专利摘要:
The present invention relates in particular to a method of mechanically digging a branch (6) of communication between two tunnels (1, 2) of circulation or between two vertical wells, characterized in that it comprises a series of steps according to which: i / driving, from a first (1; 2) of said two tunnels (1, 2) or well, towards said second tunnel (2; 1) or well, a first section (6a) of metal tube equipped with a cutting kit, the internal diameter of this tube being equal to the internal diameter of said communication branch (6); ii / it is put in place, behind said first section (6a) of tube and in its extension, a second section (6b) of the same diameter, we drive together these two sections (6a, 6b); iii / if necessary, repeat operation ii /; said tube sections (6a, 6b, 6c) being left in place and the materials contained in the tube being removed later.
公开号:FR3025829A1
申请号:FR1458627
申请日:2014-09-15
公开日:2016-03-18
发明作者:Thomas Silvestre;Jean-Noel Derycke;Dominique Michel
申请人:Bouygues Travaux Publics SAS;
IPC主号:
专利说明:

[0001] 1 Method and installation of mechanized digging of a communication branch between two traffic tunnels or between two vertical wells.
[0002] FIELD OF THE INVENTION The present invention relates to a method of mechanically digging a communication branch connecting two traffic tunnels or two vertical wells in a geological environment subjected to a high water pressure. It also relates to an installation for its implementation, as well as a work obtained by such a method. BACKGROUND OF THE INVENTION Transport infrastructures are increasingly resorting to tunnels, especially in dense urban areas to compensate for the lack of space on the surface. For reasons of safety and capacity of the transport infrastructure, a tunnel is very often dedicated to a single direction of traffic. In the case of passenger transport, emergency exits shall be accessible at regular intervals.
[0003] The optimum spacing between two emergency exits results from a specific study, and is generally between 100 and 500 m. To meet this requirement, one solution is to go from one traffic tunnel to another by means of what is called "communication branch". By this expression is meant a communication structure linking the two tunnels.
[0004] In the case where the infrastructure is in an underground water table, sealing of the structure becomes a critical issue. The construction of sealed bored tunnels by means of a mechanized tunnel boring machine has become a known problem that companies know how to treat. However, the difficulty that remains is the realization of a communication branch opening into the main tunnels already built. It is indeed necessary to avoid destroying locally the tightness of these tunnels at the risk of drowning everything. One of the classic solutions to this problem is to freeze the soil in the area of execution of the communication branch. Freezing temporarily secures soil sealing which can then be attacked by conventional slaughter means. When the coating covering the inner surface of the communication branch is laid, and that its junctions with the main tunnels are carried out, then sealing of the assembly is ensured. The surrounding soil can then be thawed. However, the freezing of a terrain is very sensitive to local geotechnics. It follows that the implementation delays are often poorly controlled, as well as the associated cost of implementation. This leads to looking for more efficient methods of realization. Thus, the purpose of the present invention is to propose a method of mechanically digging a communication branch connecting two traffic tunnels while taking into account: the possible presence of an underground water table; the fact that the points of departure and arrival of the branch are tunnels whose sealing must be preserved; the diameter of the communication branch to be made is greater than the usual values of 2000 mm, and rather of the order of 3000 mm or more. A similar problem arises for the creation of a communication branch between two vertical wells.
[0005] SUMMARY OF THE INVENTION The present invention relates in the first place to a method of mechanically digging a communication branch between two traffic tunnels or between two vertical wells, characterized in that it comprises a series of steps according to which: i / driving, from a first of said two tunnels or wells, towards said second tunnel or well, a first section of metal tube equipped with a cutting kit, the internal diameter of this tube being equal; the inner diameter of said communication branch; ii / it is put in place, behind said first section of tube and in its extension, a second section of the same diameter, and we drive together these two sections; - iii / if necessary, repeat operation ii /; Said tube sections being left in place and the materials contained in the tube being removed later. Thus, thanks to the invention, metal sections are used which, abutting one after the other, make it possible to form a large diameter horizontal coring device, and to darken it from a first tunnel towards a second tunnel or, if appropriate, a first well in the direction of a second well. This allows to set up a temporary waterproof coating corresponding to the outer envelope of the final communication branch, without extracting the soil in place and while avoiding the arrival of water in the main tunnel of departure.
