastructure unit in seawater. In addition, the cantilever, the beam or the slab disposed at the top of the side walls is an integral part of the wall structure and is designed and dimensioned to withstand all temporary loads, forces and moments that occur during the threshing process. For this purpose, the cantilever, beam or slab may be equipped with mooring points to work together with specially installed and temporary batteries. It should be realized that the basic structure can be equipped with ballast tanks, using water to adjust weight and buoyancy and the vertical forces and exposures to loads acting on the temporary piles during the installation of the structure. based. The wall structure of the seabed infrastructure is above sea level (but the wall structure may also be below sea level). Some of the advantages of having some of the ocean floor infrastructure over water, as shown in the drawings, are: a) The water feature facilitates and reduces uncertainty around stability during installation of the infrastructure on the ocean floor. b) The part of the ocean floor structure will facilitate and simplify floating entry and installation of the storage module. c) Threshing machines can be placed on seabed infrastructure above the water level, which reduces costs and delays. d) Seabed infrastructure above the water level will provide additional protection against vessel collisions. e) Some equipment, eg. the cargo loading arms, can in some cases be installed on the ocean floor infrastructure and therefore a little away from the storage module. f) A major advantage of the invention is that the infrastructure stacks can also be designed for the voltages to absorb pullout forces due to buoyancy. This feature will facilitate installation in extremely loose soils, such as river deltas, where the soil has limited vertical holding capacity, downward. In addition, because of the configuration of the floor slab used, which covers more or less all the bulk of the basic structure, a large degree of freedom is achieved with regard to the total number of available batteries. to use feasibly, the distances between neighboring batteries and the positions of said number of batteries. This may be particularly important in areas with poor or loose soil conditions and / or where extreme environmental loads and shocks may occur, such as large waves and storm swells. By using a quay side that has a beam or slab projecting outward, it is possible to dock a boat a certain distance from the vertical wall and improve the maneuvering and mooring of the boat along on the dock side. In addition this feature of the battery anchored foundation is also very useful when the storage system according to the invention is installed in shallow areas exposed to cyclones and storm swells, where water levels in extreme cases centennial can rise up to 8 or 9 meters above normal sea level. For such cases, foundation piles can be designed to accommodate a large part of the buoyancy stresses, while other parts of these extreme, temporary stripping efforts can be neutralized by an active water ballasting of the storage module. In order to have an efficient transfer of large vertical structural forces, it is also an advantage that the main structural beams of the basic structure and the storage module have mirror structural interfaces. This means that the vertical forces from the partitions of the storage module are preferably transferred directly into the main structural beams of the basic structure. Another important advantage of using the batteries according to the present invention is that the batteries can handle both voltage and compression, and at the same time efficiently and cost-effectively allow the cell lengths to vary in size. The number, position and size of the ducts or sleeves may be configured such that additional unused ducts or sleeves are available in case additional pile anchoring is required at a later stage. The ocean bottom unit of the seabed terminal may be designed to accept, without any movement of the terminal on the ocean floor, very large vertical loads on the seabed from the large masses of liquid stored inside the storage module. typically up to, but not limited to, 150,000 deadweight tonnes, which is the capacity of a large tanker. Part of this capacity can be obtained by increasing the height of the storage volume while maintaining the horizontal size of the terminal on the ocean floor. Another advantage is that the seabed infrastructure according to the present invention does not necessarily have to rest on the seabed, the weights, forces and loads being carried by the piles. In addition, seabed infrastructure is not dependent on the use of skirts to withstand tension, ie. the lifting of the structure caused for example by a storm swell. Thus, the underside of the base structure does not need to have any bearing contact with the seabed soil and the variable, operational and environmental loads of the marine terminal are collected by the piles. Due to the shear force between the pile surfaces and the corresponding wall surface of the grouted conduits or sleeves, a sufficient load-bearing capacity and lift can be achieved depending on the carrying capacity. Thanks to the cement grout in the ring formed between the outer surface of the stack and the surface of the conduits or sleeves, the shear strength required to withstand the shear forces produced and acting in this joint is obtained. Because the basic structure is in position above the seabed, the environmental effect of the basic structure on seabed marine life is eliminated or substantially reduced. Brief description of the drawings One embodiment of the method according to the invention will be described in more detail in the description below, which will be referenced to the attached figures, in