![]() Platform with hose reel
专利摘要:
A platform (10) with a central region (70) for production and/or proces sing and/or storage of hydrocarbons, has a hose reel (30) arranged adjacent to a service area (50). The hose reel is arranged outside the central region and oriented with its axis of rotation (a-a) being directed towards the central region, and the service area is not between the reel and the central region. 公开号:DK201370090A 申请号:DKP201370090 申请日:2011-08-29 公开日:2013-02-20 发明作者:Nygaard Stig Andre 申请人:Aker Pusnes As; IPC主号:
专利说明:
PLATFORM WITH HOSE REEL Field of the invention This invention generally relates to an offshore loading system for transferring hydrocarbon products via an offloading hose from a storage facility of a transport vessel such as a shuttle tanker. More specifically, the invention relates to a platform having a central region for production and / or processing and / or storage of hydrocarbons and a hose reel arranged adjacent to a service area. Background of the invention The production of hydrocarbons (e.g. crude oil and gas) from subsea reservoirs is facilitated by multiple large offshore production facilities located near one or more subsea wells. Traditionally, the hydrocarbons have been transported from the offshore production facility to onshore storage facilities and further processing, via pipelines laid on the seabed. However, as hydrocarbons are being produced from reservoirs located in deeper and deeper waters and in regions where the seabed includes rough or uneven terrain such as steep cliffs and deep canyons, the use of seabed pipelines has become increasingly complex and prohibitively expensive. Thus, a more economical and flexible system for transporting the hydrocarbons to onshore locations involves the use of offshore storage facilities at or near the production location, in combination with shuttle tankers. The offshore storage facility may comprise subsea storage cells integrated with a so-called Gravity Base Structure (GBS) platform or connected to a loading buoy of a fixed platform, or the offshore storage facility may be integrated into a so-called Floating Production, Storage and Offloading (FPSO) vessel which is maintained in position in a manner which is known in the art (eg moorings and / or thrusters controlled by dynamic positioning). The hydrocarbons are transferred from the offshore storage facility (e.g. platform) to the carrier (e.g. a shuttle tanker) via a flexible transfer conduit, commonly referred to as a marine hose. The hose may be stored on a reel on the platform and connected to an on-board piping system, e.g. via a so-called "pipeline-end manifold" (PLEM). Before commencing discharge of hydrocarbons, the free end of the flexible hose is pulled across and connected to the shuttle tanker, in a manner less known in the art. Figure 1 illustrates the principle of a prior art hose reel station aboard a platform 1. A hose reel 3 is arranged near an edge of the platform. A hose 2, which may be connected to a shuttle tanker (not shown), extends through a guide structure 4 into a deck structure 6 which is partially cantilevered out from the platform hull 8. On the side of the reel 3 that faces the platform (and not out towards the sea) is a service area 5 in which the hose end portion 2 'may be handled; e.g. pulled in and dismantled for maintenance. Immediately behind the service area is the platform process area 7. Summary of the invention The invention is set forth and characterized in the main claims, while the dependent claims describe other characteristics of the invention. It is thus provided a platform having a central region for production and / or processing and / or storage of hydrocarbons and a hose reel arranged adjacent to a service area, characterized in that the hose reel is arranged outside the central region and oriented with its axis of rotation (aa) being directed towards the central region, and the service area is not between the reel and the central region. In one embodiment, the reel is arranged in a region near an edge of the platform. In one embodiment, the service area is outside the central region. In one embodiment, the hose platform comprises a hose guide structure in the platform, comprising curved side walls and configured to provide lateral support for the hose. In one embodiment, the platform comprises a spooling gear, having a guide funnel for the hose and motion control means for controlled movement along the guide structure. In one embodiment, the motion control means comprise releasable locking means, whereby the hose guide structure may be locked in a fixed position along the guide structure. In one embodiment, the guide structure outline generally corresponds to the axial extension of the reel, and the guide structure is arranged substantially parallel to the reel axis of rotation, whereby the outer portion of the guide structure provides lateral support for the hose. Preferably, the guide structure outline is rectangular, with the outer portion defining an end of the rectangle. In one embodiment, the platform is an offshore storage facility for hydrocarbons and comprises a GBS or a floating structure. The invention makes valuable deck space available for e.g. process equipment, in that the service area is now no longer extending into the process area. This gives considerable cost savings during platform construction. Also, arranging the hose reel with its axis of rotation (and also the guide structure) pointing towards the central regions of the platform, as in the invention, makes it easier to transfer the forces imposed by the hose into the rigid deck structure - via the spooling gear and / or guide structure - than with the prior art arrangement where wide operating angles may require additional movable devices for arresting the loads imposed by the hose. Brief description of the drawings These and other characteristics of the invention will be clear from the following description of a preferred form of embodiment, given as a non-restrictive example, with reference to the attached schematic drawings: Figure 1 is a side view of a part of a platform having a hose reel