专利摘要:
method for processing power and terminal headroom. the invention discloses a method for processing power headroom and a terminal thereof, the method comprising: in the transmission of a shared physical uplink channel (pusch) and/or a physical uplink control channel (pucch) in subframe i and group j component conveyor; the terminal reports the power headroom to the base station and indicates the type of power headroom reported in the report. the invention specifically indicates the type to which the power-free report belongs to the type while reporting the power-free height, thus avoiding confusion.
公开号:BR112012012473B1
申请号:R112012012473-0
申请日:2010-08-18
公开日:2021-06-29
发明作者:Peng Zhu;Peng Hao;Bin Yu
申请人:Zte Corporation;
IPC主号:
专利说明:

Technical field of the present invention
[001] The invention relates to the field of communication, and specifically to a method to process power headroom and a terminal thereof. Background of the present invention
[002] In the long-term evolution system of the 3rd generation partnership project (3GPP LTE), the uplink power control is used to control the transmit power of the physical uplink channel to compensate for path loss and fading channel shadowing, and suppress inter-cell interference. The physical uplink channels controlled by the uplink power control comprise the physical uplink shared channel (PUSCH), the physical uplink control channel (PUCCH) and the sound reference signal (SRS). LTE uplink power control adopts the combined open loop and closed loop control mode.
[003] In the LTE system, the PUSCH transmit power of the user equipment (UE) in subframe i is defined as:
where, P is the configured maximum UE output power, the range of which is together determined by the maximum UE power determined by the UE power class, The system configured IE P-Max, the maximum output power tolerance configured (PCMAX tolerance), and the maximum power reduction (MRP) and the additional maximum power reduction (A-MPR) that are caused by the operating frequency band, the system bandwidth, the modulation order, the position of the transmission bandwidth, the configuration of the transmission bandwidth, and so on;
is the PUSCH transmit power that is estimated by the UE according to the base station's open-loop and closed-loop power control parameters and instructions, the path loss estimate, and the number of PUSCH resource blocks sent in subframe i; M(i) is the PUSCH transmission bandwidth in subframe i, which is represented by the number of resource blocks (RBs); P(j) is an open circuit power control parameter, which is the sum of a cell specific value P(j) and a UE specific O_NOMINAL_PUSCH value P(j); where, j=0 corresponds to the semi-persistent scheduled PUSCH transmission, j=1 corresponds to the dynamic scheduled PUSCH transmission, and j=2 corresponds to the random access response scheduled PUSCH transmission (the PUSCH transmission scheduled by the random access); α is the cell-specific path loss compensation factor. When j=0 or 1, α(j)e{0, 0.4, 0.5, 0.6, 0.7, 0.8, 0.9, 1}, and when j=2, α(j)=1. α=1 is full path loss compensation, and α<1 is partial path loss compensation; PL is the estimated downlink path loss that is measured and computed at the UE; Δ^(i) is a reported power offset for the modulation coding scheme (MCS); ef(i) is the current PUSCH power control setting state. According to the setting of the highest layer parameter, in the case of accumulated value power control,
and in the case of absolute value power control,
is a UE-specific closed loop correction value, which is also called the transmit power control command (TPC).
[004] In the LTE system, the PUCCH transmit power of the UE in subframe i is defined as:
in which, the definition of P is the same as that mentioned above;
is the PUCCH transmit power which is estimated by the UE according to the base station's open loop and closed loop power control instructions, the path loss estimate, and the PUCCH format sent in subframe i; P is an open circuit power control parameter, which is the sum of a cell specific value P and a specific value of O_NOMINAL_ PUCCH UE P ; O_UE_PUCCH ; Δ (F) is a reported power offset for the PUCCH (F) format, which is configured by the highest layer; h(n) is a value based on the PUCCH(F) format, in which, n is the CQI bit number information, and n is the HARQ bit number; eg(i) is the current PUCCH power control setting state,
. ^PUCCH is a UE-specific closed loop correction value, which is also called the transmit power control command (TPC).
[005] It should be noted that in the LTE system, in order to maintain the single-carrier character of the uplink signal, for the same UE, the PUSCH and PUCCH cannot be transmitted at the same time.
[006] To make the base station know the margin between the configured maximum output power that is defined by some UE at the given time and the estimated transmission power of the PUSCH that is programmed by the base station, so as to allow the base station know when the UE is power limited, providing the basis for the base station to schedule the resource scheduling and link adaptation of the PUSCH for the next time, and schedule the proper modulation coding scheme and bandwidth for the UE, and the UE needs to measure the power headroom (PH) of itself and report the same to the base station. In the LTE system, the power headroom of a given UE in subframe i is defined as:
which is the difference between the configured maximum output power defined by the UE and the transmit power of the PUSCH estimated by the UE. The power headroom that is obtained by measurement and computation is quantified with the range of [40,-23]dB, to the extent of 1dB as precision (the quantization ratio is shown in Table 1), and then transferred to the highest layer by the physical layer. The media access control layer (MAC layer layer for short) uses the 6-bit index to represent the quantized power headroom. The mapping relationship is shown in Table 1, and the 6-bit index is also called the power headroom.
[007] In addition, a power headroom report (PHR) is triggered by event. When the UE has PUSCH retransmission in the current subframe, there is event triggering the PHR, and the channel resource that the base station allocates for the PUSCH transmission of the UE is, according to a determined priority of the logical channels, sufficient to support the power headroom MAC control element and MAC protocol data unit (PUD) subheader thereof, the UE reports a 6-bit power headroom to the base station through the MAC control element of power headroom.
[008] The structure of the power headroom MAC control element is shown in Fig. 1. It is an octet, in which the upper 2 bits are reserve bits (R) set to 0, and the lower 6 bits are the reported power headroom (PH).
[009] It should be noted that in the LTE system, only the free height of power of the subframes that transmits the PUSCH is measured.
[010] Table 1: Power headroom free height quantification and report mapping diagram

[011] The LTE-Advanced system (called the LTE-A system for abbreviation) is the next generation evolution system of the LTE system. As shown in Fig. 2, LTE-A system adopts carrier aggregation technology to expand the transmission bandwidth. Each aggregate transporter is called a “component transporter”. Several component conveyors can be continuous or discontinuous, and can be on the same operating band or on different operating bands.
[012] In the LTE-A system, the user equipment can transmit PUSCHs on one component carrier (uplink), and can also simultaneously transmit several PUSCHs on several component carriers (uplink); and one or several PUCCHs can be transmitted on a component carrier (uplink). Furthermore, it is proposed in the PUCCH search in the LTE-A system that the PUSCH and PUCCH are simultaneously transmitted on a component carrier (uplink).
[013] Therefore, how to measure and report the power headroom in the LTE-A system that adopts conveyor aggregation becomes a problem to be readily solved. Invention Summary
[014] The invention mainly aims to provide a method to process power headroom and a terminal thereof, so as to at least solve the above problem.
[015] According to an aspect of the present invention, a method for processing the power headroom is provided, comprising: when transmitting the PUSCH and/or the PUCCH in the subframe and component carrier group, a terminal measuring the headroom of subframe power and the component carrier group; and the terminal reporting power headroom to a base station and indicating the type of power headroom reported in the report.
[016] According to another aspect of the present invention, a terminal is provided, comprising: a measurement module configured to measure the free height of power in the subframe and the component carrier group, when transmitting the PUSCH and/or the PUCCH in the subframe and the component carrier group; and a transmission module configured to report power headroom to the base station and which indicates the type of power headroom reported in the report.
[017] By the present invention, because the terminal also reports the type of the power headroom while reporting the power headroom, the problem that the reported power headroom cannot be distinguished in the related technology is solved. Thus, the type to which the power headroom belongs is specifically indicated by the type report while reporting the power headroom, avoiding confusion. Brief description of the drawings
[018] The drawings described herein are used to provide further understanding of the present invention, and form part of the application. The exemplary embodiment and description of the present invention are used to explain the invention, and do not make an undue limit on the invention. In the drawings: Fig. 1 shows a structural diagram of power headroom MAC control element in LTE system according to the related technology; Fig. 2 shows a diagram of the conveyor aggregation of the LTE-A system according to the related technology; Fig. 3 shows a flowchart of a method for processing power headroom according to the embodiment of the present invention; and Fig. 4 shows a diagram of a terminal according to the embodiment of the present invention. Detailed description of the present invention
[019] The present invention is described below in detail with reference to the drawings in combination with the embodiments. It should be noted that the modalities and features of the same in the order can be combined with each other under the condition that there is no conflict.
[020] Fig. 3 shows a flowchart of a method for processing power headroom according to an embodiment of the present invention, comprising the following steps.
[021] Step 302: when transmitting the PUSCH and/or the PUCCH in the subframe and the component carrier group, the terminal measures the free height of power in the subframe and the component carrier group.
[022] Step 304: The terminal reports power headroom to a base station and indicates the type of power headroom reported in the report.
[023] In the modality, because the terminal measures the free height of power in the subframe and the component carrier group, when transmitting the PUSCH and/or PUCCH in the subframe and the component carrier group, the problem of measuring the free height of power in the LTE-A system is resolved, thus performing the measurement and reporting the terminal power headroom.
[024] Furthermore, because the terminal also indicates the type of power headroom while reporting power headroom, the problem that reported power headroom cannot be distinguished in the related technology is resolved. Thus, the type to which the power headroom belongs is specifically indicated by the type report while reporting the power headroom, avoiding confusion.
[025] The method for processing the power headroom provided by the present invention comprises the two parts, the measuring part and the reporting part: Part I. Power headroom measurement When transmitting the PUSCH and/or the PUCCH in the subframe i and the j component transporter group, the user equipment measures the free height of power PH(i, j) in subframe i and the j component transporter group, in which,
and the value of N is equal to the number of the component carriers group that is prescribed in the LTE-A protocol.
[026] Specifically, if each component carrier group includes only one component carrier, then N is equal to the number of component carriers.
[027] It comprises the following cases.
[028] 1) The user equipment only transmits the PUSCH in the subframe i and the component carrier group j.
[029] When only transmit the PUSCH in subframe i and the transport group of component j, the user equipment measures the free height of power PH (i, j) [dB] in the subframe i and the transport group of component j.
[030] That the user equipment only transmits the PUSCH in subframe i and the component carrier group j means that the user equipment transmits, in subframe i, a PUSCH on a component carrier in the component carrier group j, or transmits several PUSCHs respectively on multiple component carriers (ie, it transmits a PUSCH on each component carrier on the various component carriers), and the user equipment does not transmit the PUCCH on any component carriers in component carrier group j.
[031] Assuming that the PUSCH transmit power in subframe i and the component carrier group j, which is estimated by the user equipment, is P' (i, j) [dBm], and the configured maximum output power that is determined by the user equipment in subframe i and the j component transporter group is P ( j) [dBm], the power headroom that is measured by the user equipment in subframe i and the j component transporter group is:
which is the difference between the configured maximum output power that is determined by the user equipment in subframe i and the j component carrier group and the transmit power of the PUSCH transmitted in subframe i and the j component carrier group that is estimated by the user equipment.
[032] Specifically, when the user equipment transmits several PUSCHs in the component carrier group j, PPUSCH (i, j) is the sum of the transmit powers of several PUSCHs that are estimated by the user equipment.
[033] If the estimated transmit power of the PUSCH on each component carrier in the component carrier group j is PPUSCH (i, k)[dBm], where ktK is the sequential number of each component carrier in the component carrier group j, so

[034] The transmission power P' (i, k) [dBm] of the PUSCH, which is estimated by the user equipment is that which is estimated by the user equipment according to the parameters and instructions of open circuit power control and base station loop, the path loss estimate, and the number of blocks of the PUSCH resource programmed in subframe i and component carrier k and so on.
[035] Specifically,
dBm] where, M(i,k) is the bandwidth of the PUSCH which is transmitted in subframe i and the component carrier k, and is represented by the number of blocks of the resource (RB); P(h,k) is an open-loop power control parameter on the k-component conveyor; α is the compensation factor for the specific path loss on the component conveyor k; PL is the estimate of the uplink and downlink path loss of the component carrier k, which is measured and computed at the UE; ΔTF(i,k) is the reported power offset for the modulation coding mode of the PUSCH transmitted in subframe i and component carrier k; ef(i,k) is the current power control setting state of the PUSCH transmitted in subframe i and component carrier k.
[036] 2) The user equipment only transmits the PUCCH in subframe i and the carrier group of component j.
[037] When only transmit the PUCCH in the subframe i and the transporter group of component j, the user equipment measures the free height of power PH (i, j) in the subframe i and the transporter group of component j.
[038] That the user equipment only transmits the PUCCH in subframe i and the component carrier group j means that the user equipment transmits, in subframe i, a PUCCH on a component carrier in the component carrier group j, including the equipment of user that transmits several PUCCHs on one component conveyor in component conveyor group j, and the user equipment does not transmit the PUSCH on any component conveyor in component conveyor group j.
[039] Assuming that the PUCCH transmit power in subframe i and the j component carrier group, which is estimated by the user equipment, is P' (i, j) [dBm], and the configured maximum output power that is determined by the user equipment in subframe i and the j component transporter group is P(j) [dBm], the power headroom that is measured by the user equipment in subframe i and the j component transporter group is:
which is the difference between the configured maximum output power that is determined by the user equipment in subframe i and the j component transporter group and the transmit power of the PUCCH transmitted in subframe i and the j component transporter group that is estimated by the user equipment.
[040] Specifically, when the user equipment transmits several PUCCHs in the j component carrier group, P' (i, j) is the sum of the transmit powers of several PUCCHs that are estimated by the user equipment.
[041] If the estimated PUCCH transmit power on each component carrier in the component carrier group j is P' (i, k) [dBm], where ktK is the sequential number of each component carrier in the component carrier group j, so