which: FIG. 1 schematically represents a first step of the installation procedure, in which which constitutes two rows of batteries aligned and spaced from each other; Figure 2 schematically shows a basic structure to be supported by the stacks and is towed in position by a tug between the two aligned rows spaced from stacks; Figure 3 schematically shows in perspective seen from below an embodiment of a basic structure according to the present invention; Figure 4 schematically shows in perspective an embodiment of the basic structure set up and supported by the batteries in position aligned on at least two sides of the base structure; Figure 5 shows schematically and in perspective the basic structure in position with a supply vessel moored along one side of the installed base structure; and Figure 6 shows schematically a positional variant of the mooring points. DETAILED DESCRIPTION OF EMBODIMENTS OF THE INVENTION The following description of the exemplary embodiment refers to the accompanying drawings. The same reference numbers in different drawings denote identical or similar elements. The detailed description which follows does not limit the invention. Instead, the scope of the invention is defined by the appended claims. The following embodiments, in order to remain simple, are discussed with respect to a method for installing a base structure on an ocean floor in general and preferably, but not necessarily, on a sloping ocean floor and / or on an ocean floor with a low bearing capacity. The reference throughout the description to "an embodiment" means that a particular function, structure, or feature described in connection with an embodiment is included in at least one embodiment of the described material. Thus, occurrences of the term "in one embodiment" in various places throughout the description are not necessarily all of the same embodiment. The heart of the invention is to propose a quick and safe installation of the storage module using deadwork equipment where the basic structure is supported stably and rigidly during the operation of threshing of the permanent piles. This is the expensive part (90-95%) of the entire installation. If you have a pre-installed base foundation, which is stabilized at least with batteries and leveled in advance of the ocean floor, then the storage module can be installed in a few hours. In addition, the present invention offers the possibility of establishing a terminal on an ocean floor on different soil conditions. The density, composition, consolidation and topography of seafloor soils can vary considerably from one location in the ocean floor to another. This will have a direct impact on the carrying capacity of the seafloor soil, and therefore on the possibility of finding a predictable and reliable foundation solution for an ocean floor structure that will be supported by the ocean floor. According to one embodiment, the base foundation may be in the form of a semi-submersible floating body anchored by piles to the ocean floor. In this case, the basic infrastructure can be ballasted as a semi-submersible structure and anchored by piles to the ocean floor via the base structure and possibly, but not necessarily, the wall structure of the infrastructure on the ocean floor. Since it is important in these cases to have an efficient transfer of vertical structural forces, it is an advantage that the main structural beams of the basic structure and the storage module have mirror structural interfaces. This means that the vertical forces from the partitions of the storage module are preferably transferred directly to the main structural beams of the base structure, to the pile structure and to the ocean floor. Tests have shown that the battery-anchored ocean floor infrastructure must tolerate and support a weight of 100,000 to 120,000 tonnes. FIG. 1 schematically represents a first step of the installation procedure, in which two rows 13, 13 'of aligned piles 14 are put in place, the last stack in row 13 being being pressed into the ocean floor. 30 by means of a threshing barge having a crane 16 and a device 17 for driving the piles suspended on the crane 16. During this step, the barge 15 can be moored by means of conventional sea-bottom anchors 30 (no shown) and anchor lines 18 (two of which are shown). 2 schematically shows a basic structure 10 being towed in position between the two rows 13, 13 'of spaced aligned stacks which must support it by a tug 19 and a pair of trailers 20. The base structure 10 is provided a cantilever 21, 21 'protruding outwardly from the top of the base structure along two parallel upper sides, each cantilever 21, 21' being configured to rest on a row 13, 13 'corresponding batteries 14. For this purpose the cantilevers 21, 21' are equipped with mooring points 24 (not shown in Figure 2) sized and configured to support the weight of the structure of base 10 and any bending loads, forces and moments occurring temporarily at least during the installation phase of the base structure 10 until the base structure is securely anchored by piles to the ocean floor. The ocean bottom base structure 10 comprises an inwardly projecting cantilever and / or beam structure 11 and upwardly extending wall structures 22 disposed along at least a portion of the of the periphery of the base structure 10. The wall structure 22 is an integral part of the cantilever and / or beam structure 11 and together they constitute a base structure 10 on an ocean floor. Both the cantilever and / or beam structure 11 and the wall structure 22 are equipped with flotation devices (not shown). Such buoyancy means may be in the form of reservoirs and compartments in the cantilever and / or beam structure 11 and in the upwardly extending wall structure 22. The embodiment of the ocean floor infrastructure 10 shown in