arrangement according to the prior art; Figure 2 is a side view of a part of a platform showing an embodiment of the hose reel arrangement according to the invention; Figure 3 is a top view of the embodiment illustrated in Figure 2; Figure 4 is a side view of a part of a platform showing the embodiment of the hose reel arrangement according to the invention, including the guide structure; spirit Figure 5 is a view of a portion of the platform, as seen along the hose reel axis, showing the embodiment of the hose reel arrangement according to the invention, including the guide structure. Figure 6 is a side view of a spooling unit; Figure 7 is a perspective view of a spooling unit assembled on guide rails; Figure 8 is a schematic perspective view of an embodiment of the hose reel arrangement according to the invention, including the guide structure and the spooling unit, and Figure 9 is a schematic perspective view of an embodiment of the hose reel arrangement according to the invention, illustrating an alternative arrangement of the service area in relation to the hose reel. Detailed description of a preferred embodiment Referring initially to Figure 2, a hose reel 30 is placed toward the edge of a platform 10. The platform 10, which may be a GBS or a floating structure known in the art, comprises a hull 80, a process area 70 and a deck 60, part of which is cantilevered out over the water W. The axis of rotation of the reel is indicated by the dotted line aa, and is pointing towards the process area 70 in one direction and out of the platform in the other direction. Figure 1 illustrates a situation where the hose is connected to e.g. a shuttle tanker (not shown). The hose 2 passes through a guide structure 40 in the deck 60. The hose is only shown partially, as the connection to the shuttle tanker is well known in the art. In Figure 3, which shows the configuration of Figure 2 as seen from above, it may be seen that the service area 50 is not located between the reel 30 and the process area 70, as is the case in the prior art (cf. figure 1). This frees up more, valuable, deck space for process equipment and / or the platform deck may be made smaller than platform decks of the prior art. In the process area 50, the hose end 2 'may be handled by personnel and connected to the required platform equipment (not shown). Figures 4 and 5 illustrate how the guide structure 40 comprises curved side walls and provides lateral support for the hose. In one embodiment, the guide of the hose is advantageously provided by a spooling gear 90 (see Figure 6), which comprises a guide funnel 93 for the hose and support-and-locking means (eg rollers) 91. Figure 7 illustrates the spooling gear arranged on a pair of tracks (eg rails) 92, and figure 8 shows the spooling gear and tracks arranged in relation to the deck opening (guide structure 40). As described above, the service area 50 and hose reel 30 are arranged outside of the process area 70. Figure 9 illustrates schematically a variant where the guide structure 40 and spooling gear 90 are arranged on the same side of the hose reel as the service area 50th When the hose is being reeled out from, or onto, the hose reel, the spooling gear 90 is moved in a controlled manner (by motors, not shown) along tracks 92, so as to guide the hose. When the hose reel is not rotating (eg in an offloading situation), the spooling gear is locked in position relative to the tracks (in a manner which is known per se), such the roller motors, etc. do not take any loads during the offloading operation. Alternatively, the spooling gear may bear against one of the end portions of the guide structure 40 (e.g., as shown in figure 8). Figure 8 also shows how the guide structure 40 outline generally corresponds to the axial extension of the reel (rectangular), and that the guide structure is arranged substantially parallel to the reel axis of rotation, whereby an outer portion 99 of the guide structure provides lateral support for the hose. Although the description of the preferred embodiment refers to a hose, the skilled person understands that the invention is equally applicable to pipelines in general, including steel tubular pipelines as well as bonded and non-bonded flexible flowlines fabricated from composite materials.
权利要求:
Claims (9) [1] 1. A platform (10), having a central region (70) for production and/or processing and/or storage of hydrocarbons and a hose reel (30) arranged adjacent to a service area (50), characterized in that the hose reel is arranged outside the central region and oriented with its axis of rotation (a-a) being directed towards the central region, and the service area is not between the reel and the central region. [2] 2. The platform of claim 1, wherein the reel is arranged in a region near an edge of the platform. [3] 3. The platform of any of the preceding claims, wherein the service area is outside the central region. [4] 4. The platform of any of the preceding claims, further comprising a hose guide structure (40) in the platform, comprising curved side walls and configured for providing lateral support for the hose. [5] 5. The platform of claim 4, further comprising a spooling gear (90), having a guide funnel (93) for the hose and motion control means (91, 92) for controlled movement along the guide structure. [6] 6. The platform of claim 5, wherein the motion control means comprise releasable locking means, whereby the hose guide structure may be locked in a fixed position along the guide structure. [7] 7. The platform of any of claims 4-6, wherein the guide structure (40) outline generally corresponds to the axial extension of the reel, and the guide structure is arranged substantially parallel with the reel axis of rotation, whereby the outer portion (99) of the guide structure provides lateral support for the hose. [8] 8. The platform of claim 7, wherein the guide structure outline is rectangular, with the outer portion (99) defining an end of the rectangle. [9] 9. The platform of any one of the preceding claims, wherein the platform is an offshore storage facility for hydrocarbons and comprises a GBS or a floating structure.