[042] If the estimated transmit power of the PUCCH on the component carrier k is P'(i,k) [dBm], several PUCCHs are transmitted on the component carrier k, and the estimated transmit power of each PUCCH is P UCCH (i,k,c)[dBm], where c;C is the sequential number of each PUCCH on the component carrier k, then
that is, when transmitting several PUCCHs in subframe i and a component carrier in component carrier group j, the user equipment estimates, as for the component carrier, the transmit power of each PUCCH transmitted on the component carrier, and the sum of the transmit powers of the PUCCHs transmitted on the component carrier is used as the transmit power of the physical uplink channel transmitted on the component carrier, which is estimated by the user equipment.
[043] The PPUCCH transmission power (i, k, c) of the PUCCH, which is estimated by the user equipment, is that which is estimated by the user equipment according to the instructions and parameters of open circuit power control and base station loop, and the path loss estimate, and the PUCCH format with the sequential number of c transmitted in subframe i and the component carrier k.
[044] Specifically,
P(k) is an open-circuit power control parameter on the k-component conveyor; ΔF pucCH(F) is a reported power offset for the PUCCH(F) format of the PUCCH with the sequential number of c transmitted in the subframe i and the component carrier ke is configured by the highest layer; h(n) is a value based on the PUCCH(F) format, where n is the CQI bit number information, and n is the HARQ bit number; eg(i, k, c) is the current power control setting state of the PUCCH with the sequential number of c transmitted in subframe i and the component carrier k.
[045] 3) The user equipment transmits simultaneously the PUSCH and the PUCCH in the subframe i and the carrier group of component j.
[046] Assuming that a user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and the transport group of component j, the user equipment measures the free height of power in subframe i and the transport group of component j.
[047] That the user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and the component carrier group j means that the user equipment transmits, in subframe i, the PUSCH on one or more component carriers in the component carrier group j , and transmits the PUCCH on a component carrier in component carrier group j.
[048] Assuming that the PUSCH transmit power in subframe i and the component carrier group j, which is estimated by the user equipment, is P' (i, j) [dBm], the estimated PUCCH transmit power is P' ( i, j) [dBm], and the configured maximum output power that is determined by the user equipment in subframe i and the j component transporter group is P ( j) [dBm], the free height of power that is measured by the user in subframe i and the j component transporter group is: a:
Or b:
Or c:

[049] Specifically, PCMAX(j) = PC'MAx( j)= PC''MAx( j) is the configured maximum output power which is determined by the user equipment in subframe i and the transporter group of component j; or PC'MAx(j) is the maximum output power configured in the component transporter group j, which is determined by the user equipment, assuming that the user equipment only transmits the PUSCH in the component transporter group j; in which, the transmission setting (including modulation order, transmission width position, transmission width setting (number of physical resource blocks occupied) and so on) of the PUSCH assumed to be transmitted is the same as the setting of the PUSCH transmitted in subframe i and the component carrier group j. ''
[050] Specifically, PCMAx(j) is the maximum output power configured in the component transporter group j, which is determined by the user equipment, assuming that the user equipment only transmits the PUCCH in the component transporter group j; in which, the transmission configuration (including modulation order, transmission width position, transmission width configuration, and so on) of the PUCCH assumed to be transmitted is the same as the configuration of the PUCCH transmitted in the subframe i and the carrier group of component j.
[051] Or d: PH (i, j) and PHPUCCH(i, j) , which is defined as the same as a and c. Or e: PHPUCCH+PUSCH(i,j) and PHPUCCH(i, j), which is defined as the same as b and c. Or f: PH (i, j) and PH (i, j) , which is defined as the same as a and c. Or g: PHp'uccH+puScH(i, j) and PHpuScH(i, j), which is defined as the same as b and c. Or h: PHpuccH+puScH (i, j) and PHpuScH (i, j) and PHpuccH (i, j) , which is defined as the same as a and c. Or i: PHpuccH+puScH (i, j) and PHpuScH (i, j) and PHpuccH (i, j) , which is defined as the same as b and c.
[052] Or, the type and number of the free height of powers that are measured by the user equipment in the subframe i and the component carrier group j are configured by the upper layer signaling.
[053] Specifically, when the user equipment transmits several PUSCHs in the component carrier group j, P' (i, j) is the sum of the various transmit powers of the various PUSCHs that are estimated by the user equipment.
[054] If the estimated PUSCH transmit power on each component carrier in the component carrier group j is P' (i,k) [dBm], where ktK is the sequential number of each component carrier in the carrier group of component j, then
'
[055] Specifically, when the user equipment transmits several PUCCHs in the j component carrier group, P' (i, j) is the sum of the various transmit powers of the various PUCCHs that are estimated by the user equipment.
[056] If the estimated PUCCH transmit power on each component carrier in the component carrier group j is P' (i,k) [dBm], where kt K is the sequential number of each component carrier in the carrier group of component j, so

[057] If the estimated PUCCH transmit power on component carrier k is P' (i, k) [dBm], several PUCCHs are transmitted on component carrier k, and the estimated transmit power of individual PUCCHs is p^ CH(i,k,c)[dBm], where ctC is the sequential number of each PUCCH in the component carrier k, then