FIG. 1 is provided with a lower longitudinal and transverse beam structure, which constitutes upwardly open compartments in the base structure 10 between the doorways. The compartments may be closed at their lower end by a lower slab or the compartments may optionally be open downwards and provide access to the permanent piles (not shown) in the case where the basic structure 10 is in an elevated position more or less above the ocean floor 30. Said longitudinal or transverse beams or walls can serve as support surface and reinforcement for a storage module that can float to float between the wall structure 22 extending upwardly above the base structure 10, and ballasting so that it rests on said surface. The upwardly extending wall 22 extends along three sides of the base structure 10 and is provided with an opening 23 in the wall structure for introducing a floatable storage module (not shown in FIG. 2) in and above the base structure 10. The storage module can be removably disposed on the base structure 10, the internal overhang 11 and possibly the beams within the wall structure , which together constitute a unit on an ocean floor. The ocean bottom base structure 10 is provided with floating buoyancy and includes ballasting means (not shown) and is intended to be placed on or just above the ocean floor 30, supported by a number of permanent piles. (Not shown in Figure 2) or, possibly, also based on the ocean floor partly due to gravity, fixed by means of said permanent piles. The wall structure 22 extending upwards from the infrastructure 10 has perforations or conduits / sleeves passing therethrough for optional and / or additional battery anchoring and there are also perforations in the structure of the structure. base 11 to receive the permanent piles, intended to be driven into the seabed soil. The conduits and accessories for receiving the batteries are described in PCT / NO 2015/050156, which is hereby incorporated by reference and will not be described in more detail. A ship 16 having machines and threshing tools, similar to that described in Figure 1, is docked next to the wall structure 2 and can be used for threshing operations. As shown in the Figure, the permanent piles can be disposed both longitudinally and transversely along the foot of the three walls 22, along the front submerged beam, under the opening of the door-to-door structure. false and / or beam 11 and along the cantilever 11 and / or walls or beams forming between them open compartments upwards. In this way the totality of the space requirement or at least some parts of the space can be provided with permanent piles to correctly and surely support the basic structure 10. The number of batteries used and their position, their diameter and their length depend on weight to support and the condition of the sea floor. An advantage according to the present invention is that the base structure 10 on an ocean floor, which constitutes a part of the seabed unit for floating modules, such as a floatable LNG storage unit or a barge according to the invention. can be lowered to be installed offshore or near shore, removed, relocated and replaced using known techniques to form new individual configurations as needed. Figure 3 schematically shows in perspective seen from below an embodiment of a basic structure 10 according to the present invention. As shown, the lower side of the cantilevers 21, 21 'is provided with mooring points 24 configured, designed and dimensioned to receive the upper ends of the temporary stacks 14, which support the basic structure at least until a sufficient number of permanent piles are battered through the conduits 25 in the inwardly extending cantilever and / or the beams 11 and fixed to said pieces. As shown in FIG. 3, the upwardly protruding walls 22 are interconnected by the beams 26 constituting the upwardly open cells 27 without an upper or lower slab, configured with the cantilevers 11 to support a floating unit. , configured to be unballatted and resting on said parts of the base structure 10. Along the outer edge of the outboard outboard overhanging upper devices 28 and serving as tusks may be arranged to protect the cantilever of the side of a ship to moor along the side of the structure basic. Figure 4 schematically shows in perspective an embodiment of the base structure 10 set up and supported by the temporary stacks 14 in an aligned position along at least both sides of the base structure 10. It is now possible to install the permanent piles by forcing them through the ducts 25 and pushing them into the ocean floor 30 to a depth sufficient to temporarily support the base structure stably. The base structure 10 may be permanently attached to the ocean floor 30 by said permanent piles, while the base structure 10 is stably fixed in position and supported by means of the temporary stack rows 14. As shown in FIG. 6, which schematically represents an alternative position of the mooring points 24, the mooring point is manufactured as an integral part of the vertical wall 22, projecting laterally outwardly of the wall 22, and may be set up either above or below level 29 of the sea. Figure 5 shows schematically and in perspective the base structure 10 in position with a supply vessel 30 moored along one side of the installed base structure 10. The Figure represents a stage where the basic structure rests firmly on the temporary stacks 14 by its own weight and possibly any additional weight arising from any ballast water, the weight being sufficiently higher than the buoyancy of the base structure. At this stage, the process of creating the permanent battery anchoring system, as further described in PCT / 2015/050 156, can begin, which publication is included for reference with respect to preparation of the permanent battery anchoring arrangement and