[0006] The first section of the tube is equipped with a cutting tool preferably provided with teeth. It should be recalled that in the field of drilling a cutting kit is a tubular cutting piece mounted at the end of a corer to facilitate its penetration into the ground during a sinking.
[0007] According to other non-limiting and advantageous features of the invention: step ii is repeated as many times as is necessary to open into the second tunnel or well; alternatively, said steps i / to iii / are carried out from each of the tunnels or wells, until said sections meet; 10 - prior to the step i / sinking, is fixed against the wall of the first tunnel or well, centered on the longitudinal axis of said branch, a tympanum of support and support which has a cylindrical opening of equal or slightly greater diameter the diameter of said sections; prior to step i / of sinking, the steps are implemented in which: - is drilled along the longitudinal axis of said branch, a conduit whose tightness is checked vis-à-vis tunnels or wells and wherein a drill pipe longer than that of said branch is fitted with the ends of said tube projecting into each of said tunnels or wells; - Is positioned against the wall of each of the tunnels or wells, fitted on each of said ends of the drill pipe, a plug which inscribed in a cylinder of diameter slightly less than the inner diameter of said pipe sections; - On said ends, is placed a clamping means of said cap against the wall of each of said tunnels or wells; said driving step is implemented by means of a sinking device which moves said sections in a combined movement of translation and rotation; said driving device is moved and guided by a stuffing device fixed on said tympanum; - On said pushing device are positioned means for centering, guiding and sealing said sections which cooperate with the outer wall of these sections; - On the periphery of said plug, are positioned means for centering, guiding and sealing said sections which cooperate with the inner wall of these sections.
[0008] Another aspect of the invention relates to a mechanized digging plant for a communication branch between two traffic tunnels or between two vertical wells, characterized in that it comprises: a set of metal tube sections including a section provided with a cutting kit, the internal diameter of this tube being equal to the internal diameter of said communication branch; - A sinking device that moves said sections in a combined movement of translation and rotation. Finally, another aspect of the invention relates to a work obtained at the end of the digging process described above, prior to removal of the materials filling the tube. Said structure comprises two circulation tunnels or two vertical wells and a tube formed of a plurality of sections extending between said tunnels or between said wells and is characterized in that said tube contains the floor separating said tunnels or wells. guaranteeing tightness with respect to said tunnels or wells.
[0009] BRIEF DESCRIPTION OF THE DRAWINGS Other features and advantages of the invention will become apparent upon reading the following description of a preferred embodiment of the invention. This description is made with reference to the accompanying drawings in which: - Figure 1 is a cross-sectional view of one of the two tunnels from which it is proposed to build a communication branch; FIG. 2 is a partial longitudinal sectional view of said communication branch and of a portion of the two tunnels that can be connected; FIG. 3 is a detailed view of part of FIG. 2; - Finally, Figure 4 is a perspective view of the two aforementioned tunnels and the communication branch which makes them join, the devices used for its realization being partially visible in the tunnel to the left of the figure. DETAILED DESCRIPTION OF THE INVENTION In the description which follows and in the figures which illustrate it, we are interested in the creation of a communication branch connecting two traffic tunnels. The invention however applies similarly to the creation of a communication branch between two vertical wells.