[058] In these cases above, the component carrier group j is a group of component carriers composed of one or more component carriers. These component carriers can be used to send the uplink signal. Each component carrier group can include only one component carrier.
[059] Specifically, the component carrier group can include all component carriers that use the same power amplifier (PA) in the user equipment. The component carrier group can also include all component carriers supported by the user equipment.
[060] Part II. Power headroom report 1) If the user equipment only transmits the PUSCH in subframe i and the component carrier group j, the user equipment has new uplink transmission in subframe i, and there is an event that triggers the headroom reporting of power in subframe i and component j carrier group, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support a power headroom MAC control element that is used to report the power headroom in the subframe i and the component j carrier group and the MAC protocol data unit (PUD) subheader of it, then the user equipment reports the power headroom in the subframe i and the carrier group of component j, in subframe i; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier group j in subframe i.
[061] Furthermore, if the user equipment only transmits the PUSCH in subframe i and component j carrier group, and the user equipment has new uplink transmission in subframe i and component j transport group, and there is an event that triggers the report of the free height of power in subframe i and the j component transporter group, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i and the j component transporter group is sufficient to support an element of power headroom MAC control which is used to report the power headroom in the subframe i and the j component carrier group j and MAC protocol data unit (PUD) subheader of the same, then the user equipment reports in the subframe i and the component transport group j power clearance in subframe i and the component transport group j; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier group j in subframe i.
[062] The free height of power in the subframe i and the component transporter group j, which is reported by the user equipment, is PH(i,j) .
[063] 2) If the user equipment only transmits the PUCCH in subframe i and the component transporter group j, and the user equipment has new uplink transmission in subframe i+n, and there is an event that triggers the headroom report power in subframe i and the j component transporter group, then if the uplink resource allocated to the user equipment in subframe i+n is sufficient to support a power headroom MAC control element that is used to report the headroom of power in subframe i and the j component carrier group and MAC PDU subheader thereof, according to a determined priority of the logical channels, then the user equipment reports the power headroom in subframe i and the component j carrier group in subframe i ; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier group j in subframe i.
[064] Specifically, the i+n subframe is the first subframe in which the user equipment has new uplink transmission, after the i subframe.
[065] Furthermore, if the user equipment only transmits the PUCCH in subframe i and component j carrier group, and the user equipment has new uplink transmission in subframe i+n and component j carrier group, and there is an event that triggers the report of the power headroom in subframe i and the j component transporter group, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i+n and the j component transporter group is sufficient for support a power headroom MAC control element which is used to report the power headroom in subframe i and component j carrier group j and MAC PDU subheader of it, then the user equipment reports power headroom in the subframe i and the j component carrier group in subframe i; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier group j in subframe i.
[066] Specifically, the i+n subframe is the first subframe in which the user equipment has new uplink transmission in the j component carrier group, after the i subframe. The power headroom in subframe i and the component conveyor group j, which is reported by the user equipment,
[067] 3) The user equipment simultaneously transmits the PUSCH and PUCCH in the subframe i and the carrier group of component j. for Item a or b: if the user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and the component carrier group j, and the user equipment has new uplink transmission in subframe i, and there is an event that triggers the reporting of the power headroom in subframe i and the component j carrier group, then if the uplink resource allocated to the user equipment in subframe i is sufficient to support a power headroom MAC control element that is used to report headroom of power in subframe i and the j component carrier group j and MAC PDU subheader thereof, according to a determined priority of the logical channels, then the user equipment reports the power headroom in subframe i and the j component carrier group in the subframe i; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier group j in subframe i.
[068] Furthermore, if the user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and component j carrier group, and the user equipment has new uplink transmission in subframe i and component j carrier group, and there is an event that triggers power headroom reporting in subframe i and component j carrier group, so if the uplink resource allocated to user equipment in subframe i and component j carrier group is sufficient to support a MAC headroom control element of power which is used to report the power headroom in the subframe i and the component carrier group j and the MAC PDU subheader thereof, according to a determined priority of the logical channels, then the user equipment reports the power headroom in the subframe i and the j-component carrier group, in subframe i and the j-component carrier group; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier group j in subframe i.
[069] The power headroom in subframe i and the component transporter group j, which is reported by the user equipment, is: for a: PHPUCCH+PUSCH(i, j) ; for b: PHpuccH+puscH(i,j) . For Item ci: if the user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and the component transporter group j, and the user equipment has new uplink transmission in subframe i, and there is an event that triggers the headroom report of power in subframe i and component carrier group j, then I: according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support two free-height MAC control elements which are used to report the power headroom in subframe i and component j-component carrier group and MAC PDU subheader of the same, then the user equipment reports power headroom in subframe i and component j-component carrier group in subframe i; II: or else, according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support a power headroom MAC control element that is used to report height free power in subframe i and component carrier group j and MAC PDU subheader thereof, then user equipment reports power free height in subframe i and component carrier group j in subframe i; III: otherwise, the user equipment does not report the power headroom in subframe i and the component conveyor group j in subframe i.
[070] In addition, if the user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and component carrier group j, and the user equipment has new uplink transmission in subframe i and component carrier group j, and there is an event that triggers the power headroom report in subframe i and the component j carrier group, then I: according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i and the component j carrier group is sufficient to support two power headroom MAC control elements that are used to report the power headroom in subframe i and component j carrier group j and MAC PDU subheader of it, then the user equipment reports power headroom in subframe i and the j component carrier group, in subframe i and the j component carrier group; II: or else, according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i and the j component transporter group is sufficient to support a power headroom MAC control element that is used to report the power headroom in subframe i and the component j carrier group and MAC PDU subheader of it, then the user equipment reports the power headroom in subframe i and the component j carrier group in subframe i and the carrier group of component j; and III: otherwise, the user equipment does not report the power headroom in subframe i and the j-component transporter group in subframe i.
[071] In the situation of I, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is: for c: PHPUSCH (i, j) and PHPUCCH (i, j ) ; for d: PHpuccH+puscH(i, j) and PHPUCCH(i, j); for e: PHPUCCH+PUSCH(i, j) and PHPUCCH(i, j); for f: PHpuCCH+PUSCH (i, j) and PHPUSCH (i, j); for g: PHPUCCH+PUSCH (i, j) and PHPUSCH (i, j); or PHPUCCH+PUSCH (i, j) and PHPUCCH (i, j) ; where, in the case of h, when PHPu^+pu SCH( i, j) — 0 or PHpu^+puSCH(i, j) >0 , the power free height in subframe i and the component transport group j, which is reported by the user equipment in subframe i, is PHPUSCH(i,j) and PHPUCCH(i,j); and when PHPUCCH+PUSCH(i,j) < 0 or PH^^+PUSCH(i, j) ^ 0 , the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i , is PHPUCCH+PUSCH (i, j) and PHPUSCH(i,j) , or PHPUCCH+PUSCH (i, j) and PHPUCCH (i, j) ; or, when PHPUCCH+PUSCH(i, j)—0or PHPUCCH+PUSCH(i, j)>0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PH (i, j) and PHPUSCH (i, j) , or PHPUCCH + PUSCH (i, j) and PHPUCCH (i, j) ; when PHpucCH+PUSCH(i, j) <0or PHPUCCH+PUSCH(i, j) ~0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PHPUSCH( i,j) and PHPUCCH (i,j) .
[072] For i: PHPUSCH (i, j) and PHPUCCH (i, j) , or PHPUCCH+PUSCH (i, j) and PHPUSCH (i, j) , or PHPUCCH+PUSCH (i, j) and PHPUCCH(i , j) ; in the case of i, when PHPUCCH+PUSCH (i, j) —0 or PHPUCCH+PUSCH (i, j)>0' the free height of power in subframe i and the j component transporter group, which is reported by the user equipment in the subframe i, is PH' (i, j) and PHPUSCH (i, j), or PHPUCCH+PUSCH (i, j) and PHPUCCH (i, j); and when PHPUCCH+PUSCH(i,j) <0 or PHPUCCH+PUSCH(i,j) — 0 , the free height of Power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PHPUSCH(i, j) and PHPUCCH(i, j) ; or, when PHPUCCH+PUSCH (i, j) — 0 or PHPUCCH+PUSCH (i, j) >0' the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PHPUSCH(i, j) and PHPUCCH(i, j) ; and when PHPUCCH+PUSCH (i, j) <0or PHPUCCH+PUSCH (i, j) — 0, the free height of power in subframe i and the j component transporter group, which is reported by the user equipment in subframe i, is PH '(i,j) and
[073] In the situation of II, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is: for c: PHPUSCH (i, j) or PHPUCCH (i, j ) ; for d: PHPUCCH + PUSCH (i, j) or PHPUCCH (i, j); in which, in the case of d, when PH(i,j) — 0 or PH^^^PUSCH(i,j) >0 , the free height of power in subframe i and the transport group of component j, which is reported by the equipment of user in subframe i, is PHPUCCH+PUSCH (i, j) ; and when PHPUCCH+PUSCH(i, j) <0 or PHpu^+pusen(i, j) — 0 , the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PHPUCCH(i, j) ; or when PHPUCCH+PUSCH (i, j) — 0 or PHPUCCH+PUSCH (i, j)>0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PH(i,j); and when PHPUCCH+PUSCH(i, j) <0or PHPUCCH+PUSCH(i, j) — 0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PH (i,j) .
[074] For e: PHPUCCH+PUSCH (i, j) or PHPUCCH (i, j) ; in the case of e, when PHPUCCH+PUSCH (i, j) — 0or PHPUCCH+PUSCH (i, j) >0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in the subframe i, is PH' (i, j); and when PHPUCCH+PUSCH(i , J) < 0 or PHPUCCH+PUSCH (i , j ) — 0' the free height of power in subframe i and the j component transporter group, which is reported by the user equipment in subframe i, is PHPUCCH (i,j); or when PHpuccH+puSCH (i,j) — 0 or PHPUCCH+PUSCH (i,j) > 0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PH (i,j); when PHPUCCH+PUSCH(i,j) <0or PHPUCCH+PUSCH(i,j) — 0' the free height of power in subframe i and the j component transporter group, which is reported by the user equipment in subframe i, is PH' (i,j) .
[075] For f: PHPUCCH + PUSCH (i, j) or PHPUSCH (i, j) ; in the case of f, when PHPUCCH+PUSCH (i, j) —0 or PHPUCCH+PUSCH (i, j)>0, the free height of power in subframe i and the transport group of component j, which is reported by the user equipment in the subframe i, is PHPUSCH(i, j) ; and when PHPUCCH+PUSCH(i,j) <0 or PHPUCCH+PUSCH(i,j)s0. the power headroom in subframe i and the component carrier group j, which is reported by the user equipment in subframe i, is PH(i,j); or when PHPUCCH+PUSCH(i, j) — 0 or PHPUCCH+PUSCH(i, j) >0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PH (i,j); when PHPUCCH+PUSCH(i, j) <0or PHPUCCH+PUSCH(i, j) ~0, the free power height in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PHPUSCH( i, j) .
[076] For g: PHPUCCH+PUSCH (i, j) or PHPUSCH (i, j); in the case of g, when PHPUCCH+PUSCH(i , j ) — 0 or PHPUCCH+PUSCH(i , j ) >0' the power headroom in subframe i and the component transporter group j, which is reported by the user equipment in the subframe i, is PHPUSCH(i, j) ; when PHPUCCH+PUSCH(i,j)<0or PHPUCCH+PUSCH(i,j) ^0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PH' (i,j); or when PHPUCCH+PUSCH(i,J) — 0 or PHPUCCH+PUSCH(i,j) > 0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PH '(i,j) ; when PHPUCCH+PUSCH(i,j) <0 or PHPUCCH+PUSCH(i,j) —0 , the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PHPUSCH (i,j) .
[077] For h: PH',.,'<i,j) or PH,''(i,j) or PHPUCCH.PUSCHCi,j); in the case of h, when PHPUCCH+PUSCH (i, j) — 0or PHPUCCH+PUSCH (i, j) >0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in the subframe i, is PH (i, j) or PHPUCCH(i, j) ; when PHPUCCH+PUSCH(i, j) <0or PHPUCCH+PUSCH(i, j) — 0, the free height of power in subframe i and the j component transporter group, which is reported by the user equipment in subframe i, is PH ( i, j); or, when PHPUCCH+PUSCH(i, j) — 0 or PHPUCCH+PUSCH(i, j) >0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PH(i,j); when PHPUCCH+PUSCH(i,j) < 0 or PHPUCCH+PUSCH(i, j) — 0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PHPUSCH (i, j) or PHPUCCH(i, j) .
[078] For i: PHPUSCH (i, j) or PHPUCCH (i, j) or PHPUCCH+PUSCH (i, j) ; in the case of i, when PHPUCCH+PUSCH(i ,j) — 0 or PHPUCCH+PUSCH(i ,j) > 0, the power headroom in subframe i and the component transporter group j, which is reported by the user equipment in the subframe i, is PH' (i, j); when PHP'UCCH+PUSCH (i, j) < 0 or PHP'UCCH+PUSCH (i, j) — 0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in the subframe i, is PHPUSCH (i, j) or PHPUCCH(i, j) ; or when PHPUCCH+PUSCH(i,j)^0 or PHPUCCH+PUSCH(i,j)>0, the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PHPUSCH(i, j) or PHPUCCH(i, j) ; when PHPUCCH+PUSCH(i, j) <0 or PHPUCCH+PUSCH(i,j) ^ 0 , the free height of power in subframe i and the component transporter group j, which is reported by the user equipment in subframe i, is PH '(i,j) .
[079] Or, in the situation of I and II, the type of power headroom in subframe i and the component j carrier group, which is reported by the user equipment, is configured by the upper layer signaling, where the height type reported power free indicates the result of a given power head height calculated by adopting one of the above algorithms.
[080] The user equipment indicates the type of the reported power headroom while reporting the power headroom to the base station, with the user equipment reporting the power headroom through the headroom MAC control element of power.
[081] In addition, the user equipment indicates the type of power headroom reported in the power headroom MAC control element while reporting the power headroom to the base station.
[082] In addition, the highest bit and/or the secondarily highest bit in the power headroom MAC control element is/is used to indicate the type of reported power headroom.
[083] The above type represents that the corresponding power headroom is PH pUSCH (i, j) or PH pUCCH (i, j) or PHpUCCH+pUSCH (i, j) or PHpUCCH+pUSCH (i, j) .
[084] For example, the highest bit or secondarily highest bit in the power headroom MAC control element is set to 0 to indicate the reported power headroom is PHpUSCH (i, j) .
[085] The highest bit or secondarily highest bit in the power headroom MAC control element is set to 1 to indicate the reported power headroom isPHPUCCH(i,j) .
[086] Or, the highest bit or secondarily highest bit in the power headroom MAC control element is set to 0 to indicate the reported power headroom is PHP USCH (i, j) .
[087] The highest bit or secondarily highest bit in the power headroom MAC control element is set to 1 to indicate the reported power headroom is PHPUCCH+PUSCH (i, j) (or PHPUCCH+PUSCH (i,j) ).
[088] Or, the highest two bits in the power headroom MAC control element are set to 00 to indicate the reported power headroom is
[089] The highest two bits in the power headroom MAC control element are set to 01 or 10 or 11 to indicate the reported power headroom is PHPUCCH (i, j) .
[090] Or, the highest two bits in the power headroom MAC control element are set to 00 to indicate the reported power headroom is
[091] The highest two bits in the power headroom MAC control element are set to 01 or 10 or 11 to indicate the reported power headroom is PHPUCCH+PUSCH (i, j) (or PHPUCCH+PUSCH ( i, j) ).
[092] Or, the highest two bits in the power headroom MAC control element are set to 00 to indicate the reported power headroom is PHPUSCH (i, j) .
[093] The highest two bits in the power headroom MAC control element are set to 01 or 10 or 11 to indicate the reported power headroom isPHPUCCH(i, j).
[094] The highest two bits in the power headroom MAC control element are set to 10 or 11 or 01 to indicate the power headroom (i, j) (or PHPUCCH+PUSCH (i, j) ) .
[095] Hereinafter, the present invention is explained under the specific situation that the component carrier group includes only one component carrier.
[096] Part I. Component Conveyor Power Headroom Measurement When each component conveyor group includes only one component conveyor, the user equipment measures the power headroom on each component conveyor.
[097] A) Assuming that a user equipment only transmits the PUSCH in subframe i and the component carrier k without transmitting the PUCCH, the user equipment measures the free height of power PH (i, k) in subframe i and the component carrier k .
[098] Assuming that the PUSCH transmit power in subframe i and the component carrier k, which is estimated by the user equipment, is P' (i, k) [dBm], and the configured maximum output power which is determined by the user equipment on subframe i and the component carrier k is P(k)[dBm], the free height of power that is measured by user equipment on subframe i and the component carrier k is:
which is the difference between the configured maximum output power that is determined by the user equipment in the i-subframe and the k-component carrier and the transmit power of the transmitted PUSCH in the i-subframe and the k-component carrier that is estimated by the user equipment.
[099] B) Assuming that a user equipment only transmits the PUCCH in subframe i and the component carrier k without transmitting the PUSCH, the user equipment measures the free height of power PHPUCCH(i,k) in subframe i and the component carrier k .
[0100] Assuming that the PUCCH transmit power in subframe i and the component carrier k, which is estimated by the user equipment, is P' (i, k) [dBm], and the configured maximum output power which is determined by user equipment on subframe i and the component carrier k is P(k)[dBm], the free height of power that is measured by user equipment on subframe i and the component carrier k is:
which is the difference between the configured maximum output power that is determined by the user equipment in subframe i and the k component carrier and the transmit power of the PUCCH transmitted in subframe i and the k component carrier that is estimated by the user equipment.
[0101] If several PUCCHs are transmitted on the component carrier k, and the transmit power of each PUCCH channel, which is estimated by the user equipment, is P^CH(i,k,c) [dBm], in which, c<C is the sequential number of each PUCCH on the component carrier k, so

[0102] C) Assuming a user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and the component carrier k, the user equipment measures the free height of power in subframe i and the component carrier k.
[0103] Assuming that the PUSCH transmit power in subframe i and the component carrier k, which is estimated by the user equipment, is P' (i, k) [dBm], and the estimated PUCCH transmit power is P' (i, k) [dBm], and the configured maximum output power that is determined by the user equipment on the component conveyor k is P (k)[dBm], the power headroom that is measured by the user equipment on the subframe i and the component carrier k is: a:
or b:
or c:
Specifically, PCMAX( j) = PC'MAX( j) = PC''MAX( j) is the configured maximum output power that is determined by the user equipment in subframe i and the component carrier k; Specifically, PC'MAX(k) is the maximum output power configured on the component carrier k that is determined by the user equipment, assuming that the user equipment only transmits the PUSCH on the component carrier k; Specifically, the transmission configuration of (including modulation order, transmission width position, transmission width configuration, and so on) of the PUSCH assumed to be transmitted is the same as the configuration of the PUSCH transmitted in subframe i and the component carrier k; Specifically, PC''MAX(k) is the maximum output power configured on the component carrier k that is determined by the user equipment, assuming that the user equipment only transmits the PUCCH on the component carrier k; Specifically, the transmission configuration (including modulation order, transmission width position, transmission width configuration, and so on) of the PUCCH assumed to be transmitted is the same as the configuration of the PUCCH transmitted in subframe i and component carrier k ; or d: PH (i, k) and PH (i,k) , which are respectively defined in the same way as Items a and c; or e: PH' (i,k) and PH (i,k) , which are respectively defined in the same way as Items b and c; or f: PH (i, k) and PH (i, k) , which are respectively defined in the same way as Items a and c; or g: PH' (i,k) and PH (i,k), which are respectively defined in the same way as Items b and c; or h: respectively defined in the same way as Items a and c; or i: respectively defined in the same way as Items b and c; or, the type and number of the power headroom that is measured by user equipment in subframe i and component carrier k are configured by upper layer signaling.
[0104] If several PUCCHs are transmitted on the k component carrier, and the transmit power of each PUCCH, which is estimated by the user equipment, is p'l((ll(i,k,c) [dBm], no which, + C is the sequential number of each PUCCH on the component carrier k, so