the method for creating proper pile anchoring of the base structure. As shown in FIG. 5, the piling operations of the permanent piles can be carried out more or less simultaneously by means of a threshing barge, similar to that shown in FIG. 1, and by mobile cranes 31 provided with the devices associated threshing means, for example similar to that shown in FIG. After the completion of the threshing operation of the two parallel rows 13, 13 'of temporary piles 14, a base structure 10 is towed in position between the two rows 13, 13' by means of a tug 19 to the mooring points 24 along the lower surface of the outwardly projecting overhangs 21, 21 'are aligned with the corresponding temporary stacks 14, after which the weighting structure is base 10 so that the base structure 10 descends on a respective pile 14 and exerts a force acting downwards or a weight on the piles 14, the piles housing more or less the entire vertical weight of the basic structure 10. Each mooring point may have a recess sufficiently deep to allow to introduce the upper part of the stack end into said recess. The mooring points may also be equipped with an unlockable locking mechanism to temporarily block the joint between the upper end of the stack 14 and the mooring point 24. Once the basic structure is sufficiently secured and fixed in a correct position, the permanent battery anchoring operation can be initiated, for example in full accordance with the method, system and arrangement described in the document. PCT / NO 2015/050 156. Once the permanent battery anchoring operation has been completed, the temporary piles may be cut off at the seafloor or at a depth at which the pile ends do not represent a hazard to the operation of the pile. of the anchored base structure 10. The base structure 10 is equipped with a system (not shown) for ballasting and is preferably made of steel, although other materials may also be used, such as concrete. It should be realized that the storage module 10 according to the present invention can also be provided with means such as loading systems, cranes, winches, etc. at the top of the storage module. When the storage module arrives on site, it is coupled to the ocean floor infrastructure or the base structure 10. During this coupling operation, the floating module is operated to enter through the opening at one end. of the base structure and between the two side wall structures 22 extending parallel upwards. The floating storage module is guided on the base structure 10, inside the wall structure 22. The floating module is then weighted so that it rests stably on the basis of the infrastructure 10 on the bottom oceanic, constituting an assembled unit on an ocean floor. The permanent arrangement of pipes for ballasting and for securing the batteries to the base structure 10 may be of the type described in PCT / NO 2015/050 156, the part of said application relating to the battery system being by the present incorporated by reference. Once a permanent pile is depressed to the expected depth in the seabed soil, the ring can be cemented between the outer surface of the pile and the surface of the pipe by injecting cement slurry from a production of cement slurry (not shown) by a cement grout feed pipe. Said cement grout feed pipe may have its outlet at the lower end of the pipe. Due to such an exit position, the grout injected from the supply line will be pushed upwardly through the ring until the injected grout exits at the top of the duct. In order to prevent the grout from forcibly descending out of the ring into the interface between the bottom surface of the bottom plate of the base structure and the seafloor 30, a sealing gasket is provided. ring which has a contact surface against the outer surface of the stack over its entire circumference. The closure seal may be in the form of a circular pipe having a cylindrical cross-section, or a semicircular body, the two free ends of the semicircular body being attached to the surface of the duct sealing, s extending around the entire circumference of the conduit and providing a seal. The inner void of the seal is in fluid communication with a pressurized source (not shown) by a fluid supply line, which provides a pressurized fluid supply within the seal at the start of the liquid mortar casting process. , causing the closure seal to expand, and possibly releasing fluid pressure upon completion of the casting process. According to one embodiment of the invention, sixty-one permanent piles having a diameter of 2.2 m and a length of 50 m are required in order to withstand the maximum permissible environmental loads. These piles are inclined at an angle of 5 ° to the vertical to reduce the ground effect. In this context, it should be realized that where the piles supporting the basic structure are placed close to each other a simple and conservative approach may be to reduce the oiling capacity to about 2/3 of the capacity of an individual battery, when we consider the cases of charges. It should be realized that the piles can descend vertically into the ocean floor 30, that they can be arranged inclined relative to the vertical, either in the same direction, inwardly or outwardly, or a combination of two. Ocean-bottom infrastructure can also have a port section, configured to allow ships to moor along the port section. The building material may be concrete or steel or a combination of both. The harbor section is attached to and constructed within at least one of the vertically extending walls, so that all forces and loads are collected by the seabed infrastructure and transferred to the piers. In addition, the port section may preferably be disposed on the opposite side (s) to the prevailing wind and / or wave direction, providing shelter for the moored vessel (s) ( s) along the harbor section.