[0010] 3025829 5 As indicated above, in Figure 1 attached is visible in section one of the traffic tunnels that it is proposed to equip a communication branch with another tunnel (not shown in this figure). This tunnel, which can be described as a first tunnel or a departure tunnel, has the reference 1. It is a tunnel whose construction is completed, whose wall 100 is formed in particular of segments arranged in staggered rows. in relation to each other, as is well known. This tunnel is equipped in particular with a platform 12 of circulation, ventilation ducts 10, as well as tubes, pipes and / or cables allowing for example the circulation of fluids or information. Other equipment not shown may be in place in the tunnel. The second tunnel 2 is particularly visible in FIG. 4. In accordance with the invention, the establishment of the communication branch is carried out without compromising the integrity of tunnels 1 and 2 already built, which makes it possible to avoid generate additional work, deadlines and costs. For this purpose, and as will be described in detail below, a corer is used to cut the wall of the tunnels and the floor separating the two tunnels while driving a tube defining the envelope of the branch, without extracting at this stage the materials contained in the tube. Prior to the construction of the branch, its longitudinal axis XX '(see FIG. 2) is identified by means of topography known to those skilled in the art, such as a theodolite, which allows a positioning by ratio to the metric point of the tunnel. A retention and reinforcement eardrum referenced 4 is then positioned on the side of the first tunnel 1. It is in fact a concrete part which has a cylindrical opening 40 of diameter slightly greater than that of the branch which it is desired to put in place, which is fixed against the wall 100 of the tunnel 1, as is particularly visible in Figures 1 and 2. The face of the tympanum facing the wall has a convex shape complementary to the concave shape of the wall 100 of the tunnel. The connection between the tunnel wall and the tympanum must ensure local sealing and load transfer applied to the tunnel wall as it is pierced by the corer. The function of this eardrum is also to ensure the recovery of the forces exerted on the tube 6 constituting the branch, as will be seen below. To this eardrum 4 is attached a pushing device for pushing the corer (for example this pushing device comprises the four horizontal and parallel rods 5 which extend towards the inside of the tunnel 1). This function will be explained later in the description. A similar eardrum can be placed in the tunnel 2.
[0011] To take up the thrust of the immersed ground cut by the corer in the tunnels 1 and 2 during the realization of the communication branch 6, is placed beforehand in each of the tunnels 1 and 2, a cap 3, respectively 3 '. Each of these plugs is intended to abut against the wall 100, 200 of the corresponding tunnel 1, 2, so as to create a solid and sealed structure when sinking the branch. To do this, one proceeds along said axis X-X 'to the drilling of a conduit C which is centered on said axis, while ensuring the tightness of the two tunnels. The tube T is then fitted with an outside diameter slightly smaller than the inside diameter of the duct C. This tube T has the particularity of having a length which is much greater than that of the space separating the two tunnels. 1 and 2, so that its two opposite ends project into each tunnel. Is then positioned, by fitting on each of its ends, said cap 3, 3 'which consists of a generally cylindrical contour piece, with a convex rear face, intended to be pressed against the wall 100, respectively 200 of tunnels, this in a sealed manner. Each of the plugs 3 has an axial through opening 30, 30 'of diameter slightly greater than that of the tube T with an increase in diameter 31 which makes it possible to set up a clamping piece B, B' similar to a bolt. In doing so, it generates pressure forces directed towards one another, which will oppose the pressure forces that will be generated during the manufacture of the branch itself. Expressed in a different manner, the plugs will ensure the holding of the materials during the digging of the branch and resume efforts due to outbreaks of groundwater and the surrounding soil. Between each couple eardrum / cap there is a free annular space, which is used for the realization of the branch. As has been indicated above in the description, the embodiment of the branch 30 will be made using sections of tube 6, three of which are visible in Figure 2 under the references 6a, 6b and 6c. This is of course a simple embodiment, so that depending on the length of the branch, more than three sections can be used, which is why these are generally referenced 6n.
[0012] These sections, all of the same diameter, are dimensioned so that they can be inserted into the annular space present between each tympanic / plug pair.