[0105] Part II. Component Carrier Power Headroom Report 1) If the user equipment only transmits PUSCH in subframe i and the component carrier k, and the user equipment has new uplink transmission in subframe i, and there is an event that triggers the reporting of the power headroom in subframe i and the component carrier k, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support a MAC headroom control element of power which is used to report the power headroom in subframe i and the component carrier k and MAC protocol data unit (PUD) subheader thereof, then the user equipment reports the power headroom in subframe i and the component k, in subframe i; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier k in subframe i.
[0106] Or, if the user equipment only transmits the PUSCH in subframe i and the component carrier k, and the user equipment has new uplink transmission in subframe i and the component carrier k, and there is an event that triggers the headroom report of power in the i-subframe and the k-component carrier, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in the i-subframe and the k-component carrier is sufficient to support a high MAC control element power headroom which is used to report the power headroom in subframe i and the component carrier k and MAC protocol data unit (PUD) subheader thereof, then the user equipment reports the power headroom in subframe ieo k-component carrier in subframe i and k-component carrier; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier k in subframe i. The power headroom in subframe i and the component carrier k, which is reported by the user equipment, is PHPUSCH(i,k) .
[0107] 2) If the user equipment only transmits PUCCH on the i subframe and the k component carrier, and the user equipment has new uplink transmission on the i+n subframe, and there is an event that triggers the power headroom report on the subframe i and the component carrier k, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in the i+n subframe is sufficient to support a power headroom MAC control element that is used to report the power headroom in subframe i and the component carrier k and MAC PDU subheader thereof, then the user equipment reports the power headroom in subframe i and the component carrier k, in subframe i; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier k in subframe i.
[0108] Specifically, the i+n subframe is the first subframe in which the user equipment has new uplink transmission, after the i subframe.
[0109] Or, if the user equipment only transmits PUCCH on subframe i and component carrier k, and the user equipment has new uplink transmission on subframe i+n and component carrier k, and there is an event that triggers height reporting free of power in subframe i+n and component carrier k, then according to a determined priority of the logical channels, if the uplink resource allocated to user equipment in subframe i+n and component carrier k is sufficient to support a control element Power headroom MAC which is used to report power headroom in subframe i and component carrier k and MAC PDU subheader of the same, then user equipment reports power headroom in subframe i and component carrier k, in subframe i and the k component carrier; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier k in subframe i.
[0110] Specifically, the i+n subframe is the first subframe in which the user equipment has new uplink transmission on the k component carrier, after the i subframe.
[0111] The free height of power in subframe i and the component carrier k, which is reported by the user equipment, is PH(i, j) .
[0112] (3) For Item a or b: if the user equipment simultaneously transmits PUCCH and PUSCH in subframe i and component carrier k, and the user equipment has new uplink transmission in subframe i+n, and there is an event that triggers the reporting of the power headroom in subframe i and the component carrier k, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support an element of power headroom MAC control which is used to report the power headroom in subframe i and the component carrier k and MAC PDU subheader of it, then the user equipment reports the power headroom in subframe i and the component carrier k, in subframe i; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier k in subframe i. Or, if the user equipment simultaneously transmits PUCCH and PUSCH on subframe i and component carrier k, and the user equipment has new uplink transmission on subframe i+n and component carrier k, and there is an event that triggers the reporting of the free height of power in subframe i and component carrier k, then according to a determined priority of the logical channels, if the uplink resource allocated to user equipment in subframe i and component carrier k is sufficient to support a MAC control element of power headroom which is used to report the power headroom in subframe i and the component carrier k and MAC PDU subheader of the same, then the user equipment reports the power headroom in subframe i and the component carrier k, in the subframe i and the k component carrier; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier k in subframe i.
[0113] The free height of power in subframe i and the component carrier k, which is reported by the user equipment, is: for ci: if the user equipment simultaneously transmits the PUCCH and the PUSCH in the subframe i and the component carrier k, and the user equipment has new uplink transmission in the i+n subframe, and there is an event that triggers the power headroom report in the i and the component carrier k, then I: according to a determined priority of the logical channels, if the uplink resource allocated to user equipment in subframe i is sufficient to support two power headroom MAC control elements which are used to report power headroom in subframe i and component carrier k and MAC PDU subheader of the same , then the user equipment reports the power headroom in subframe i and the component carrier k in subframe i; II: or else, according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support a power headroom MAC control element that is used to report height free power in subframe i and the component carrier k, then the user equipment reports the free height of power in subframe i and the component carrier k in subframe i; III: otherwise, the user equipment does not report the power headroom in subframe i and component carrier k in subframe i.
[0114] Or, if the user equipment simultaneously transmits PUCCH and PUSCH in subframe i and component carrier k, and the user equipment has new uplink transmission in subframe i+n and component carrier k, and there is an event that triggers the report of the power headroom in subframe i and the component carrier k, then IV: according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i and the component carrier k is sufficient to support two power headroom MAC control elements which are used to report the power headroom in subframe i and the component carrier K and MAC PDU subheader of the same, then the user equipment reports the power headroom in subframe i and the carrier of component k, in subframe i and the carrier of component k; V: : or else, according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support a power headroom MAC control element that is used to report the power headroom on subframe i and the component carrier k, then the user equipment reports the power headroom on subframe i and the component carrier k, on subframe i and the component carrier k; VI: : otherwise, the user equipment does not report the power headroom in subframe i and component carrier k in subframe i.
[0115] In the situation of I, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is: for c: PHPUSCH(i,k) and PHPUCCH(i,k) ; for h: PHPUSCH(i,k) and PHPUCCH(i,k) , or PHPUCCH+PUSCH (i,k) and
[0116]Specifically, when PHPUCCH+PUSCH(i, j) — 0 or PHPUCCH+PUSCH(i,k)>0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i , is PHPUSCH(i,k) and when PHPUCCH+PUSCH(i,k) <0or PHPUCCH+PUSCH(i,k) <0, the free height of power in subframe i and the component carrier k, which is reported by the user in subframe i, éPH (i,k) and PH (i,k) , or
[0117]Specifically, when PHPUCCH+PUSCH(i, j) - 0 or PHPUCCH+PUSCH(i,k) > 0, the power headroom in subframe i and the component carrier k, which is reported by the user equipment in subframe i , is PH(i,k) and when PHpuCCH+PUSCH(i,k) <0 or PHPUCCH+PUSCH(i,k)— 0, the free height of power in subframe i and component carrier k, which is reported by the equipment of user in subframe i, is PHPUSCH(i,k) and PHPUCCH(i,k) .
[0118] For i: PHpuscH (i, k) and PHpuccH (i, k) , or PHPUCCH+PUSCH (i, k) and PHPUSCH (i, k) , or PHPUCCH+PUSCH(i, k) and PHPUCCH (i , k ) ; specifically, when PHPUCCH+PUSCH( i , k) £ 0 or PHPUCCH+PUSCH( i , k) >0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH' (i,k) and when PHPUCCH+PUSCH(i , k) <0or PHPUCCH+PUSCH(i , k) — 0, the free height of power in the subframe i and the component carrier k, which is reported by the user equipment in subframe i, it is PHPUSCH(i,k) and PHPUCCH(i,k) .
[0119] Specifically, when PHP'UCCH+PUSCH(i,k) £0 or PHP'UCCH+PUSCH(i,k) >0, the power headroom in subframe i and the component carrier k, which is reported by the equipment of user in subframe i, is PHPUSCH (i, k) and PHPUCCH (i, k) ; and when PHPUCCH+PUSCH(i, k) <0or PHPUCCH+PUSCH(i, k) — 0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH' (i,j) and PH(i,k), or
[0120] In the situation of II, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is: for c: PHPUSCH(i,k) or PHPUCCH (i,k) ; specifically, when PHPUCCH+PUSCH(i, j) >0 or PHPUCCH+PUSCH(i, k) >0 , the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH(i,k); and when PHPUCCH+PUSCH(i,k) <0 or PHPUCCH+PUSCH(i,k) — 0 , the free height of power in subframe i and the component carrier k, which is reported by
[0121]Specifically, when PHPUCCH+PUSCH(i, j) >0 or PHPUCCH+PUSCH(i, k) >0 , the power headroom in subframe i and the component carrier k, which is reported by the user equipment in the subframe i, is PH(i,k); and when PHPUCCH+PUSCH(i, k) < 0 or PHPUCCH+PUSCH(i, k) —0 , the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH ( i,k) . (i,j) or PHpuccH (i,k); specifically, when PHPUCCH+PUSCH(i,k) >0 or PHPUCCH+PUSCH(i,k) >0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, isPH '(i,k); when PHPUCCH+PUSCH(i,k)<0 or PHPUCCH+PUSCH(i,k) —0 , the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH ( i,k) .
[0122] Specifically, when PHpuccH+puscH (i, k) >0 or PHpuccH+puscH (i, k) >0 , the free height of power in subframe i and component carrier k, which is reported by user equipment in the subframe i, is PH(i,k); when PHpuccH+puscH(i,k) <0 or PHPUCCH+PUSCH(i,k) — 0' the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH' (i,k) . For f: PHPUCCH+PUSCH(i,k) or PHPUSCH specifically, when PHPUCCH+PUSCH(i,j) — 0or PHPUCCH+PUSCH(i,k) >0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH (i, k) ; when PHPUCCH+PUSCH(i,k) < 0 or PHPUCCH+PUSCH(i,k) — 0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH(i ,k) .
[0123] Specifically, when PHPUCCH+PUSCH(i,j) — 0 or PHPUCCH+PUSCH(i,k) >0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i , is PH(i,k); when PHPUCCH+PUSCH(i,k) < 0 or PHPUCCH+PUSCH(i,k) — 0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PHpuscH(i ,k) .
[0124] For g: PHPUCCH+PUSCH(i, k) or PHPUSCH(i, k) ; specifically, when PHPUCCH+PUSCH(i,k) — 0 or PHPUCCH+PUSCH(i,k) >0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH(i,k); when PHPUCCH+PUSCH(i,k) <0or PHPUCCH+PUSCH(i,k) — 0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH' ( i,k) .
[0125] Specifically, when PHPUCCH+PUSCH(i,k) >0orPHPUCCH+PUSCH(i,k) >0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, isPH'(i,k); when PHPUCCH+PUSCH(i, k) <0or PHPUCCH+PUSCH(i, k) — 0' the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, éPH(i, k) .
[0126] For h: PHPUSCH(i, j) or PHPUCCH(i,k) or PHPUCCH+PUSCH(i,k) ; specifically, when PHPUCCH+PUSCH(i,j) >0or PHPUCCH+PUSCH(i,k) >0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PHpuSCH (i,k) or PHpuCCH (i,k); when PHPUCCH+PUSCH(i,k) < 0 or PHPUCCH+PUSCH(i,k) — 0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, isPH(i, k) .
[0127] Specifically, when PHPUCCH+PUSCH(i, j) >0or PHPUCCH+PUSCH(i,k) >0, the power headroom in subframe i and the component carrier k, which is reported by the user equipment in subframe i , is PH(i,k); when PHPUCCH+PUSCH(i,k) ^ 0 or PHPUCCH+PUSCH(i,k) — 0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH(i , k) or PH (i, k).
[0128] For i: PHPUSCH(i,k) or PHPUCCH(i,k) or PHPUCCH+PUSCH(i,k) ; specifically, when PHPUCCH+PUSCH( i , k) > 0 or PHPUCCH+PUSCH( i, k) > 0 , the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, isPH '(i,k); when PHPUCCH+PUSCH(i, k) <0or PHPUCCH+PUSCH(i, k)— 0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i, is PH(i , k) or PH (i, k).
[0129]Specifically, when PHPUCCH+PUSCH(i, k) >0or PHPUCCH+PUSCH(i, k) >0, the power headroom in subframe i and the component carrier k, which is reported by the user equipment in subframe i , is PH(i,k) or PHpuccH(i,k); when PHPUCCH+PUSCH(i, k) <0or PHPUCCH+PUSCH(i, k) — 0, power headroom in subframe i and the component carrier k, which is reported by the user equipment in subframe i, éPH' (i, j) .
[0130] Or, in the situation of I and II, the type of power headroom in subframe i and the component carrier k, which is reported by the user equipment, is configured by upper layer signaling.
[0131] The user equipment indicates the reported power headroom type while reporting the power headroom to the base station, with the user equipment reporting the power headroom through the headroom MAC control element of power.
[0132] In addition, the user equipment indicates the type of power headroom reported in the power headroom MAC control element while reporting the power headroom to the base station.
[0133] In addition, the highest bit and/or the secondarily highest bit in the power headroom MAC control element is/is used to indicate the type of reported power headroom.
[0134] For example, the highest bit or secondarily highest bit in the power headroom MAC control element is set to 0 to indicate the reported power headroom isPHPUSCH(i,k) .
[0135] The highest bit or secondarily highest bit in the power headroom MAC control element is set to 1 to indicate the reported power headroom éPH(i,k) .
[0136] Or, the highest bit or secondarily highest bit in the power headroom MAC control element is set to 0 to indicate the reported power headroom is PH(i,k) .
[0137] Setting the highest bit or the highest bit secondarily in the power headroom MAC control element as 1 to indicate the reported power headroom is PHPUCCH+PUSCH (i, k) (or PHPUCCH+PUSCH ( i, k) ).
[0138] Or, the highest two bits in the power headroom MAC control element as are set to 00 to indicate the reported power headroom éPH(i,k) .
[0139] The highest two bits in the power headroom MAC control element are set to 01 or 10 or 11 to indicate the reported power headroom éPH(i,k) .
[0140] Or, the highest two bits in the power headroom MAC control element are set to 00 to indicate the reported power headroom isPHPUSCH(i,k) .
[0141] The highest two bits in the power headroom MAC control element are set to 10 or 11 or 01 to indicate the reported power headroom is PHPUCCH+PUSCH (i, k) (or PHPUCCH+PUSCH ( i,k) ).
[0142] Or, the highest two bits in the power headroom MAC control element are set to 00 to indicate the reported power headroom is PHPUSCH(i,k) .
[0143] The highest two bits in the power headroom MAC control element are set to 01 or 10 or 11 to indicate the reported power headroom éPH(i,k) .
[0144] The highest two bits in the power headroom MAC control element are set to 10 or 11 or 01 to indicate power headroom (i, k) (or PHPUCCH+PUSCH (i , k) ) . Mod 1
[0145] It is assumed that an LTE-A system operates in a frequency division duplexing (FDD) mode, and there are two downlink component carriers D1 and D2, and two uplink component carriers U1 and U2 in the system.
[0146] A user equipment supports sending uplink signals on U1 and U2.
[0147] The user equipment measures the power headroom in the component carrying U1 and U2, respectively.
[0148] Assuming that the user equipment only transmits the PUSCH in subframe i and the component carrier U1, the user equipment measures the power headroom PH(i,1) in subframe i and the component carrier U1.
[0149] Assuming that the PUSCH transmit power in subframe i and the U1 component carrier, which is estimated by the user equipment, is P' (i,1) , and the configured maximum output power that is determined by the user equipment in the subframe i and component carrier U1 is P (1) , so the power headroom that is measured by the user equipment in subframe i and component carrier U1 is:

[0150] Assuming that the user equipment only transmits the PUSCH in subframe i and the component carrier U2, the user equipment measures the power headroom PH (i, 2) in subframe i and the component carrier U2.
[0151] Assuming that the PUSCH transmit power in the subframe i and the U2 component carrier, which is estimated by the user equipment, is PPUSCH (i,2), and the configured maximum output power that is determined by the user equipment in the subframe i and the U2 component conveyor is PCMAX (2), so the power headroom that is measured by the user equipment in subframe i and the U2 component conveyor is:

[0152] Assuming that the user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and the component carrier U2, the user equipment measures the free height of power in subframe i and the component carrier U2.
[0153] Assuming that the PUSCH transmit power in subframe i and the U2 component carrier, which is estimated by the user equipment, is PPUSCH(i,2), the estimated PUCCH transmit power is PPUCCH(i,2) , and the configured maximum output power that is determined by the user equipment on subframe i and the U2 component carrier is PCMAX (2), so the power headroom that is measured by the user equipment on subframe i and the U2 component carrier is:
Or

[0154] If the user equipment determines to report the power headroom in subframe i and the component carrier U2 in subframe i, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in the subframe i is sufficient to support a power headroom MAC control element which is used to report the power headroom in subframe i and component carrier U2, then the power headroom in subframe i and component carrier U2, which is reported by the user equipment in subframe i, is PHPUCCHjPUSCH(i,2) or PHPUCCHjPUSCH(i,2); otherwise, the user equipment does not report the power headroom in subframe i and component carrier U2 in subframe i.
[0155] The user equipment reports the power headroom via the power headroom MAC control element. User equipment indicates the type of reported power headroom while reporting power headroom to the base station. In this case, the highest bit and/or the secondarily highest bit in the power headroom MAC control element is/is used to indicate the type of the reported power headroom.
[0156] The highest two bits in the power headroom MAC control element are set to 00 to indicate the reported power headroom is
[0157] The highest two bits in the power headroom MAC control element are set to 01 (or 10 or 11) to indicate power headroom
[0158] Or, the highest two bits in the power headroom MAC control element are set to 01 (or 10 or 11) to indicate the reported power headroom isPHp'uccH+puScH(i,k) .
[0159] Or, the highest bit or secondarily highest bit in the power headroom MAC control element is set to 0 to indicate the reported power headroom isPH(i,k) .
[0160] The highest bit or secondarily highest bit in the power headroom MAC control element is set to 1 to indicate the reported power headroom is PHpuccH+puScH (i, k) (or PHpuccH+puScH (i,k) ). Modality 2
[0161] It is assumed that an LTE-A system operates in a frequency division duplexing mode, and there are two downlink component carriers D1 and D2, and two uplink component carriers U1 and U2 in the system.
[0162] A user equipment supports sending uplink signals on U1 and U2.
[0163] User equipment measures the power headroom in the component carrying U1 and U2, respectively.
[0164] Assuming that the user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and the component carrier U2, the user equipment measures the free height of power in subframe i and the component carrier U2.
[0165] Assuming that the PUSCH transmit power in subframe i and the U2 component carrier, which is estimated by the user equipment, is P'(i,2) , the estimated PUCCH transmit power is PPUCCH(i,2) , and the configured maximum output power that is determined by the user equipment in subframe i and the U2 component carrier is PCMAX (2), so the power headroom that is measured by the user equipment in the i subframe and the U2 component carrier is PHPUCCH ( i.2) and PHPUSCH (i.2):

[0166] If the user equipment determines to report the power headroom in subframe i and the component carrier U2 in subframe i, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in the subframe i is sufficient to support two power headroom MAC control elements that are used to report the power headroom in subframe i and component carrier U2, then the power headroom in subframe i and component carrier U2, which is reported by the user equipment in subframe i, is PHPUCCH(i,2) and PHPUSCH(i,2) ; or else, according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support a power headroom MAC control element that is used to report the headroom of power in the i-subframe and the U2 component carrier, then the free height of power in the i-subframe and the U2 component carrier, which is reported by the user equipment in the i-subframe, isPHPUCCH(i,2) or PHPUSCH(i,2); otherwise, the user equipment does not report the power headroom in subframe i and component carrier U2 in subframe i.
[0167] The user equipment reports the power headroom via the power headroom MAC control element. User equipment indicates the type of reported power headroom while reporting power headroom to the base station. In this case, the highest bit and/or the secondarily highest bit in the power headroom MAC control element is/is used to indicate the type of the reported power headroom.
[0168] The highest two bits in the power headroom MAC control element are set to 00 to indicate the reported power headroom isPHPUSCH(i,k) .
[0169] The highest two bits in the power headroom MAC control element are set to 01 (or 10 or 11) to indicate the reported power headroom éPH(i,k) .
[0170] Or, the highest bit or secondarily highest bit in the power headroom MAC control element is set to 0 to indicate the reported power headroom isPHPUSCH(i,k).
[0171] The highest bit or secondarily highest bit in the power headroom MAC control element is set to 1 to indicate the reported power headroom isPHPUCCH(i,k). Modality 3
[0172] It is assumed that an LTE-A system operates in a frequency division duplexing mode, and there are two downlink component carriers D1 and D2, and two uplink component carriers U1 and U2 in the system.
[0173] A user equipment supports sending uplink signals on U1 and U2.
[0174] The user equipment measures the power headroom in the component carrying U1 and U2, respectively.
[0175] Assuming that the user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and the component carrier U2, the user equipment measures the free height of power in subframe i and the component carrier U2.
[0176] Assuming that the PUSCH transmit power in subframe i and the U2 component carrier, which is estimated by the user equipment is P'(i,2) , the estimated PUCCH transmit power is PPUCCH(i,2) , and the configured maximum output power that is determined by the user equipment in subframe i and the U2 component carrier is PCMAX (2), so the power headroom that is measured by the user equipment in subframe i and the U2 component carrier is PH ( i, 2) and PH (i,2):

[0177] If the user equipment determines to report the power headroom in subframe i and the component carrier U2 in subframe i, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in the subframe i is sufficient to support two power headroom MAC control elements that are used to report the power headroom in subframe i and component carrier U2, then the power headroom in subframe i and component carrier U2, which is reported by the user equipment in subframe i, is PHPUSCH (i,2) and PHPUCCH+PUSCH (i,2); or else, according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support a power headroom MAC control element that is used to report the headroom of power in subframe i and component carrier U2, then the free height of power in subframe i and component carrier U2, which is reported by the user equipment in subframe i, is PHPUSCH(i,2) or PHPUCCH+PUSCH(i,2) ; specifically, when PH. . ...ji,2) ^ 0 or PH• -(i,2) >0, the free height of power in subframe i and component carrier U2, which is reported by the user equipment in subframe i, is PHpuscH(i, two) ; and when PHPUCCH+PUSCH(i,2) <0 or PHPUCCH+PUSCH(i,2) ^ 0, the free height of power in subframe i and component carrier U2, which is reported by the user equipment in subframe i is PH ( i,k); otherwise, the user equipment does not report the power headroom in subframe i and component carrier U2 in subframe i.
[0178] User equipment reports power headroom via the power headroom MAC control element. User equipment indicates the type of reported power headroom while reporting power headroom to the base station. In this case, the highest bit and/or the secondarily highest bit in the power headroom MAC control element is/is used to indicate the type of the reported power headroom.
[0179] The highest two bits in the power headroom MAC control element are set to 00 to indicate the reported power headroom
[0180] The highest two bits in the power headroom MAC control element are set to 01 (or 10 or 11) to indicate the reported power headroom is PHpuccH+puscH (i, k) .
[0181] Or, the highest bit or secondarily highest bit in the power headroom MAC control element is set to 0 to indicate the reported power headroom isPHPUSCH(i,k).
[0182] The highest bit or secondarily highest bit in the power headroom MAC control element is set to 1 to indicate the reported power headroom is PHPUCCH+PUSCH ( i, k). Modality 4
[0183] It is assumed that an LTE-A system operates in a frequency division duplexing mode, and there are two downlink component carriers D1 and D2, and two uplink component carriers U1 and U2 in the system.
[0184] A user equipment supports sending uplink signals on U1 and U2.
[0185] User equipment measures the power headroom in the component carrying U1 and U2, respectively.
[0186] Assuming that the user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and the component carrier U2, the user equipment measures the free height of power in subframe i and the component carrier U2.
[0187] Assuming that the PUSCH transmit power in subframe i and the U2 component carrier, which is estimated by the user equipment, is P' (i,2) , the estimated PUCCH transmit power is PPUCCH(i, 2) , and the configured maximum output power which is determined by the user equipment in subframe i and the U2 component transporter is PCMAX (2), so the power headroom which is measured by the user equipment in subframe i and the U2 component transporter is PHPUCCH( i.2) , PHPUSCH (i.2)