权利要求:
Claims (11) [1" id="c-fr-0001] claims A basic structure (10) in shallow water, preferably for storing, loading or unloading hydrocarbons such as LNG, oil or gas, including a floating and removable ocean floor infrastructure (10), intended to be supported by an ocean floor (30), the ocean floor infrastructure (10) comprising a base structure (11) preferably provided with an upwardly extending wall structure (22) disposed along an least part of the periphery of the base structure (11), the base structure (10) preferably also having an opening (23) in the wall structure (22) to allow the floating module to docking and being supported by the ocean floor infrastructure (10), characterized in that the base structure (10) is provided with mooring points (24) configured to receive the ends of vertical stacks (14) pre-installed for support at least temporarily the struct base (11) during a threshing operation for permanent battery anchoring of the base structure (10) to the ocean floor (30). [2" id="c-fr-0002] The shallow water base structure (10) according to claim 1, wherein the mooring points (24) extend laterally outwardly of the base structure (10) and are preferably positioned above the level (29) of the sea. [3" id="c-fr-0003] An ocean bottom base structure (10) according to claim 1 or 2, wherein the mooring points (24) are arranged on the underside of beams, overhangs, sleeves or laterally extending conduits. from the wall (s) (22), preferably above the level (29) of the sea. [4" id="c-fr-0004] The base structure (10) on an ocean floor according to any one of claims 1 to 3, wherein the mooring points (24) are provided with unlockable locking devices for temporarily locking the upper part of a stack ( 14) preinstalled in a fixed position. [5" id="c-fr-0005] The base structure (10) on an ocean floor according to any one of claims 1 to 4, wherein the wall structure (22) is an integral part of the base structure (10) and the mooring points constitute a integral part of the base structure (10) or the wall structure (22). [6" id="c-fr-0006] The base structure (10) on an ocean floor according to any one of claims 1 to 5, wherein the mooring points (24) are placed below the level (29) of the sea. [7" id="c-fr-0007] A method of installing a base structure (10) on an ocean floor (30), the base structure being configured to be supported by the seabed (30) by threshing using a number of stacks embedded in the ocean floor (30), characterized in that at least two rows of stacks (14) are sunk into the ocean floor (30), the distance between the two rows (13, 13 ') and the distance between two stacks (14). ) adjacent in each of the rows (13, 13 ') being configured to correspond with mooring points (24) constructed especially on the base structure, after which the base structure (10) is towed between the two rows (13). , 13 ') of batteries and brought to a position where the docking points (24) are vertically aligned with a corresponding upper battery end, after which the base structure (10) is weighted so that the basic structure ( 10) rests stably on the various piles ( 14), after which the base structure (10) is anchored by piles to the ocean floor (30). [8" id="c-fr-0008] The method of claim 7, wherein the base structure (10) is anchored by piles to the ocean floor (30) by means of a number of permanent piles sunk into the ocean floor (30), the top of the piles. being rigidly attached to the base structure (10). [9" id="c-fr-0009] The method according to claim 7 or 8, wherein the stacks (14) supporting the base structure (10) in a stable and rigid manner during the threshing operation are removed after completion of the permanent anchoring process by stacks of the basic structure (10). [10" id="c-fr-0010] The method of claim 9, wherein the temporary or temporary stacks (14) are cut at the seafloor. [11" id="c-fr-0011] The method of any one of claims 7 to 10, wherein the base structure (10) is equipped with ballast tanks, using water to adjust weight and buoyancy and the vertical forces and load exposures acting on the temporary cells (14) during the installation of the basic structure (10).