[0013] For their installation, use is made around the cap 3 of a guiding means 32 forming a ring, whose outer diameter is equal to the inner diameter of the sections 6a to 6c. Likewise, on the tubes 5 forming the stuffing device, a ring-shaped guide means 50 is positioned, which has the capacity to be displaced longitudinally along the rods 5 and to have an internal diameter that is slightly greater than the Thus, the elements 32 and 50 make it possible to center and guide in translation the sections in the direction of the space separating the tunnels, as well as the tightness of the screw-to-pipe sections. -vis the walls of the tunnel. The first section set up is that which is referenced 6a in Figure 2. This section is not only moved but must also contribute to the cutting of the rock and, more generally, the soil occupying the volume of the future branch. For this purpose, the upstream end of this first section 6a is provided with a cutting kit 60 15 provided with teeth, adapted to the terrain to be crossed. To enable this section to be moved, a driving device also called "rotator" 7 is positioned as shown in FIG. 7, which has the capacity to impart a rotational movement to said section 6a, allowing the cutting tool 60 to cut the field in front of her. To this is combined a translation movement provided by the pushing device 5. The section 6a can therefore move both in translation and in rotation around the axis X-X '. When this section 6a is completely engaged inside the space between the two tunnels, the withdrawal is carried out in a reverse movement of the rotator 7 and a new section 6b is positioned, which is itself displaced by the rotator, and which pushes the first section 6a towards the second tunnel. This operation is repeated as many times as necessary. As the sections are put in place, each new section is welded to the section previously inserted, so that all of these sections form a tube that moves in the same combined movement of rotation and translation around it. of the X-X 'axis. The rotator and the tube formed successive sections together form the corer mentioned above. In this embodiment which has just been described, the sections are put in place starting from the first tunnel 1. In this case, when approaching the second tunnel 2, for example local freezing to the right of the cap 3 'to pierce the wall 200 of the second tunnel without altering the seal. In a not shown embodiment, it is possible to use, in the second tunnel 2, a second rotator 7 similar to that which equips the entrance tunnel 1 and a tympanum similar to the eardrum 4. The communication branch is then constituted two dark tubes from each tunnel 1 and 2, which meet in an intermediate position. In this case, the tubes are of slightly different diameters to allow penetration of one into the other and thus facilitate the connection of the two tubes. Local freezing then makes it possible to ensure temporary sealing at the meeting point of the two tubes. Thus, according to one embodiment of the invention, a method that can be implemented for the realization of this branch may comprise the following steps: a) positioning in each tunnel 1 and 2 of the axis XX 'of the branch 6 of communication; b) installation in each tunnel 1 and 2 of a tympanum 4 reinforcing the opening of the communication branch in the main tunnel; c) drilling and installation of the cap retaining system 3 and 3 '; D) placing plugs 3 and 3 'of each tunnel 1 and 2; e) on the first tunnel side 1, setting up the guidance system for the driving phase; f) first tunnel side, placing on the plug 3 of the device ensuring the movement and sealing on the inner face of the metal tube; G) on the first tunnel side, placing on the eardrum 4 of the device ensuring the maintenance and sealing of the outer face of the metal tube; h) first tunnel side, setting up the translation system connecting the rotator to the tympanum; i) on the first tunnel side, setting up the rotator 7; J) on the first tunnel side, coring of a first section 6a of the metal tube equipped with its cutting kit (it begins by cutting the coating of the main tunnel before entering the ground); k) on the first tunnel side, at the end of coring of the first section of metal tube, blocking of the metal tube, retraction of the rotator, insertion of the next section 30, splicing in the preceding segment and resumption of the coring, and so on until joining the tube introduced by the second tunnel 2; l) Local freezing to seal the junction. Particularly advantageously, the method, because it does not encroach on the entire section of the main tunnels, can be set up in parallel with the digging of the main tunnels by means of mechanized tunnel boring machines. The sections of tube that constitute the branch 6 are "lost", because they are left in place inside the branch. This is subsequently removed from the soil and 3025829 9 of the materials that clog, and one plate on the tube of voussoirs to perfect the mechanical strength and the tightness of the branch. Finally, as already explained above, the invention is not limited to the creation of a communication branch connecting two tunnels (said tunnels extending in a substantially horizontal plane) but applies similarly to the creation of a communication branch connecting two vertical wells.