[0188] If the user equipment determines to report the power headroom in subframe i and the component carrier U2 in subframe i, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in the subframe i is sufficient to support two power headroom MAC control elements that are used to report the power headroom in subframe i and component carrier U2, then the power headroom in subframe i and component carrier U2, which is reported by the user equipment in subframe i, is PHPUCCH+PUSCH(i,2) and PHPUCCH(i,2); specifically, when PHPUCCH+PUSCH(i,2)^0 or PHPUCCH+PUSCH(i,2) >0, the free height of power in subframe i and component carrier U2, which is reported by the user equipment in subframe i is PHPUSCH (i,2) and PHPUCCH(i,2) ; and when PHPUCCH+PUSCH(i,2) < 0 or PHPUCCH+PUSCH(i,2)—0, the free height of power in subframe i and component carrier U2, which is reported by the user equipment in subframe i is PHPUCCH+PUSCH (i,2) and PHPUSCH (i,2) , or PHPUCCH+PUSCH (i,2) and PHPUCCH(i,2) ; or else, according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support a power headroom MAC control element that is used to report the headroom of power in the i-subframe and the U2 component carrier, so the free height of power in the i-subframe and the U2 component carrier, which is reported by the user equipment in the i subframe, is PHpuscH(i,2) or PHpuccH(i,2) or PHPUCCH +PUSCH(i,2) , specifically, when PHPuccH+PUScH(i,2) >0 or PHPUCCH+PUSCH(i,2) >0, the free height of power in subframe i and the component carrier k, which is reported by user equipment in subframe i is PHpuscH (i,2) ; and when PHPUCCH+PUSCH(i,2)<0or PHPUCCH+PUSCH(i,2) — 0, the free height of power in subframe i and the component carrier k, which is reported by the user equipment in subframe i is PH' ( i,2) . otherwise, the user equipment does not report the power headroom in subframe i and component carrier U2 in subframe i.
[0189] The user equipment reports the power headroom via the power headroom MAC control element. User equipment indicates the type of reported power headroom while reporting power headroom to the base station. In this case, the highest two bits in the power headroom MAC control element are used to indicate the type of reported power headroom.
[0190] The highest two bits in the power headroom MAC control element are set to 00 to indicate the reported power headroom
[0191] The highest two bits in the power headroom MAC control element are set to 01 to indicate the reported power headroom isPHpuccH(i, k) .
[0192] The highest two bits in the power headroom MAC control element are set to 10 or 11 to indicate the reported power headroom is PHPUCCH+PUSCH (i, k) . Modality 5
[0193] It is assumed that an LTE-A system operates in TDD mode, and there are five component carriers C0, C1, C2, C3 and C4 in the system, where C0 and C1 are in the same frequency band, C2 is in other frequency band, C3 and C4 are in the third frequency band.
[0194] A user equipment supports sending uplink signals on C0, C1, C2, C3 and C4.
[0195] User equipment measures the power headroom in the component carrying C0, C1, C2, C3 and C4, respectively.
[0196] Assuming that the user equipment only transmits the PUSCH in subframe i and the component carrier Ck, the user equipment measures the free height of power PH (i, k) in subframe i and the component carrier Ck, where k=0 , 1, 2, 3, 4.
[0197] Assuming that the PUSCH transmit power in subframe i and the component carrier Ck, which is estimated by the user equipment, is P' (i, k) , and the configured maximum output power that is determined by the user equipment in subframe i and the component carrier Ck is P(k), so the power headroom that is measured by the user equipment in subframe i and the component carrier Ck is

[0198] Assuming that the user equipment only transmits the PUCCH in the i subframe and the component carrier Ck, the user equipment measures the power headroom PH (i, k) in the i subframe and the component carrier Ck.
[0199] If the user equipment only transmits the PUSCH on subframe i and the component carrier k, and the user equipment has new uplink transmission on subframe i and the component carrier k, and there is an event that triggers the power headroom report in subframe i and the component carrier k, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i and the component carrier k is sufficient to support a free-height MAC control element of power which is used to report the power headroom in subframe i and the component carrier k and MAC protocol data unit (PUD) subheader thereof, then the user equipment reports the power headroom in subframe i and the component k, in subframe i and the carrier of component k; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier k in subframe i.
[0200] The free height of power in subframe i and the component carrier k, which is reported by the user equipment is PHPUSCH(i, k) .
[0201] Assuming that the PUCCH transmit power in subframe i and the component carrier Ck, which is estimated by the user equipment, is P' (i, k) , and the configured maximum output power that is determined by the user equipment in subframe i and the component carrier Ck is P(k), so the power headroom that is measured by the user equipment in subframe i and the component carrier Ck is

[0202] Assuming that the user equipment transmits three PUCCHs (channels) in subframe i and the component carrier Ck, the estimated transmission powers are P' (i, k, 0) , P' (i, k,1) and P ' (i, k, 2) , respectively, then 10 H i, k ,0)/10+10 - H i, k ,D/10+10 H i, k ,2V10J[dBm].

[0203] If the user equipment only transmits PUCCH on subframe i and component carrier Ck, and user equipment has new uplink transmission on subframe i+ne and component carrier Ck, and there is an event that triggers headroom reporting of power on subframe i and the component carrier Ck, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment on subframe i+n and the component carrier Ck is sufficient to support a MAC control element headroom which is used to report the power headroom in subframe i and the component carrier Ck and MAC PDU subheader thereof, then the user equipment reports the power headroom in subframe i and the component carrier Ck, in subframe i and the component carrier Ck; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier Ck in subframe i.
[0204] Specifically, the i+n subframe is the first subframe in which the user equipment has new uplink transmission after the first component carrier Ck; and the power headroom in subframe i and the j component conveyor group, which is reported by the user equipment,
[0205] Assuming that a user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and the component carrier Ck, the user equipment measures the free height of power in subframe i and the component carrier Ck.
[0206] Assuming that the transmit power of the PUSCH in subframe i and the component carrier Ck, which is estimated by the user equipment, is P' (i,k), the estimated transmit power of the PUCCH k is P' (i,k) , and the configured maximum output power that is determined by the user equipment in subframe i and the component conveyor Ck is P(k), then the power headroom that is measured by the user equipment in subframe i and the component conveyor Ck is