类似技术:
公开号 | 公开日 | 专利标题 FR3049567A1|2017-10-06| FR3051823A1|2017-12-01| EP2441893B1|2014-04-23|Support device for a wind turbine for producing electric power at sea, corresponding facility for producing electric power at sea. EP2454149B1|2014-07-09|Catamaran ship used for assembling, transporting and installing a marine wind turbine on the seafloor JP6550128B2|2019-07-24|Submarine terminal for maritime activities WO2003097990A1|2003-11-27|Riser system connecting two fixed underwater installations to a floating surface unit FR2631355A1|1989-11-17|PROTECTION DEVICE FOR SEA WORKS AND METHOD FOR IMPLEMENTING SAID DEVICE FR3080357A1|2019-10-25|METHOD AND DEVICE FOR MAINTENANCE OF A FLOATING PLATFORM EP1957717B1|2011-07-13|Harbour structure and method for building said structure KR102309460B1|2021-10-06|Port Plants and Methods for Mooring Floating Bodies in Port Plants WO2016132056A1|2016-08-25|Lattice-tower-type structure for supporting and anchoring an offshore wind turbine, and method for towing and installing same in the sea EP3259404B1|2018-12-05|Gravity-base-type structure for supporting and anchoring an offshore wind turbine, and method for towing and installing same in the sea TW201945622A|2019-12-01|Harbour plant and method for mooring a floating body in a harbour plant
同族专利:
公开号 | 公开日 AU2017243983A1|2018-10-25| CN108884647A|2018-11-23| JP6837491B2|2021-03-03| CN108884647B|2020-11-03| CA3011203A1|2017-10-05| WO2017168381A1|2017-10-05| NO20160518A1|2017-10-02| EP3436640B1|2020-03-11| UY37186A|2017-11-30| AR108070A1|2018-07-11| RU2719645C1|2020-04-21| US10919606B2|2021-02-16| KR102252117B1|2021-05-14| BR112018069909A2|2019-02-05| US20200298945A1|2020-09-24| PH12018502071A1|2019-07-01| JP2019511656A|2019-04-25| AU2017243983B2|2020-12-24| KR20180124108A|2018-11-20| FR3049567B1|2019-12-20| ES2785674T3|2020-10-07| NO343178B1|2018-11-26| HRP20200869T1|2020-09-04| PL3436640T3|2020-08-24| SG11201807600WA|2018-10-30| EP3436640A1|2019-02-06|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题 US3081600A|1955-11-08|1963-03-19|Merritt Chapman & Scott Corp|Submergible barge structure for off-shore operations| SE354630B|1968-05-17|1973-03-19|Hydro Betong Ab| US3499292A|1968-12-20|1970-03-10|Marine Space Enclosures|Method of making partially submerged structures| NO126927B|1971-02-09|1973-04-09|Hoeyer Ellefsen As| NO131179C|1971-03-02|1975-04-16|Sigurd Heien| US3710582A|1971-05-17|1973-01-16|R Hills|Unique subsea storage vessel and unique method of lowering same| FR2386648B1|1977-04-06|1980-01-04|Sogreah| JPS613925B2|1982-01-23|1986-02-05|Toshinobu Masuda| JPS60126514U|1984-02-02|1985-08-26| SU1664968A1|1989-01-03|1991-07-23|Всесоюзный проектно-изыскательский и научно-исследовательский институт "Гидропроект" им.С.Я.Жука|Method for erecting buoyant structure| CA2089509A1|1993-02-15|1994-08-16|William A. Scott|Ice crush resistant caisson for arctic offshore oil well drilling| JPH0930487A|1995-07-20|1997-02-04|Satoru Morita|Artificial island having half-floating structure| JP3145641B2|1996-09-20|2001-03-12|三菱重工業株式会社|Jacket structure| US6203248B1|2000-02-03|2001-03-20|Atwood Oceanics, Inc.