权利要求:
Claims (11)
[0001]
REVENDICATIONS1. Method of mechanically digging a branch (6) for communication between two tunnels (1,
[0002]
2) or between two vertical wells, characterized by the fact that it comprises a series of steps according to which: - i / we drive, from a first (1; 2) of said two tunnels (1, 2 ) or well, towards said second tunnel (2; 1) or well, a first section (6a) of metal tube equipped with a cutting kit (60), the internal diameter of this tube being equal to the internal diameter of said branch of communication (6); ii / it is put in place, behind said first section (6a) of tube and in its extension, a second section (6b) of the same diameter, and we drive together these two sections (6a, 6b); - iii / if necessary, repeat operation ii /; said tube sections (6a, 6b, 6c, ..., 6n) being left in place and the materials contained in the tube being removed later. 2. Method according to claim 1, characterized in that step ii is repeated as many times as is necessary to open into the second tunnel (1; 2) or well.
[0003]
3. Method according to claim 1, characterized in that said steps i / iii / are implemented from each of the tunnels (1; 2) or well, until said sections (6a, 6b, 6c, ..., 6n) come together.
[0004]
4. Method according to one of the preceding claims, characterized in that prior to step i / sinking, is fixed against the wall of the first tunnel (1) or well, centered on the longitudinal axis of said branch ( 6), a tympanum of reinforcement and support (4) which has a cylindrical opening (40) of diameter equal to or slightly greater than the diameter of said sections (6a, 6b, 6c, ..., 6n).
[0005]
5. Method according to one of the preceding claims, characterized in that prior to the step i / sinking: - is drilled along the longitudinal axis (X-X ') of said branch (6), a conduit ( C) whose tightness is checked vis-à-vis the tunnels (1, 2) or well and in which a tube (T) of drilling longer than that of said branch (6), the ends of said tube ( T) projecting inside each of said tunnels (1; 2) or well; Placing against the wall (100, 200) of each of the tunnels (1, 2) or well, fitted on each of said ends of the drilling tube (T), a plug (3) which is inscribed in a cylinder of diameter slightly smaller than the inside diameter of said tube sections (6a, 6b, 6c, ..., 6n); - On said ends is placed a clamping means (B) of said plug (3) against the wall (100, 200) of each of said tunnels (1; 2) or well.
[0006]
6. Method according to one of the preceding claims, characterized in that said step of sinking is implemented by means of a sinking device (7) which moves said sections (6a, 6b, 6c, ..., 6n) according to a combined movement of translation and rotation.
[0007]
7. Method according to claim 6 in combination with claim 4, characterized in that said sinking device (7) is moved and guided by a pushing device (5) fixed on said eardrum (4). 15
[0008]
8. A method according to claim 7, characterized in that on said pushing device (5) are positioned means for centering, guiding and sealing (50) of said sections (6a, 6b, 6c, ..., 6n) which cooperate with the outer wall of these sections. 20
[0009]
9. A method according to claim 8, characterized in that on the periphery of said plug (3) are positioned means for centering, guiding and sealing (32) of said sections (6a, 6b, 6c, ..., 6n) which cooperate with the inner wall of these sections. 25
[0010]
10. Installation mechanized digging of a branch (6) for communication between two tunnels (1, 2) of circulation or between two vertical wells, characterized in that it comprises: - a set of sections (6a, 6b, 6c, ..., 6n) of metal tube including a section (6a) provided with a cutting kit (60), the inner diameter of this tube being equal to the inner diameter of said communication branch (6); a sinking device (7) which moves said sections (6a, 6b, 6c, ..., 6n) in a combined movement of translation and rotation.
