专利摘要:
Installation for water production. The facility focuses its features on taking advantage of geothermal energy as a cooling element feeder of one or more condensers (2-2 '), so that the fluid cooled in said geothermal installation (1), whether a conventional horizontal, vertical or horizontal installation artificial, it is used to cool the ambient air and condense the humidity of the same, so that the water contained in the air is redirected to a storage tank. To recirculate the cooling fluid, pumps (6-6 ') or compressors are used that are fed through electric accumulators (8-8') assisted in turn by wind turbines (9) and/or photovoltaic solar panels (10). (Machine-translation by Google Translate, not legally binding)
公开号:ES2654381A1
申请号:ES201631093
申请日:2016-08-11
公开日:2018-02-13
发明作者:Raúl PIÑOL PASCUAL
申请人:Raúl PIÑOL PASCUAL;
IPC主号:
专利说明:

image 1
image2
image3
image4
image5
image6
权利要求:
Claims (1)
[1]
image 1
image2
类似技术:
公开号 | 公开日 | 专利标题
PH12016500561A1|2016-05-23|Power electronic device cooling system and distributed power generation system
ES2658062T3|2018-03-08|Procedure to store electrical energy
ES2617450T3|2017-06-19|Wind farm and procedure for driving a wind farm
AR089599A1|2014-09-03|WIND ENERGY INSTALLATION GONDOLA
GB2455773B|2012-08-08|Energy recovery system
ES2654381A1|2018-02-13|INSTALLATION FOR WATER PRODUCTION |
CN203705999U|2014-07-09|Constant temperature humidity protection system used for network server construction
AR094830A1|2015-09-02|WIND ENERGY INSTALLATION AND PROCEDURE FOR OPERATING A WIND ENERGY INSTALLATION
ES2440894B1|2014-11-07|Manufacturing procedure of a offshore wind platform, resulting platform and wind energy utilization system
ES2423079B1|2014-07-25|MICRO HYDROELECTRIC POWER GENERATION DEVICE FOR BUILDINGS AND ENERGY EFFICIENCY PROCEDURE
CN204678760U|2015-09-30|A kind of tower barrel of wind generating set cooling system
CN204349292U|2015-05-20|The inverse transformation cabinet of high-efficient ventilation heat radiation
CN204642327U|2015-09-16|A kind of supercharger cooling mechanism
ES2480915A1|2014-07-28|Hybrid plant with a combined solar-gas cycle, and operating method
ES1204786U|2018-02-08|PHOTOVOLTAIC GLASS CURTAIN |
CN104390386A|2015-03-04|Semiconductor refrigeration system
WO2019135690A1|2019-07-11|Advanced air cooling system
RU2013135699A|2015-02-10|ENERGY INSTALLATION WITH CLOSED CIRCUITS
ES2540939A1|2015-07-14|Direct steam generation plant and plant operation procedure |
CN204518656U|2015-08-05|A kind of new type solar energy heating greenhouse booth
ES2440865B2|2014-10-07|Support structure for photovoltaic solar panels and method for obtaining it
Zhang et al.2019|New Progress and Thinking on Building Integrated PVT Heat Pump Technology
UA107616U|2016-06-10|INSTALLATION WIND-HEATING INSTALLATION
PL431586A1|2021-05-04|System for solar energy house heating during winter
ES1211913U|2018-05-09|AEROGENERADOR INTEGRATED IN AN ELEMENT OF HELP TO NAVIGATION |
同族专利:
公开号 | 公开日
ES2654381B1|2018-11-30|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题
US4459177A|1981-05-08|1984-07-10|Hare Louis R O|Ground moisture transfer system|
US20020141828A1|2000-02-14|2002-10-03|Boaz Wachtel|Irrigation system and method|
CN102986499A|2012-11-07|2013-03-27|黑龙江海昌生物技术有限公司|Self-powered and cold air-assisted water-drawing self-irrigation system based on ground surface temperature difference|
WO2015149816A1|2014-04-04|2015-10-08|УГЛОВСКИЙ, Сергей Евгеньевич|Device for producing water from ambient air|
法律状态:
2018-11-30| FG2A| Definitive protection|Ref document number: 2654381 Country of ref document: ES Kind code of ref document: B1 Effective date: 20181130 |
优先权:
申请号 | 申请日 | 专利标题
ES201631093A|ES2654381B1|2016-08-11|2016-08-11|INSTALLATION FOR WATER PRODUCTION|ES201631093A| ES2654381B1|2016-08-11|2016-08-11|INSTALLATION FOR WATER PRODUCTION|
[返回顶部]