|Sliding-resistant bottom-founded offshore structures| JP2002121753A|2000-10-12|2002-04-26|Kajima Corp|Floating construction method for pier| FR2862272B1|2003-11-17|2007-01-26|Doris Engineering|PROCESS FOR CONSTRUCTING TERMINAL FOR LIQUIFIED NATURAL GAS OR LIQUIFIED PETROLEUM GAS| NO20044371D0|2004-10-14|2004-10-14|Lund Mohr & Giaever Enger Mari|Port facility for liquefied natural gas| FR2894646B1|2005-12-14|2008-02-29|Doris Engineering|TERMINAL FOR LIQUEFIED NATURAL GAS OR LIQUEFIED PETROLEUM GAS, AND METHOD FOR CONSTRUCTING SUCH TERMINAL| WO2009131543A1|2008-04-25|2009-10-29|National University Of Singapore|Offshore fuel storage facility| US8297885B2|2008-04-30|2012-10-30|Technion Research And Development Foundation Ltd.|Method of erecting a building structure in a water basin| AT536304T|2008-12-18|2011-12-15|Openhydro Ip Ltd|SUPPORT SYSTEM FOR A HYDROELECTRIC TURBINE| KR20100136766A|2009-06-19|2010-12-29|한국해사기술|Self propelled offshore cargo handling system| CN101591915B|2009-06-25|2014-12-17|丁慈鑫|Outer support system for supporting caisson structure and construction method thereof| KR101213262B1|2010-06-15|2012-12-18|현대건설주식회사|Pier structure and method for constructing pier structure| CN106400737B|2011-06-30|2019-10-01|格拉夫漂浮股份公司|For storing and unloading the facility of oil gas| CN203475911U|2012-09-29|2014-03-12|吴植融|Maritime liquid repository| CN103590415A|2013-11-26|2014-02-19|中铁大桥勘测设计院集团有限公司|Prefabricated bearing platform suitable for large-diameter tubular column foundation of sea bridge and construction method thereof|NO341401B1|2016-05-26|2017-10-30|Sembcorp Marine Integrated Yard Pte Ltd|Sea bed terminal for drilling| AR109872A1|2016-10-27|2019-01-30|Gravifloat As|PORT PLANT AND METHOD TO FUND A FLOATING BODY ON A PORT PLANT| WO2019183575A1|2018-03-22|2019-09-26|Energie Propre Prodigy Ltee / Prodigy Clean Energy Ltd.|Systems and methods for rapid establishment of offshore nuclear power platforms| WO2020041285A2|2018-08-21|2020-02-27|Energie Propre Prodigy Ltee / Prodigy Clean Energy Ltd.|Systems and methods for deploying coastal underwater power generating stations, and systems and methods for fuel handling in an offshore manufactured nuclear platform, and systems and methods for defense of a prefabricated nuclear plant|
法律状态:
2017-10-06| EXTE| Extension to a french territory|Extension state: PF | 2018-03-18| PLFP| Fee payment|Year of fee payment: 2 | 2019-03-16| PLFP| Fee payment|Year of fee payment: 3 | 2020-03-15| PLFP| Fee payment|Year of fee payment: 4 | 2021-03-10| PLFP| Fee payment|Year of fee payment: 5 | 2022-02-21| PLFP| Fee payment|Year of fee payment: 6 |
优先权:
[返回顶部]
申请号 | 申请日 | 专利标题 NO20160518|2016-04-01| NO20160518A|NO343178B1|2016-04-01|2016-04-01|Seabed base structure and method for installation of same| 相关专利
Sulfonates, polymers, resist compositions and patterning process
Washing machine
Washing machine
Device for fixture finishing and tension adjusting of membrane
Structure for Equipping Band in a Plane Cathode Ray Tube
Process for preparation of 7 alpha-carboxyl 9, 11-epoxy steroids and intermediates useful therein an
国家/地区
|