[0011]
11. Work obtained by the method according to one of claims 1 to 9, comprising two tunnels (1, 2) circulation or two vertical wells and a tube formed of a plurality of sections (6a, 6b, 6c,. .., 6n) extending between said circulating tunnels or between said wells, characterized in that said tube 30 contains the soil separating said tunnels or wells by sealing against said tunnels or wells. 5
类似技术:
公开号 | 公开日 | 专利标题
FR3025829A1|2016-03-18|METHOD AND INSTALLATION FOR MECHANIZED HOLLOWING OF A COMMUNICATION FRAME BETWEEN TWO CIRCULATION TUNNELS OR BETWEEN TWO VERTICAL WELLS.
FR2507281A1|1982-12-10|APPARATUS AND METHOD FOR CONNECTING TUBULAR ELEMENTS
FR2561962A1|1985-10-04|METHOD AND DEVICE FOR PREPARING, WITH REMOTE HANDLING, THE TWO END OF A TUBE, FORMED BY SAWING A TUBE ELEMENT, OF A TUBULAR CONDUIT THUS SUBDIVIZED
BE1015123A3|2004-10-05|Together for an core drilling or devie.
EP0014614A1|1980-08-20|Dismantable device for inserting an apparatus between two conduits
EP0457653A1|1991-11-21|Safety sleeve and device for wells, particularly for a subterranean reservoir of fluid under pressure
EP0692606B1|1999-12-29|Method for lining a tunnel
EP2697470B1|2015-05-20|Method and device for nondestructive drilling
WO2013057442A1|2013-04-25|Large-diameter drilling device
EP0828108A1|1998-03-11|Process for connecting conduits
BE1000299A3|1988-10-11|Sinking YARD FOR TUBE PUSHER TUBES, AND DEVICE FOR INSTALLATION BY THRUST HYDRAULIC TUBES.
FR2579294A1|1986-09-26|Device for repairing pipelines in situ, in particular for drainage channels which cannot be visited
WO2021005170A1|2021-01-14|Crs: quick connector for tunnel boring machine spoil pipe
WO2014006204A2|2014-01-09|Drilling device and method
FR2602568A1|1988-02-12|GUIDING AND PROTECTION DEVICE FOR THE INSTALLATION OF PIPES
FR2726882A1|1996-05-15|Method of replacing old buried pipe by new
FR2724411A1|1996-03-15|Tunnel borer with orthogonal auxiliary tunnelling head
FR3023867A1|2016-01-22|SPECIAL TIGHTENING SHOULDER FOR A TUNNEL, SET OF SUCH SPECIAL TIGHTS, COATING COMPRISING SUCH AN ASSEMBLY AND ASSOCIATED METHOD
FR2645584A1|1990-10-12|DEVICE FOR EXCAVATING TRANSVERSE GALLERIES WHEN PUNCHING TUNNELS OR GALLERIES
FR3031133A1|2016-07-01|WALL TUNNEL CONSISTING OF JUXTAPOSED TAPES, KIT AND METHOD FOR TURNING OFF A TUNNEL
FR3055919A1|2018-03-16|SOIL DRILLING DEVICE FOR PERFORMING EXPANSION TESTS IN DRILLING IN SITU FLOOR
WO2021005174A1|2021-01-14|Tool for aligning and mounting a collar on a mucking pipeline for a tunneling machine
FR2749918A1|1997-12-19|SYSTEM AND METHOD OF CONNECTION BETWEEN TWO MOBILE ASSEMBLIES RELATIVE TO THE OTHER, ESPECIALLY IN UNDERWATER INSTALLATIONS
BE1004967A6|1993-03-09|Stop valve and process for constructing it on a pipeline
FR2591714A1|1987-06-19|Method for connecting a building to a gas supply and tooling for carrying out this method
同族专利:
公开号 | 公开日
FR3025829B1|2020-05-08|
AU2015317071A1|2017-04-27|
WO2016041858A1|2016-03-24|
EP3194722A1|2017-07-26|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
US3656563A|1970-02-16|1972-04-18|Charles F Blinne|Apparatus and method for inserting casing beneath roadbeds|