[0207] If the user equipment simultaneously transmits the PUSCH and PUCCH in subframe i and component carrier k, and the user equipment has new uplink transmission in subframe i and component carrier k, and there is an event that triggers height reporting free of power in subframe i and the component carrier k, then according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support two power-free MAC control elements which are used to report the power headroom in subframe i and the Ck component carrier, so the power headroom in subframe i and the Ck component carrier, which is reported by the user equipment in subframe i, is PHPUCCH(i,k) and PHP USCH(i,k) ; or else, according to a determined priority of the logical channels, if the uplink resource allocated to the user equipment in subframe i is sufficient to support a power headroom MAC control element which is used to report the headroom of power in subframe i and component carrier Ck, then the free height of power in subframe i and component carrier Ck, which is reported by user equipment in subframe i isPH(i,k) ; otherwise, the user equipment does not report the power headroom in subframe i and the component carrier Ck in subframe i.
[0208] The user equipment reports the power headroom via the power headroom MAC control element. User equipment indicates the type of reported power headroom while reporting power headroom to the base station. In this case, the highest bit and/or the secondarily highest bit in the power headroom MAC control element is/is used to indicate the type of the reported power headroom.
[0209] The highest two bits in the power headroom MAC control element are set to 00 to indicate the reported power headroom is PHP USCH (i, k) .
[0210] The highest two bits in the power headroom MAC control element are set to 01 (or 10 or 11) to indicate the reported power headroom éPH(i,k) .
[0211] Or, the highest bit or secondarily highest bit in the power headroom MAC control element is set to 0 to indicate the reported power headroom is PH(i,k) .
[0212] The highest bit or secondarily highest bit in the power headroom MAC control element is set to 1 to indicate the reported power headroom éPH(i,k) .
[0213] Fig. 4 shows a diagram of a terminal according to the embodiment of the present invention, comprising: a measurement module 10, configured to measure the free height of power in the subframe and the component carrier group, when transmitting the PUSCH and/or the PUCCH in the subframe and the component carrier group; and a transmission module 20, configured to report the power headroom to the base station, and indicating the type of power headroom reported in the report.
[0214] The terminal of this mode uses the method to process the power headroom of the above modalities to measure the power headroom and its type, and to report the measured power headroom and its type to the base station.
[0215] As can be seen from the above description that the invention performs the following technical effects: (1) it solves the power headroom measurement problem in the LTE-A system that adopts conveyor aggregation, and so achieves terminal power headroom measurement and reporting after adopting conveyor aggregation; and (2) because the terminal also reports power headroom type while reporting power headroom, the invention solves the problem in the related art that reported power headroom cannot be distinguished; and so the type to which the power headroom belongs is specifically indicated by the type report while reporting the power headroom, avoiding confusion.
[0216] Obviously, those skilled in the art should know that these steps and modules above of the present invention can be implemented by a general computing device, and they can be concentrated in single computing device or distributed in the network composed of several computing devices. Optionally, they can be implemented by executable program code by computational device. So they can be stored on the storage device to be run by the computing device. Under some conditions, the illustrated or described steps may be performed in a different order. Either these steps and modules can be implemented by transforming them into integrated circuit modules, respectively, or making several modules or steps into a single integrated circuit module. Thus, the invention is not limited to any specific combination of hardware and software.
[0217] The above is only the preferred embodiments of the present invention which is not intended to limit the invention. For those skilled in the art, the invention may have various changes and modifications. Any modifications, equivalent replacements, improvements and the like within the principle and spirit of the present invention shall fall within the scope of protection of the present invention.
权利要求:
Claims (13)
[0001]
1. Method for power headroom processing, comprising: in transmitting a physical uplink shared channel (PUSCH) and/or a physical uplink control channel (PUCCH) in a subframe and a component carrier group, a terminal that measures a free height of power in the subframe and the component conveyor group; and the terminal reporting power headroom to a base station and indicating a type of power headroom reported in the report; wherein when the terminal simultaneously transmits the PUSCH and PUCCH in the subframe and the component carrier group, the measured power headroom in the subframe and the component carrier group is one of:
[0002]
2. Method according to claim 1, characterized in that, if there is only the PUSCH transmitted in the component carrier group j, the PUSCH transmission configuration transmitted by the terminal is the same as the PUSCH configuration transmitted in the subframe i and the j component carrier group; and if there is only the PUCCH transmitted in the component carrier group j, the transmission configuration of the PUCCH sent by the terminal is the same as the configuration of the PUCCH transmitted in the subframe i and the component carrier group j; wherein both the PUSCH transmission configuration and the PUCCH transmission configuration comprise modulation order, transmission bandwidth position and transmission bandwidth configuration; or, when the measured power headroom is PH (i, j) or PH' (i, j) , and the terminal has a new uplink transmission in subframe i, and there is an event that triggers the power headroom report in the subframe i and the j component carrier group, the terminal reporting the power headroom to the base station comprises: according to the priority of the logical channels, whether the uplink resource allocated to the terminal in subframe i is sufficient to support an element of power headroom media access control (MAC) layer control which is used to report the power headroom in the subframe i and the j component carrier group j and the MAC protocol data unit subheader, then the terminal performs the PHPUCCH+PUSCH(i, j) or PHPUCCH+PUSCH(i,J) power headroom reporting operation in subframe i; or, when the measured power headroom is PH (i, j) or PH' (i, j) , and the terminal has new uplink transmission in subframe i and component j carrier group, and there is an event that triggers the reporting of the free height of power in subframe i and the carrier group of component j, the terminal reporting the free height of power to the base station comprises: according to the priority of the logical channels, if the uplink resource allocated to the terminal in subframe i and the carrier group of component j is sufficient to support a power headroom MAC control element that is used to report the power headroom in subframe i and the carrier group of component j and the protocol data unit MAC subheader, then the terminal performs the free height reporting operation of Power PHPUCCH+PUSCH(i,j) or PHPUCCH+PUSCH(Í,j) on subframe i and component carrier group j.
[0003]
3. Method according to claim 1, characterized in that PH (i, j) and PH (i, j) , and the terminal has a new uPlink transmission in subframe i, and there is an event that triggers the report of the free height of power in subframe i and the transport group of component j, the terminal reporting the free height of power to the base station understands: according to the Priority of the logical channels, if the uPlink resource allocated to the terminal in subframe i is sufficient To support two Power headroom MAC control elements that are used To report the Power headroom in the subframe ie the component transporter group j and the subheader of the MAC protocol data unit, then the terminal performs the reporting oPeration the free height of Power in subframe i; and according to the Priority of the logical channels, if the uPlink resource allocated to the terminal in subframe i is sufficient to support a power headroom MAC control element which is used to report the power headroom in subframe i and the group j component carrier and the MAC protocol data unit subheader, then the terminal performs the power headroom reporting operation on subframe i.
[0004]
4. Method according to claim 1, characterized in that when the measured power free height is PHPUSCH(i, j) and PHPUCCH(i, j) , or PH (i, j) and PH (i, j) , and the terminal has new uplink transmission in subframe i and component j carrier group, and there is an event that triggers power headroom reporting in subframe i and component j carrier group, the terminal reporting power headroom for the base station comprises: according to the priority of the logical channels, if the uplink resource allocated to the terminal in subframe i and the j component carrier group is sufficient to support two power headroom MAC control elements that are used to reporting the power headroom on subframe i and the j component carrier group and the MAC protocol data unit subheader, then the terminal performs the power headroom reporting operation on the subframe i and the carrier group of component j; and according to the priority of the logical channels, if the uplink resource allocated to the terminal in subframe i and the j component transporter group is sufficient to support a power headroom MAC control element that is used to report the headroom headroom. power on subframe i and the j component carrier group and the MAC protocol data unit subheader, then the terminal performs the power headroom reporting operation on subframe i and the j component carrier group.
[0005]
5. Method according to claim 3 or 4, characterized in that when the uplink resource allocated to the terminal is sufficient to support two power headroom MAC control elements that are used to report the headroom of power in the subframe i and the j component carrier group and the MAC protocol data unit subheader, the terminal reporting the power headroom to the base station further understands: when the measured power headroom is PH(i,j) and PH(i,j) and PH(i,j) , the power headroom in subframe i and the j component carrier group that is reported by the terminal in subframe i being when the measured power headroom is PH' (i, j) and PH (i, j) and PH (i, j) , the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i being
[0006]
6. Method according to claim 5, characterized in that the terminal mode determines the power headroom reported in subframe i and the component j carrier group comprises: when the measured power headroom is PH (i, j ) and when PHPUCCH+PUSCH (i, j) —0 or PHPUCCH+PUSCH (i, j)>0, the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PH (i ,j) and PH(i,j); and when PHPUCCH+PUSCH(i, j) <0or PHPUCCH+PUSCH(i, j) — 0, the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PHPUCCH+PUSCH(i , j) and PHPUSCH (i, j) , or PHPUCCH+PUSCH (i, j) and PHPUCCH (i, j) ; or when PHPUCCH+PUSCH (i, j) — 0 or PHPUCCH+PUSCH (i, j) >0, the free height of power in subframe i and component j-component carrier group which is reported power in subframe i and component j-component carrier group which is reported by the terminal in subframe i is PHP'UCCH+PUSCH (i, j) and PHPUSCH (i, j) , or or PHPU^+PUSCHCi, j) - 0 , the free height of power in subframe i and the component carrier group j which is reported by the terminal in subframe i is PHPUSCH (i, j) and PHPUCCH (i, j) ; or when PHPUCCH+PUSCH(i,j)^0or PHPUCCH+PUSCH(i,j)>0, the free height of power in subframe i and the component transporter group j that is reported by the terminal in subframe i is PHPUSCH(i,j ) and PHPUCCH (i, j); and when PHPUCCH+PUSCH (i, j) < 0 or PHPUCCH+PUSCH (i, j) — 0' the power free height in subframe i and the j component transporter group that is reported by the terminal in subframe i is PHPUCCH+PUSCH (i , j) and PHPUSCH (i, j) , or PHPUCCH+PUSCH (i, j) and
[0007]
7. Method according to claim 3 or 4, characterized in that when the uplink resource allocated to the terminal is sufficient to support a power headroom MAC control element that is used to report the headroom headroom power in the subframe i and the j component carrier group and the MAC protocol data unit subheader, the terminal reporting the power headroom to the base station further understands: when the measured power headroom is PH(i,j) and PHPUCCH(i,j), the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PH(i,j) or PHPUCCH(i,j); when the measured power headroom is PH' (i, j) and PH (i, j) , the power headroom in subframe i and the j component transporter group that is reported by the terminal in subframe i is PH' (i, j) or PHPUCCH (i, j) ; when the measured power headroom is PH(i,j) and PH(i,j) , the power headroom in subframe i and the j component transporter group that is reported by the terminal in subframe i is PH(i,j) or PHPUSCH(i, j) ; when the measured power headroom is PH' (i, j) and PH (i, j) , the power headroom in subframe i and the j component transporter group that is reported by the terminal in subframe i is PH' (i, j) or PHPUSCH(i, j) ; when the measured power headroom is PH(i,j) and PH(i,j) and PH(i,j) , the power headroom in subframe i and the j component transporter group that is reported by the terminal in subframe i is PHPUCCH+PUSCH (i, j) or PHPUSCH (i, j) or PHPUCCH (i, j) ; and when the measured power headroom is PH' (i, j) and PH (i, j) and PH (i, j) , the power headroom in subframe i and the j-component transporter group that is reported by the terminal in the subframe i is PHPUCCH+PUSCH (i,j) or PHPUSCH(i, j) or PHPUCCH(i, j) .
[0008]
8. Method according to claim 7, characterized in that the terminal mode determines the power headroom reported in subframe i and the component j carrier group comprises: when the measured power headroom is PH (i, j ) and PHPUCCH(i, j) , when PHPUCCH+PUSCH (i, j) —0 or PHPUCCH+PUSCH (i, j)>0, the free height of power in subframe i and the transport group of component j that is reported by the terminal in subframe i is PHPUCCH+PUSCH(i,j) ; and when PHPUCCH+PUSCH(i,j) <0 or PHPU^+PUSCH(i,j)—0, the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PHpUccH(i , j) ; or when PHPUCCH+PUSCH (i, j) — 0 or PHPUCCH+PUSCH (i, j) >0, the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PH (i, j ) ; and when PH(i,j) < 0 or PH^^+PUSCH(i,j) — 0 , the free height of power in subframe i and the component transporter group j that is reported by the terminal in subframe i is PHPUCCH+PUSCH ( i, j); or when the measured power free height is PH' (i, j) and when PHPUCCH+PUSCH (i, j) — 0or PHPUCCH+PUSCH (i, j) >0' the power free height in subframe i and the carrier group of component j that is reported by the terminal in subframe i is PH' (i, j) ; and when PHPUCCH+PUSCH(i,j) <0or PHPUCCH+PUSCH(i,j) — 0, the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PH(i,j ) ; or when PHPUCCH+PUSCH(i,J) — 0 or PHPUCCH+PUSCH(i,J) > 0, the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PHmccH(i,j ); and when PHPUOT+PugCH(i,j) < 0 or PHPUCCH+PUSCH (i, j) - 0 , the free height of power in subframe i and the component transporter group j that is reported by the terminal in subframe i is PHPUCCH+PUSCH ( i,j); or when the measured power free height is PH (i, j) and PHPUSCH (i, j) , when PHPUCCH+PUSCH (i, j) — 0 or PHPUCCH+PUSCH (i, j) >0, the power free height in subframe i and the j component carrier group that is reported by the terminal in subframe i is PH(i,j); and when PH (i, j) < 0 or PH (i, j) - 0 , the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PHPUCCH+PUSCH (i, j) ; or when PHPUCCH+PUSCH(i, j) — 0 or PHPUCCH+PUSCH(i, j) >0, the free height of power in subframe i and the component transporter group j that is reported by the terminal in subframe i is PHPUCCH+PUSCH(i , j); and when PHPUCCH+PUSCH(i, j) < 0 or PH(i, j) - 0, the free height of power in subframe i and the transport group of component j that is reported by the terminal in subframe i is PHPUSCH(i,j); or when the measured power free height is PH' (i, j) and PHPUSCH (i, j) , when PHpuccH+puscH(i, j) —0 or PHPUCCH+PUSCH(i, j)>0, the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PHPUSCH(i,j); and when PHPUCCH+PUSCH(i,j) <0or PHPUCCH+PUSCH(i,j) -0, the free height of power in subframe i and the component transporter group j that is reported by the terminal in subframe i is PHPUCCH+PUSCH(i, j) ; or when PHPUCCH+PUSCH(i, j) — 0 or PHPUCCH+PUSCH(i, j) >0' the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PH' (i, j); and when PHPUCCH+PUSCH (i, j) < 0 or PHPUCCH+PUSCH(Í,j) -0, the free height of power in subframe i and the component transporter group j that is reported by the terminal in subframe i is PHPUSCH (i, j ) ; or when the measured power headroom is PH(i,j) and when PHPUCCH+PUSCH(i,j) — 0or PHPUCCH+PUSCH(i,j)^0, the power headroom in subframe i and the component carrier group j which is reported by the terminal in subframe i is PHPUSCH (i, j) or PHPUCCH (i, j) ; and when PHPUCCH+PUSCH(i, j) < 0 or PHPUCCH+PUSCH(i, j) - 0 , the free height of power in subframe i and the component transporter group j that is reported by the terminal in subframe i is PHPUCCH+PUSCH ( i, j); or when PHPUCCH+PUSCH (i, j) —0 or PHPUCCH+PUSCH (i, j)>0, the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PHPUCCH+PUSCH( i,j); and when PHPUCCH+PUSCH(i,j) < 0 or PHro^+PUSCH(i,j) ^ 0, the free height of power in subframe i and the j component transporter group that is reported by the terminal in subframe i is PHpUscH(i, j) or PHpUccH(i, j); or when the measured power free height is PH' (i, j) and PHpUscH (i, j) and PHpUccH (i, j ), when PHPUCCH+PUSCH (i, j) — 0 or PHPUCCH+PUSCH (i, j) >0, the free height of power in subframe i and the j component carrier group that is reported by the terminal in subframe i is PH'(i,j); and when PHPUCCH+PUSCH (i, j) <0or PHPUCCH+PUSCH(i , j) ~0' the free height of power in subframe i and the component transporter group j that is reported by the terminal in subframe i is PHPUSCH (i, j ) or PHPUCCH (i, j) ; or when PHPUCCH+PUSCH (i, j) — 0 or PHPUCCH+PUSCH (i, j) >0' the power free height in subframe i and the component transporter group j that is reported by the terminal in subframe i is PHPUSCH (i, j ) or PHPUCCH (i, j) ; and whenPHPUCCH+PUSCH(i,j) < 0 orPHPUCCH+PUSCH(i,j) ^ 0 , the free height of power in subframe i and the component transporter group j that is reported by the terminal in subframe i is PHP'UCCH+PUSCH( i, j).
[0009]
9. Method according to claim 3 or 4, characterized in that the type and number of the power headroom(s) in subframe i and the component carrier group j that is reported by the terminal are configured by layer signaling higher.
[0010]
10. Method according to claim 1, characterized in that when the terminal only transmits the PUSCH in subframe i and the component carrier group j, and the terminal has new uplink transmission in subframe i, and there is an event that triggers the reporting the power headroom in subframe i and the component carrier group j, the terminal reporting the power headroom to the base station comprises: according to the priority of the logical channels, whether the uplink resource allocated to the terminal in subframe i is sufficient to support a power headroom MAC control element which is used to report the power headroom in subframe i and component j carrier group j and protocol data unit MAC subheader, then the terminal performs the operation of power headroom report in subframe i; or, when the terminal only transmits the PUSCH in subframe i and component carrier group j, and the terminal has new uplink transmission in subframe i and component carrier group j, and there is an event that triggers the power headroom report in subframe i ando component transporter group j, the terminal reporting the power headroom to the base station comprises: according to the priority of the logical channels, if the uplink resource allocated to the terminal in subframe i and the component transporter group j is sufficient to support a power headroom MAC control element which is used to report the power headroom in the subframe i and the j component carrier group and the MAC protocol data unit subheader, then the terminal performs the height reporting operation power-free in subframe i and the j-component carrier group; or, when the terminal only transmits the PUCCH in subframe i and the j component carrier group, and the terminal has new uplink transmission in an i+n subframe, and there is an event that triggers the power headroom report in subframe i and the carrier group of component j, the terminal reporting the power headroom to the base station comprises: according to the priority of the logical channels, if the uplink resource allocated to the terminal in the i+n subframe is sufficient to support a control element Power headroom MAC which is used to report power headroom in subframe i and component carrier group j and protocol data unit MAC subheader, then the terminal performs power headroom reporting operation in subframe i; in which the i+n subframe is the first subframe in which the terminal has new uplink transmission, after the i subframe; or, when the terminal only transmits the PUCCH in subframe i and component transport group j, and the terminal has new uplink transmission in subframe i+n and component transport group j, and there is an event that triggers the power headroom report in subframe i and component carrier group j, the terminal reporting the power headroom to the base station comprises: according to the priority of the logical channels, whether the uplink resource allocated to the terminal in subframe i+n and component carrier group j is sufficient to support a power headroom MAC control element that is used to report the power headroom in subframe i and the j component carrier group and the protocol data unit MAC subheader, then the terminal performs the power headroom reporting operation in subframe i and component conveyor group j; in which the i+n subframe is the first subframe in which the terminal has retransmission uplink in component carrier group j, after subframe i.
[0011]
11. Method according to claim 1, characterized in that the highest bit and/or the second highest bit of the power headroom MAC control element is used to indicate the type of power headroom reported.
[0012]
12. Method according to any one of claims 1 to 4 and claim 10, characterized in that the component carrier group includes only one component carrier; or the component carrier group includes all component carriers using the same terminal power amplifier; or the component carrier group includes all component carriers that the terminal can support.
[0013]
13. Terminal, comprising: a measurement module, configured to measure the free height of power in a subframe and a component carrier group, in the transmission of a shared physical uplink channel (PUSCH) and/or a physical uplink control channel (PUCCH) in the subframe and the component carrier group; and a transmission module, configured to report power headroom to a base station and indicating a type of power headroom reported in the report; wherein when the terminal simultaneously transmits the PUSCH and PUCCH in the subframe and the component carrier group, the measured power headroom in the subframe and the component carrier group is one of: PH PUCCH+PUSCH (i, j) and PH PUSCH(i,j); PHPUCCH+PUSCH (i, j) and PH PUSCH (i, j); PHPUCCH + PUSCH (i, j) ePHPUSCH (i, j) ePHPUCCH (i, j); ePHPUCCH+PUSCH (i, j) and PHPUSCH(i, j) and PHPUCCH(i, j) ; where, i is the subframe, and j is the component carrier group; wherein, P' (i, j) is the transmit power, which is estimated by the terminal, of the PUSCH transmitted in subframe i and the carrier group of component j; P' (i, j) is the transmission power, which is estimated by the terminal, of the PUCCH transmitted in subframe i and the carrier group of component j; and PCMAX(j) is the configured maximum output power, which is determined by the terminal, in subframe i and the j-component transporter group; and or PCMAX(j) is the maximum output power configured in component carrier group j, which is determined by the terminal assuming that there is only the PUSCH transmitted in component carrier group j; and PC''MAX(j) is the maximum output power configured in component carrier group j, which is determined by the terminal assuming that there is only the PUCCH transmitted in component carrier group j; characterized by the fact that the transmission module is configured to report the power headroom and power headroom type to the base station via the power headroom MAC control element.
类似技术:
公开号 | 公开日 | 专利标题
BR112012012473B1|2021-06-29|METHOD FOR PROCESSING POWER AND TERMINAL FREE HEIGHT
US9749970B2|2017-08-29|Power control and power headroom for component carrier
JP6633162B2|2020-01-22|Uplink power headroom management for connectivity with logically separate cells
US9668220B2|2017-05-30|Method and apparatus for controlling uplink power
BRPI1016121B1|2021-06-15|METHOD IN A WIRELESS COMMUNICATION TERMINAL THAT SUPPORTS AGGREGATE CARRIER ACCESS, AND WIRELESS COMMUNICATION TERMINAL THAT SUPPORTS AGGREGATE CARRIER ACCESS
EP2498554B1|2017-08-30|Power control method, base station and terminal for physical uplink control channel
BRPI1106757B1|2022-01-11|METHOD OF PERFORMING POWER SAFETY MARGIN REPORT AND COMMUNICATION DEVICE THEREOF
CN113055992A|2021-06-29|Method and apparatus for power control processing
JP2015500593A|2015-01-05|Uplink power control method and apparatus
US10412689B2|2019-09-10|Deriving PCMAX in dual connectivity
US8996055B2|2015-03-31|Method and apparatus for reporting a power headroom report | in a carrier aggregation scene
WO2013040954A1|2013-03-28|Uplink power control method and device
WO2018228536A1|2018-12-20|Method for determining power margin and network device
WO2019201253A1|2019-10-24|Power control method and apparatus, base station, terminal, and computer-readable storage medium
WO2015068039A2|2015-05-14|Method and apparatus for transmitting and obtaining power headroom report
WO2011097819A1|2011-08-18|Method and device for transmitting and receiving power head room report
JP6137200B2|2017-05-31|Mobile station, base station, power headroom report transmission method and reception method, and program
US20210099959A1|2021-04-01|Deriving configured output powers with overlapping durations under uplink pre-emption
WO2011137619A1|2011-11-10|Method and user equipment for reporting power headroom
US11076359B2|2021-07-27|Device, system, and method for adaptive transmission power allocation in uplink carrier aggregation
BR112012025180B1|2021-09-21|POWER HEADROOM REPORT
同族专利:
公开号 | 公开日
JP5603428B2|2014-10-08|
RU2515606C2|2014-05-20|
JP2013510523A|2013-03-21|
MX2012006608A|2012-07-03|
KR20120085258A|2012-07-31|
CN101778416A|2010-07-14|
US8711722B2|2014-04-29|
RU2012121423A|2014-01-10|
WO2011097878A1|2011-08-18|
US20120294167A1|2012-11-22|
KR101379259B1|2014-04-09|
ES2559727T3|2016-02-15|
EP2536198A1|2012-12-19|
CN101778416B|2015-05-20|
EP2536198A4|2013-07-24|
EP2536198B1|2015-10-21|
BR112012012473A2|2018-07-03|
引用文献:
公开号 | 申请日 | 公开日 | 申请人 | 专利标题