类似技术:
公开号 | 公开日 | 专利标题 CA2808913C|2017-04-04|Platform with hose reel AU687516B2|1998-02-26|Pipelaying vessel and a method of converting a maritime vessel to a pipelaying vessel US20160318585A1|2016-11-03|A transfer structure, a transfer system and a method for transferring lng and/or electric power EP2867572B1|2021-08-18|Lining of pipelines to offshore installations CN102264596A|2011-11-30|Multi-function unit for the offshore transfer of hydrocarbons US20120037265A1|2012-02-16|Offshore fluid offloading systems and methods CN105899428B|2018-02-09|The mobile system and method for ship fluid conveying US9409631B2|2016-08-09|Loading hose US9383056B2|2016-07-05|Sheath protection KR101099693B1|2011-12-29|System and method for ship-to-ship transferring liquefied gas JP2020514175A|2020-05-21|Steel Catenary Riser Top Interface KR101644344B1|2016-08-08|Guardrail for offshore structure KR102297870B1|2021-09-03|Fluid transfer system US9217465B2|2015-12-22|Slewing apparatus Newport et al.2014|Espirito Santo: Operational Feedback on the Use of Steel Risers on a Turret Moored FPSO Christiani2014|Ultra deepwater reel and flexible pipelay vessel for pre-salt field developments AU713723B2|1999-12-09|Pipelaying vessel and a method of converting a maritime vessel to a pipelaying vessel GB2286648A|1995-08-23|Pipelaying vessel
同族专利:
公开号 | 公开日 AU2011298461A1|2013-02-21| SG187888A1|2013-03-28| CN103080425A|2013-05-01| EP2611967B1|2014-10-01| EP2611967A1|2013-07-10| NO20101217A1|2012-03-02| CA2808913C|2017-04-04| WO2012028529A1|2012-03-08| KR20130105640A|2013-09-25| BR112013005054A2|2017-07-18| CA2808913A1|2012-03-08| US20130279990A1|2013-10-24| NO333956B1|2013-10-28|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题 US3181628A|1963-05-20|1965-05-04|William P Verville|Conductor sleeve and packing gland for sub-aqueous marine drilling| US3937296A|1969-04-21|1976-02-10|Hercules Incorporated|Firing device, explosive charge, method, and system, for seismic exploration| JPS6261729B2|1982-02-08|1987-12-23|Shimizu Kensetsu Kk| US4964758A|1989-10-17|1990-10-23|Anatol Pekelny|Floating oil enclosure barriers an dispensing means aboard an oil tanker for discharging without the aid of surface vessels| US5119843A|1991-08-29|1992-06-09|Keenan Vaughn E|Vacuum hose storage and access apparatus| NO300536B1|1994-11-24|1997-06-16|Norske Stats Oljeselskap|Three anchor system for ships| US5624207A|1995-09-13|1997-04-29|Regional Fabricators, Inc.|Ocean bottom cable handling system and method of using same| US5655753A|1995-09-13|1997-08-12|Regional Fabricators, Inc.|Ocean bottom cable handling system and method of using same| FR2768419B1|1997-09-18|1999-10-29|Gillard Sa G|HOSE REEL FOR LARGE LENGTH OF FIRE AND FIRE FIGHTING VEHICLE EQUIPPED WITH SUCH A HOSE REEL| US20050047872A1|2003-09-03|2005-03-03|Baugh Benton F.|Deepwell reel| CN2878506Y|2004-11-29|2007-03-14|天津市海王星海上工程技术有限公司|Single point mooring portal platform| CN2806564Y|2005-07-08|2006-08-16|中国海洋石油总公司|Oil gas processing platform for shoal water zone| US7621697B2|2006-04-19|2009-11-24|Allseas Group S.A.|Abandonment and recovery system and method, and cable connector| JP4800885B2|2006-09-11|2011-10-26|株式会社畑屋製作所|Long material take-up device| US8021080B2|2007-04-26|2011-09-20|Westerngeco L.L.C.|Containerized geophysical equipment handling and storage systems, and methods of use|WO2012021808A2|2010-08-13|2012-02-16|Horton Wison Deepwater, Inc.|Offshore fluid offloading systems and methods| AU2013204835B2|2012-09-03|2016-11-10|Seacaptaur Ip Ltd|Vessel| EP3034449A1|2014-12-17|2016-06-22|KONE Corporation|Rope storage unit and method for installing elevator ropes| CN104590493B|2015-02-15|2017-03-01|中国人民解放军总后勤部油料研究所|No harbour oil tanker is defeated turns oil system for a kind of offshore| CN109071146B|2016-02-29|2019-11-01|普罗姆贝科有限责任公司|Reel assembly and its application method|
法律状态:
2016-03-21| PHB| Application deemed withdrawn due to non-payment or other reasons|Effective date: 20150831 |
优先权:
[返回顶部]
申请号 | 申请日 | 专利标题 NO20101217|2010-09-01| NO20101217A|NO333956B1|2010-09-01|2010-09-01|A snake drum station| PCT/EP2011/064613|WO2012028529A1|2010-09-01|2011-08-25|Platform with hose reel| EP2011064613|2011-08-25| 相关专利
Sulfonates, polymers, resist compositions and patterning process
Washing machine
Washing machine
Device for fixture finishing and tension adjusting of membrane
Structure for Equipping Band in a Plane Cathode Ray Tube
Process for preparation of 7 alpha-carboxyl 9, 11-epoxy steroids and intermediates useful therein an
国家/地区
|