US3742718A|1970-09-25|1973-07-03|B Weiss|Tube driving apparatus|
BE805926A|1973-10-11|1974-02-01|Vandemeulebroucke Werner|PROCEDURE FOR CREATING A PASSAGE OR TUNNEL THROUGH A GROUND HILLING OR THE LIKE, ACCESSED AND RESOURCES USED HEREIN|
DE2507984A1|1975-02-25|1976-09-09|Fridrich Wilhelm Paurat|Tunnel connecting parallel tunnels - has pilot hole drilled between tunnels and boring tool pulled back to enlarge bore|
US4388021A|1981-08-26|1983-06-14|Richard Weiss|Method of and device for making canalization by advancing under pressure a string of sewer pipes|
US8684104B1|2007-04-13|2014-04-01|Andrew J. Fisk, III|Detachable pipe ramming head with efficient lubrication dispersal|FR3101661A1|2019-10-08|2021-04-09|Vinci Construction Grands Projets|Reinforced concrete tunnel segment|
CN106014442B|2016-07-07|2018-03-02|云南省交通规划设计研究院|A kind of vcehicular tunnel escape and rescue transverse passage-way method to set up|
CN106437735B|2016-11-07|2018-06-01|中铁工程装备集团有限公司|Tunnel connection channel shield machine and its service channel driving method|
CN109026060B|2018-08-30|2020-08-11|上海隧道工程有限公司|Duct piece cutting part structure for connecting channel punching center dislocation by mechanical method|
CN109469497B|2018-12-05|2020-07-07|张辉|Movable tunnel segment supporting frame for subway construction|
CN111396064B|2020-06-04|2020-08-25|数源汇通(北京)医药科技有限公司|Soil digging device for tunnel underground excavation machine|
CN112031785A|2020-09-27|2020-12-04|中铁工程装备集团有限公司|Starting device of development machine|
CN113775343A|2021-11-12|2021-12-10|中国矿业大学|Ground non-destructive type transverse channel main body excavation construction method|
法律状态:
2015-09-18| PLFP| Fee payment|Year of fee payment: 2 |
2016-03-18| PLSC| Search report ready|Effective date: 20160318 |
2016-09-12| PLFP| Fee payment|Year of fee payment: 3 |
2017-09-07| PLFP| Fee payment|Year of fee payment: 4 |
2018-09-11| PLFP| Fee payment|Year of fee payment: 5 |
2019-09-09| PLFP| Fee payment|Year of fee payment: 6 |
2020-09-10| PLFP| Fee payment|Year of fee payment: 7 |
2021-08-10| PLFP| Fee payment|Year of fee payment: 8 |
优先权:
申请号 | 申请日 | 专利标题
FR1458627|2014-09-15|
FR1458627A|FR3025829B1|2014-09-15|2014-09-15|METHOD AND INSTALLATION FOR MECHANIZED EXCAVATION OF A COMMUNICATION RAME BETWEEN TWO TRAFFIC TUNNELS OR BETWEEN TWO VERTICAL WELLS.|FR1458627A| FR3025829B1|2014-09-15|2014-09-15|METHOD AND INSTALLATION FOR MECHANIZED EXCAVATION OF A COMMUNICATION RAME BETWEEN TWO TRAFFIC TUNNELS OR BETWEEN TWO VERTICAL WELLS.|
PCT/EP2015/070822| WO2016041858A1|2014-09-15|2015-09-11|Method and installation for mechanical excavation of a cross passage between two traffic tunnels or between two vertical wells|
AU2015317071A| AU2015317071A1|2014-09-15|2015-09-11|Method and installation for mechanised digging of a cross-passage between two traffic tunnels or between two vertical shafts|
EP15767450.8A| EP3194722A1|2014-09-15|2015-09-11|Method and installation for mechanical excavation of a cross passage between two traffic tunnels or between two vertical wells|
[返回顶部]