KR980007105A|1996-06-28|1998-03-30|김광호|Method for controlling transmission power of mobile station|
RU2386213C2|2005-09-22|2010-04-10|Мицубиси Денки Кабусики Кайся|Communication method|
CA2667296C|2006-10-31|2014-06-03|Qualcomm Incorporated|Random access for wireless communication|
CA2691230C|2007-06-20|2015-11-24|Nokia Siemens Networks Oy|Power headroom reporting method|
CN101340622B|2007-07-06|2012-01-11|中兴通讯股份有限公司|Distribution method of multi-carrier reinforced uplink power resource|
CN101640904B|2008-07-31|2011-11-30|电信科学技术研究院|Method and device for distributing bandwidth of uplink sounding reference signal|
CN101404527B|2008-11-11|2013-06-05|中兴通讯股份有限公司|Power-control parameter acquirement method and power control method|
KR20150023886A|2008-12-03|2015-03-05|인터디지탈 패튼 홀딩스, 인크|Uplink power headroom reporting for carrier aggregation|
CN101448308A|2008-12-30|2009-06-03|中兴通讯股份有限公司|Method for controlling physical uplink shared channel transmission power|
CN112584476A|2009-02-09|2021-03-30|交互数字专利控股公司|Method for uplink power control in WTRU and WTRU|
US8934417B2|2009-03-16|2015-01-13|Google Technology Holdings LLC|Resource allocation in wireless communication systems|
CN101715207B|2009-11-04|2014-12-31|中兴通讯股份有限公司|Method for measuring power headroom, method for reporting power headroom and terminal|
CN101778416B|2010-02-10|2015-05-20|中兴通讯股份有限公司|Measuring and reporting method of power climbing space and terminal|KR20150023886A|2008-12-03|2015-03-05|인터디지탈 패튼 홀딩스, 인크|Uplink power headroom reporting for carrier aggregation|
CN112584476A|2009-02-09|2021-03-30|交互数字专利控股公司|Method for uplink power control in WTRU and WTRU|
MX2012003894A|2009-10-01|2012-07-25|Interdigital Patent Holdings|Power control methods and apparatus.|
EP2317815A1|2009-11-02|2011-05-04|Panasonic Corporation|Power-limit reporting in a communication system using carrier aggregation|
CN101778416B|2010-02-10|2015-05-20|中兴通讯股份有限公司|Measuring and reporting method of power climbing space and terminal|
US9036494B2|2010-02-11|2015-05-19|Alcatel Lucent|Method and device for transmitting and receiving power headroom report|
US8908582B2|2010-02-12|2014-12-09|Qualcomm Incorporated|User equipment operation mode and channel or carrier prioritization|
CN102652447B|2010-02-12|2014-09-10|上海贝尔股份有限公司|Power control apparatus, power control method, transmitter and communication system|
CN102742331B|2010-04-01|2015-08-26|Lg电子株式会社|The method and apparatus of ascending power is controlled in wireless access system|
US8954106B2|2010-08-10|2015-02-10|Samsung Electronics Co., Ltd.|Method and apparatus for configuring power headroom information in mobile communication system supporting carrier aggregation|
CN102378239B|2010-08-11|2015-11-25|电信科学技术研究院|The reporting of power headroom, acquisition methods and device|
CN102387580B|2010-08-30|2015-08-12|中兴通讯股份有限公司|The report method of the power headroom reporting that carrier wave is corresponding and system|
CN102118786B|2010-09-29|2015-07-22|电信科学技术研究院|Method and equipment for processing PHRin carrier aggregation system|
CN102448160B9|2010-09-30|2016-06-15|中兴通讯股份有限公司|The method and apparatus of reporting power head room under carrier collection conditions|
KR101832175B1|2010-10-12|2018-02-27|삼성전자주식회사|Method and apparatus for determining maximum transmission power in mobile communication system for carrier aggregation|
US10728859B2|2010-10-12|2020-07-28|Samsung Electronics Co., Ltd.|Method and apparatus for determining maximum transmission power per carrier in mobile communication system supporting carrier aggregation|
US9144038B2|2010-11-05|2015-09-22|Samsung Electronics Co., Ltd.|Method and apparatus for calculating power headroom in carrier aggregation mobile communication system|
US9055565B2|2010-11-05|2015-06-09|Samsung Electronics Co., Ltd.|Method and device for activating secondary carrier in wireless communication system for using carrier aggregation technique|
KR101954185B1|2010-11-05|2019-06-03|삼성전자 주식회사|Method and apparatus for reporting power headroom information in carrier aggregation mobile system|
CN102469495B|2010-11-05|2015-08-12|中兴通讯股份有限公司|A kind of assessment of terminal power headrooms and report method and device|
EP2451222A1|2010-11-08|2012-05-09|HTC Corporation|Method of handling power headroom reporting for activated serving cell with configured uplink|
US8737333B2|2010-11-08|2014-05-27|Acer Incorporated|Method of power reporting and communication device thereof|
CN102045827B|2011-01-06|2013-07-31|大唐移动通信设备有限公司|Uplink power control method, power control parameter configuration method and equipment of methods|
CN102595490B|2011-01-10|2015-06-24|上海贝尔股份有限公司|Method used for transmitting power margin report in wireless communication network|
CN102647800B|2011-02-16|2016-09-14|华为技术有限公司|Power headroom processing method in carrier aggregation and subscriber equipment, base station|
CN102123437B|2011-03-03|2016-02-17|电信科学技术研究院|Power headroom reporting and the scheduling method of subframe, system and equipment|
CN102355733B|2011-09-30|2017-09-26|中兴通讯股份有限公司|The sending method and user equipment of a kind of Physical Uplink Control Channel|
BR112014007765A2|2011-09-30|2017-04-11|Interdigital Patent Holdings Inc|multicast transmission in wireless communication|
CN103582099B|2012-07-25|2018-06-19|中兴通讯股份有限公司|A kind of ascending power control method, terminal and base station|
EP2944134B1|2013-01-14|2019-12-04|Telefonaktiebolaget LM Ericsson |Handling uplink transmit power reporting|
CN103974319B|2013-01-29|2017-08-11|电信科学技术研究院|Power headroom reporting method and apparatus under carrier aggregation|
US9210670B2|2013-03-18|2015-12-08|Samsung Electronics Co., Ltd.|Uplink power control in adaptively configured TDD communication systems|
JP6244009B2|2013-04-03|2017-12-06|インターデイジタル パテント ホールディングス インコーポレイテッド|Method and apparatus for controlling uplink transmit power based on accumulated transmit power control commands and corresponding uplink subframe sets|
WO2015041407A1|2013-09-20|2015-03-26|Lg Electronics Inc.|Triggering power headroom reporting in tdd system|
US9883467B2|2014-03-06|2018-01-30|Sharp Kabushiki Kaisha|Terminal device, base station device, communication system, control method, and integrated circuit|
JP5890879B1|2014-09-25|2016-03-22|株式会社Nttドコモ|User apparatus, base station, uplink transmission power report method, and parameter notification method|
CN107682923A|2016-08-01|2018-02-09|北京三星通信技术研究有限公司|The method of power headroom reporting and corresponding user equipment|
JP6980814B2|2017-05-05|2021-12-15|エルジー エレクトロニクス インコーポレイティドLg Electronics Inc.|Power headroom reporting methods and equipment for them in wireless communication systems|
CN109151979B|2017-06-16|2020-12-15|华为技术有限公司|Power headroom determination method and network equipment|
CN109392072B|2017-08-14|2021-08-03|普天信息技术有限公司|Power headroom calculation method|
US10827441B2|2018-06-20|2020-11-03|LenovoPte. Ltd.|Power headroom report generation|
法律状态:
2019-01-08| B06F| Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]|
2020-03-03| B06U| Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]|
2020-03-10| B15K| Others concerning applications: alteration of classification|Free format text: AS CLASSIFICACOES ANTERIORES ERAM: H04W 24/08 , H04W 24/10 , H04W 52/00 Ipc: H04W 52/14 (2009.01), H04W 52/36 (2009.01), H04L 5 |
2021-05-25| B09A| Decision: intention to grant [chapter 9.1 patent gazette]|
2021-06-29| B16A| Patent or certificate of addition of invention granted|Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 18/08/2010, OBSERVADAS AS CONDICOES LEGAIS. PATENTE CONCEDIDA CONFORME ADI 5.529/DF, , QUE DETERMINA A ALTERACAO DO PRAZO DE CONCESSAO. |
优先权:
申请号 | 申请日 | 专利标题
CN201010111052.8|2010-02-10|
CN201010111052.8A|CN101778416B|2010-02-10|2010-02-10|Measuring and reporting method of power climbing space and terminal|
PCT/CN2010/076117|WO2011097878A1|2010-02-10|2010-08-18|Power headroom processing method and terminal|
[返回顶部]